Experimental Study on the Bending Failure Properties of Cement-Treated SoilBy Takeru Fukaya, Tsutomu Namikawa
"The bending tensile stress occurs in the ground improvements when external forces are applied to the column and wall shaped ground improvements. Therefore, in the design of the column and wall shaped
Jan 1, 2015
-
Session 10 Deep Mixing Method IBy Peter Cali
There is one organization in Sweden, The Swedish Deep Stabilization Research Centre, which has been working with these questions and there is also a project, Eurosoilstab, within European Union to tak
Feb 10, 2003
-
Integrity Testing Methods"Integrity tests refer to a variety of non-destructive tests (NDT) whose purpose is to measure or determine the quality and uniformity, and some- times dimensions, of cast-in-place concrete foundation
Jan 1, 2004
-
Session 8 " Jet Grouting and Deep Mixing"By Masaki Kitazume
Five papers were presented orally to the topics of Jet Grouting and Deep Mixing. The session was started with a brief introduction by the moderators. Following the oral presentation, floor discussions
Feb 10, 2003
-
Deep Mixing Column Group Reinforcement by a Shallow Mixing Layer bBeneath an EmbankmentBy Tomohide Takeyama, Binh T. T. Nguyen, Masaki Kitazume
"Deep mixing columns are widely used to support embankments constructed on soft ground area. Researches on the stability of deep mixing columns were done by some authors when the columns do not simult
Jan 1, 2015
-
Comparison of Numerical Predictions Using P-Y Curves and Finite Element Analyses of Monopiles of Ocean Energy Converters under a Very Large Number of Low Amplitude Lateral Load CyclesBy Deepak Pappusetty, Miguel A. Pando
This study is motivated from the increased interest in recent years to explore use of Ocean Energy Converters (OEC’s).OEC’s can be tidal or generate electricity from wave or current action. Design of
Jan 1, 2015
-
Soil Improvement in Marina Coastal Expressway Project (C485) with Cement Deep Mixing (CDM) MethodBy Yoshinori Kurumada, Tatsuo Nagatsu, Keiji Uchida
"Cement deep mixing method has been utilized in the process of construction of an underwater tunnel in Singapore. The soil was improved by this method to prevent undesirable heaving of the soil below
Jan 1, 2015
-
Downdrag Effects on the Pile Groups Supporting Bridge AbutmentsBy M. Hesham El Naggar, Tony Sangiuliano, Alper Turan
"Bridge abutments supported on pile foundations are often constructed over weak and compressible soils. The consolidation settlements induced by the embankment loads are known to result in downdrag an
Jan 1, 2015
-
Seven Mile Dam Retrofit - A Global ChallengeBy Arvindh Gupta
BC Hydro proposed to improve the stability of the existing Seven Mile Dam with 54 corrosion protected, re-stressable anchors comprising 92/0.6? strands each, in phase 2 of the program. Being globally
Jan 1, 2004
-
Lateral Load Testing Of Pile FoundationsBy Anne Lemnitzer
Full-Scale cyclic field testing was performed on a 3x3 pile group consisting of nine cast-in-drilled-hole (CIDH) reinforced concrete shafts and a comparable single-shaft in order to investigate group
Jan 1, 2010
-
Optimisation Of Pile Type To Support Major Structures Above A Deep Sand Profile - SynopsisBy P. Davies
The Hillside Smelter presently under construction at Richards Bay, Republic of South Africa, will be, on completion, the fifth largest aluminium smelter in the world. The site selected for this plant
Jan 1, 1996
-
Full Scale Loading Tests Of NF Pile ? SynopsisBy M. Nomura
This paper describes the results and field measurements of two long-term observation tests and two short-term loading tests to confirm the effectiveness of NF piles in reducing negative skin friction.
Jan 1, 2010
-
Ground Improvement Resulting From Installation Of Drilled Displacement PilesBy Timothy C. Siegel
Drilled displacement piles (also known as augered cast-in-place displacement piles or augured, pressure grouted displacement piles) are installed by the displacement of soil and subsequent placement o
Jan 1, 2007
-
Practice Of Arranging Drilling Piles In Subsiding GroundsBy Vladimir M. Korolev
The field studies conducted at the experimental-production sites allowed to develop the technology of arranging drilling piles in loess subsiding grounds over 25 m deep and over 250 mm in diameter, to
Jan 1, 2002
-
Optimization Of Pile Length Using Decision Analysis With Information From Load Tests During ConstructionBy Jiun-Yih Chen
Pile load tests are regularly used to verify pile capacities. Sometimes, they are used to optimize pile designs. This paper presents a case study based on a real project, in which the information ob
Jan 1, 2009
-
The Effects Of A Direct Electrical Current On The a Value Of Metallic Piles In Clay - SynopsisBy Stephen T. Bloomer
The application of a direct current electrical potential between a metallic pile and a fine grained soil results in an almost instantaneous change in the magnitude of the forces acting on the pile.
Jan 1, 1996
-
Micro-Biological Attack On Deep Foundation ConcreteBy Piotr D. Moncarz
As major urban areas begin to run out of "good-terrain" for their expansion, they begin to claim high water-table areas within or adjacent to water fronts or swamps. Similarly, major infrastructure pr
Jan 1, 2002
-
Innovation In Spliced Prestressed Piles: Testing And Use Of The Emeca Pile SpliceBy John C. Ryan
The Emeca Pile Splice, an innovative mechanical prestressed concrete pile splice, is the first robotically welded splice to be fabricated in the United States. An analytical and experimental study wa
Jan 1, 2010
-
Cape Wind Offshore Wind Farm – Electrical Service Platform – Substructure Jacket DesignBy S. Chilka, I. Maloney, J. Brady
"The purpose of this project was to design the Electrical Service Platform (ESP) for the Cape Wind Offshore Wind Farm. The ESP structure comprises two primary parts: the topside platform housing the e
Jan 1, 2017
-
Case Study: Natomas Levee Improvement Program Cutoff WallsBy Matthew D. Marks
The Sacramento Area Flood Control Agency initiated the Natomas Levee Improvement Program in 2006 which would bring the entire 42 mile Natomas Basin perimeter levee system into compliance with applicab