Risks Associated With Finite Element Modelling Of Cut And Cover StructuresBy Tony Suckling
The commercially available finite element program Plaxis has a key benefit over other finite element analysis programs in that it has a relatively simple user interface to input and output data. This
Jan 1, 2010
-
Case Study: Natomas Levee Improvement Program Cutoff WallsBy Matthew D. Marks
"The Sacramento Area Flood Control Agency initiated the Natomas Levee Improvement Program in 2006 which would bring the entire 42 mile Natomas Basin perimeter levee system into compliance with applica
Jan 1, 2017
-
Slurry Trench Design and Construction in Difficult ConditionsBy Peter Deming
"PART 2 OF 2 (CONTINUED FROM SUMMER 2006 EDITION) CONSTRUCTION ISSUES (cont’d) The Influence of Ground Conditions on Collapse Sand and gravel strata provide frictional resistance to support active ear
Jan 1, 2006
-
Full-Scale Tests To Evaluate Lateral Pile Resistance At The Edge Of A SlopeBy Artak D. Mirzoyan
Pile foundations near the edge of a slope are often required to resist lateral loads. This is particularly important for piles at abutments of bridges. However, very few full-scale tests are availab
Jan 1, 2007
-
The Micropile Network: Practice Precedes TheoryBy Gary M. Weinstein
Micropiles have seen increasing use for foundation support and slope stabilization applications over the past half century. Most often designed and installed in groups of vertical or battered elements
Jan 1, 2003
-
Integrity Evaluation Of Driven Concrete Piles Utilizing Embedded Data CollectorsBy Donald T. Robertson
This paper presents case histories of driven concrete pile damage detected with dynamic testing methods utilizing strain gages and accelerometers embedded in the pile at the prestressing yard during p
-
Integrity Evaluation of Driven Concrete Piles Utilizing Embedded Data Collectors (ac1e1b32-2f59-488d-aca4-5ee1b43eb226)By Donald T. Robertson, Kurt Hecht, Michael K. Muchard
"This paper presents case histories of driven concrete pile damage detected with dynamic testing methods utilizing strain gages and accelerometers embedded in the pile at the prestressing yard during
Jan 1, 2017
-
Numerical Analysis Of The Pile-Enhanced Raft Of The Queen Elizabeth II Conference Centre In London, UKBy Trevor I. Addenbrooke
Stress reducing piles were used for the first time at the Queen Elizabeth II Conference Centre near the Palace of Westminster in London, UK. The inclusion of these piles directly beneath heavily loade
Jan 1, 2002
-
Suwanee American Cement Plant, Branford, Florida: A Case Study Of Large Diameter Continuous Flight Auger Design Build FoundationsBy Gordon King
This paper presents a case study of large diameter continuous flight auger (CFA) piles and drilled shafts utilized for foundation support of a series of heavily loaded cement plant structures at the S
Jan 1, 2003
-
Pier Design And Construction In Water Bearing Soils ? SynopsisBy C. N. Baker
The design and construction of drilled piers through water bearing and caving soil conditions are discussed. The need for close cooperation between the design engineer and contractor in both the desig
Jan 1, 2010
-
Session 15 "Jet Grouting IV"By Mitsuhiro Shibazki
I can't answer that question but I am looking at Andy, my co-author, and he says we didn't measure it. No movement. If I understand it correctly, how do we handle lateral forces in shear? T
Feb 10, 2003
-
Lessons Learned From Mitigating Early Project Delays To Deep Foundation WorkBy Jeffery L. Ottesen
Early construction delays can jeopardize timely completion of subsequent work. As an early construction activity, and due to many unforeseen issues, deep foundation work inherently bears great potenti
Jan 1, 2002
-
Wireless Site Data Collection In Construction And Its Impact On The Business ProcessBy Jason N. Scott
It is now possible using low-cost wireless technology and rugged hand-held devices to record data on site electronically and for that data to be instantly available to others. This could potentially e
Jan 1, 2006
-
Analysis Of Vibratory Driven Pile ? IntroductionBy Sherrill Gardner
Vibratory drivers have been used since the 1930s to drive and extract piles. Vibratory pile drivers have the capability of significantly decreasing pile installation time, especially in granular type
Jan 1, 1987
-
“Digital Specialist Foundations”- Using The Digital Twin During Project ExecutionBy Marcus Daubner
This paper explains how BAUER Spezialtiefbau GmbH uses digital methods on projects - starting from work preparation to completion of works. More precisely, the advantages of BIM-based planning during
Sep 1, 2022
-
R C Harris Water Filtration Plant Expansion - Excavation Support Design, Installation and PerformanceBy Michael Cianchetti, Nadir Ansari, Matthew Janes
"PROJECT DESCRIPTIONThe R C Harris Filtration Plant underwent an expansion to install an underground sludge treatment capability consisting of a series of underground tanks within stepped excavations
Jan 1, 2007
-
Innovative Use Of Ground ImprovementBy Mark Koelling
This paper presents a case history of a ground improvement program conducted in a soft soil environment and seismically active region in the northwest corner of Washington State near the Canadian bord
Jan 1, 2010
-
Assessment Of Safe Load On Piles Using Indian Standard Codeprivate ? SynopsisBy Shenbaga R. Kaniraj
The pile loading tests are generally conducted to assess the safe load on piles in compression. In the Indian practice, the safe load is determined using the pile loading test data and the two criteri
Jan 1, 1996
-
Surprises And Solutions When Driving Piles In Mountain Valleys Of VermontBy John E. Lens
Driving bridge foundation piles into glacio-fluvial sands and gravels and glacial tills brought surprisingly longer than predicted driving lengths on several recent projects in Vermont. In some insta
Jan 1, 2007
-
Designed, Load Tested, Installed, And Integrity Tested ACIP Piles At Lovers' Key Site In Southwest FloridaBy Gregory A. Stephan
A case history of design, prediction, instrumented static load tests on probe piles, installation monitoring, and integrity testing of production piles is presented. Based upon project-specific subsoi
Jan 1, 1999