    Design And Construction Of A Micropile Wall To Stabilize A Railway Embankment.

    By Jim Bruce

    This paper presents details of a slope stabilization scheme built in late 2003 at a 16m-high railway embankment in southern Ontario, Canada. The owner, faced with continuing maintenance and safety iss

    Jan 1, 2004

  • DFI
    Cut-Offs in Temporary Coffer Dams As Seepage Barriers for Concrete Dam Construction –A Case Study of Teesta –V H E Project in Sikkim (India)

    By I. D. Dayal, Anil Kumar Jain

    "Cutoff walls are frequently used to slow down or prevent seepage of water through and/or around dams. Cutoff wall is a type of seepage barrier structure designed to reduce the flow of water underneat

    Jan 1, 2016

  • DFI
    Monotonic And Cyclic Lateral Full-Scale Testing Of Reinforced Helical Pulldown Micropiles

    By M. Meckkey El Sharnouby

    In this paper, the results of full-scale field testing of reinforced helical pulldown micropiles (RG-HSP) installed in clayey till soils and resting on sandy soils are presented. Piles were tested und

    Jan 1, 2011

  • DFI
    Keynote Lecture 5: Giovanni Lombardi Grouting of Rock Masses

    By Giovanni Lombardi

    In order to get a clear overview of the grouting works carried out, to avoid misinterpretations of the data and functions shown on the display of the grout monitoring device, it is recommended to keep

    Feb 10, 2003

  • DFI
    Deep Drilling at Mica Dam, British Columbia

    By Douglas G. Baker, Jason K. Braund-Read, Megan R. Sheffer

    "Mica Dam, owned by British Columbia Hydro, is an 820 ft high earthfill embankment dam that was completed in 1973. The dam consists of a thin central impervious till core supported by upstream and dow

    Jan 1, 2017

  • DFI
    TBM Recovery Shaft Construction - SR-99 Tunnel

    By Lance Rasband, Richard Hanke, John Starcevich

    "The 17.4 meter (57 ft) diameter tunnel boring machine (TBM), the world’s largest at the time of her launch in 2012, locally referred to as “Bertha,” is stuck. Incapacitated due to mechanical failure

    Jan 1, 2016

  • DFI
    Session 24 "Compaction Grouting and Consensus Guide"

    By Richard Berry

    The spacing of grout injections is typically about 2 to 2 V½ meters if the purpose of the grouting is densification of the in-situ soils. Hole spacing will vary with the in-situ soil properties and th

    Feb 10, 2003

  • DFI
    Design Build & Failure: Perils at a High Risk Shoring and Retaining Wall Project.

    By Mark Spence, Tom Lardner, Matthew Janes

    "IntroductionThe design-build method streamlines project delivery through a single contract between the Contract manager and the design-build team. The design-build method places emphasis on collabora

    Jan 1, 2015

  • DFI
    Research on Strength Characteristics of Cement-Treated Soils at Construction Joints

    By Naoyuki Hanawa, Takeo Asanuma, Tatsuo Nagatsu, Sachihiko Tokunaga, Daisuke Nakagawa, Yoshiyuki Morikawa, Kazuhiko Ueno

    "In the cement deep mixing (CDM) method, one approach to joint construction is creating a surface-contact joint. In this study, an unconsolidated-undrained triaxial compression test was performed on c

    Jan 1, 2015

  • DFI
    Soil Mixing And Jet Grouting Ground Improvement Under Tanks

    By Lisheng Shao

    Soil mixing and jet grouting have been widely used to support heavy structures such as tanks, cement silos, and storage buildings. Although the installation methods vary between soil mixing and jet g

    Jan 1, 2010

  • DFI
    UHE Peixe Angical: Secant Cutoff Wall in Uncertain Geology

    By Dario Libano, Armando Caputo, Francisco Caputo

    "UHE Peixe Angical is a 452 MW hydroelectric power plant located on the Tocantins River in Tocantins, Brazil. In 1999, geologists began feasibility studies to estimate the river’s hydroelectric potent

    Jan 1, 2009

  • DFI
    The Resonant Driver: Ultra High Frequency Pile And Casing Installation

    By Matthew Janes

    The installation of piles and casings is becoming increasingly difficult as restrictions on vibration become common in major urban areas. The use of high frequency, resonant excitation of a pile or c

    Jan 1, 2008

  • DFI
    Challenging Ground Conditons during Flooding Lead to Innovative Deep Foundation Design Process and Load Test Evaluation

    By Glen M. Bellew, James F. Mehnert

    "The Kansas City District-United States Army Corps of Engineers has completed the design modification of a pile supported floodwall located along the Missouri River in Kansas City, Kansas. This deep f

    Jan 1, 2016

  • DFI
    A Study Of Failure Mechanism And Uplifting Capacity Of Tension Pile Foundation ? Synopsis

    By K. J. Yang

    Based on investigations and model tests combined with pile foundation on Code compilation of drydocks, we present this report to give informations against uplift pressure of piles beneath floor of dry

    Jan 1, 2010

  • DFI
    2013 OPA Winner: Wolf Creek Dam Rehabilitation

    By Fabio Santillan, Michael F. Zoccola

    "Wolf Creek Dam and Lake Cum berland in Russell County Kentucky is operated by the United States Army Corps of Engineers (USAGE) Nashville District It is a combination 3,940 ft long (1,200 m) non-zone

    Jan 1, 2013

  • DFI
    Sunrise Powerlink: An Innovation in Foundation Design

    By Steve Davidow, Nick Salisbury

    "The Sunrise Powerlink project received numerous industry awards for excellence. The DFI C. William Bermingham Innovation Award recognized the innovative use of prefabricated steel micropile caps to i

    Jan 1, 2014

  • DFI
    Use of Post-Grouted Drilled Shafts in Coastal Mississippi

    By Jacob A. Jordan, Rachel M. Garrett, W. Robert Thompson III, James C. Pegues

    "Environmental control structures for an existing fossil-fuel power generating plant near Pascagoula, Mississippi faced several design and construction challenges due to space limitations. Conceptual

    Jan 1, 2015

  • DFI
    Dynamic Load Testing Of Augered Cast-In-Place Piles (Rausche)

    By Frank Rausche

    The more widespread use of Augered Cast-in-Place (ACIP) Piles has generated increased demand for improved quality control measures. These deep foundation elements are often relatively long and slender

    Jan 1, 2001

  • DFI
    Design of Pile Foundations in Liquefiable, Laterally Spreading Grounds

    By Arash Khosravifar

    One of our research thrusts at Portland State University (PSU) centers on developing design guidelines for pile foundations in liquefiable, laterally spreading grounds. This research has been primaril

    Nov 1, 2023

  • DFI
    Session 25 "Grout Mixtures and Materials I"

    By Stephan Jefferis

    It is my understanding that the Scandinavians have done some fundamental work on durability. I have seen a study published whereby the author, Helen Anderson, comments on the durability of polyurethan

    Feb 10, 2003