Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    ANFO’S Behavior in Height-To-Detonation and other Thermal Stimulus Tests

    By E. Contestabile, B. von Rosen, P. Lightfoot

    As part of an accident investigation ANFO was subjected to various abusive tests. A tractor-trailer carrying 18,000 kg of blasting explosives, caught fire, burned for approximately 30 minutes, and the

    Jan 1, 2001

  • ISEE
    Underground Remote Firing System

    By Tom Paynter

    In an underground mining environment, the primary method of firing a blast is using a combination of an electric detonator and a detonating cord to initiate the Nonelectric detonators. This method has

    Jan 1, 2017

  • ISEE
    Blasting Specifications and Guidelines for Protective and High-Profile Blasting

    By Brian Lewis, Reinhold Daykin Schnell

    Blasting specifications and guidelines are very important aspects of detailed project specifications covering any scope of work (SOW) that involves explosives and blasting procedures. A lot of larger

    Feb 6, 2023

  • ISEE
    Calorimetric Determination of the Heat of Detonation of Commercial Explosives

    By Q Liu, P D. Katsabanis

    The energy output of crushed AN/FO, crushed AN/FO mixed with Aluminum (5%, 6.4% and 9.4% A1 by mass) and a commercial emulsion explosive has been measured using a detonation calorimeter. The charges h

    Jan 1, 1993

  • ISEE
    Determination of Blast Vibration Limits by Direct Strain Measurement

    By Adrian Moore, Alan Richards, Andrew Brodbeck

    Structural blast vibration limits should be based on the strength of the structure, the stress induced by blasting, and a responsible factor of safety. In this paper a methodology that uses direct str

    Feb 1, 2020

  • ISEE
    The Use of Seismic Measurements to Determine the Blastability of Rock

    By R R. Dimock

    A goal of all mine operators is to optimize the breakage of the inplace rock to achieve maximum excavating efficiency. The use of the seismograph at Kennecott Copper Corporation's Nevada Mines Divisio

    Jan 1, 1976

  • ISEE
    Stope Blast Improvement by a New Blast Design in Leeville Underground Mine

    By Miquel Lamadrid, Changshow Sun, Chris Johnson

    To reduce blasting overbreak and improve stope stability, several new blast designs were proposed for current and future stopes. Based on the analysis of the powder factor, and the extent of damage zo

    Jan 1, 2008

  • ISEE
    Northern Link - Tunnel Blasting In Environmentally Sensitive Surroundings - Using NCVIB

    By Donald Jonson

    Stockholm’s Northern Link, currently Europe’s largest urban road tunnel project, will be about 5 km long from west to east. Running through two separate, mostly parallel tunnels, each with 2-4 lanes,

    Jan 1, 2009

  • ISEE
    Half-Way House - Controlled Demolition Group "Rocks the Casbah" with Tricky Special-Effects-Laden Blast

    By Jane Wright, Brent Blanchard

    Question: When it comes to demolition projects, what could be more demanding than asking a blaster to explosively demolish a stubby, heavily-reinforced concrete structure in the heart of a third-world

    Jan 1, 2002

  • ISEE
    Iron Ore Company of Canada (IOCC) Blast Optimization with Emulsion Explosives

    By M Lemieux, R Mason

    The SABREX blast modeling program was introduced to I.O.C.C.'s Carol Lake Iron Ore Project in December 1987. As part of CIL's Technical Services, SABREX was used to implement an optimization program d

    Jan 1, 1989

  • ISEE
    Changing Powder Distribution in the Highwall Holes Reduces Overbreak and Rockfall Hazards

    By Virgil J. Stachura, Calvin L. Cumerlato

    The Bureau of Mines conducted a series of tests to develop a blasting method that would reduce overbreak and rockfall hazards at a limestone quarry in northeastern Wisconsin. Reductions in overbreak w

    Jan 1, 1989

  • ISEE
    New Developments in Seismic Explosives

    By Oldrich Machacek

    Seismic explosives are very important tools in the search for oil and gas. Changes and new techniques in seismic exploration methods are also demanding new developments in seismic explosives. This art

    Jan 1, 1985

  • ISEE
    Trends in Drilling and Blasting (8aa24a46-8326-4148-8007-63f421ba2d8b)

    By Alan Bauer

    During the past several years, the trend to large-diameter blastholes in both open pits and underground mines along with the continuing developments in slurried explosives and delay systems has kept t

    Jan 1, 1978

  • ISEE
    Tester for SCB Detonators

    By John Arrell, James Stuart

    We have developed a tester that is uniquely able to measure the no-fire power level of certain types of electro explosive devices (EEDs). In the past, it has been difficult to establish a no-fire powe

    Jan 1, 2011

  • ISEE
    A Holistic Approach to Developing a Narrow Cutback at an Open Cut Copper Mine

    By Stephen Mansfield, Nathan West, El Khalil Seyed

    In October 2017, a multi-bench failure occurred in the east wall of the Guelb Moghrein copper and gold mine in Mauritania. The failure extended 100 m (328 ft) vertically and horizontally and resulted

    Jan 21, 2025

  • ISEE
    Silently Controlling Cracking Technology

    By Guang-Xin Li, Rui-Ping Guo

    Based on the analysis of factors affecting the cracking performance of Silently Cracking Agent (SCA), a new SCA structural model is built and a study on the swelling mechanism of SCA and a method to i

    Jan 1, 2000

  • ISEE
    Blasting a Narrow Orebody at Bong Mines, Liberia

    By Dieter Froelich, Giles Turcotte

    In the near future, Bong Mining Company (BMC) will start mining a new deposit known as Zaweah II which is a narrow iron orebody requiring multiple row blasts with the bench floor as a free face. This

    Jan 1, 1980

  • ISEE
    Excavation for Underground Salt Plant (1f20b243-bfe6-4609-ad5c-cf707711398b)

    By Steven P. Case

    To meet salt production needs over the remaining life of the Cayuga Mine at Lansing, New York, the Salt Division of Cargill, Inc. decided to build a new underground screening plant. The new plant requ

    Jan 1, 1996

  • ISEE
    A New Digital Centralized Blasting System

    By Peter Reinders, Dirk Hummel

    This paper describes a new digital Centralized Blasting System (CBS), which is currently being introduced into underground applications. The CBS makes use of the field-proven detonator and equipment t

    Jan 1, 2004

  • ISEE
    Facing the Drilling and Blasting Difficulties at Helwan Quarry, Egypt

    By M. Khaled, K. Abdel Rahman, M. Khattab

    Helwan limestone quarry is located at a distance of 35 km (21.7 miles) to the south of Cairo downtown. Drilling and blasting operations are used to extract the limestone for the Helwan Cement Company

    Jan 1, 2008