Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Necessity Driving Change and Improvement to the Cleaner Circuit at Lumwana Copper Concentrator
By G. Cordingley, A. Mwanza
Lumwana is an open pit Copper mine located in the Northwestern Province of Zambia approximately 80 km west from the provincial capital of Solwezi, approximately 300 km northwest from the Copperbelt an
Jan 1, 2014
-
Reflectance Spectroscopy with X-Ray Fluorescence for Rapid Slurry Analysis
By Olli Haavisto, Juha Timperi
"Accurate on-line assays of mineral slurries are the basis for effective operation of flotation circuits. Typically the elemental content measurements are obtained by an X-ray fluorescence (XRF) analy
Jan 1, 2016
-
Investigation of Block Geometrical Properties of the Shale-Limestone Chaotic Complex bimrock of The Santa Barbara Open Pit Mine (Italy)
By N. Coli
The exhausted Santa Barbara open pit mine (Tuscany, Italy), owned by the main electric power company in Italy (ENEL S.p.A,) extracted lignite as a fuel for the Santa Barbara thermoelectric power plant
May 1, 2009
-
Towards Optimum Value in Underground Mine Scheduling
By Bryan M. Maybee
The scheduling of underground mining activities is a complex task, in particular because of the requirement to satisfy a large number of constraints. A Schedule Optimization Tool (SOT) for underground
May 1, 2009
-
High Fidelity Simulation of Full Mill Transport and Breakage in SAG/AG and Pebble Mills
By John A. Herbst, Alexander Potapov, Xiangjun Qiu
"High Fidelity Simulation is a name applied to the use of first principles modeling tools including Discrete Element Modeling (DEM), Computational Fluid Dynamics (CFD) and Discrete Grain Breakage (DGB
Jan 1, 2003
-
Back Caving Mechanism and Preventive Measures for Deep Open Stopes ? Case Studies
By Jerry Ran
Stope back caving in a mine using open stope mining interrupts the planned mining sequence and causes oversize muck and dilution with adverse economic implications. As many underground mines are minin
May 1, 2004
-
150th Anniversary Victoria Bridge, 1859 - mid-December, first train; 1860 August, celebration
By H. J. McQueen
ORDER OF PRESENTATION ?INTRODUCTION TO THE VICTORIA BRIDGE ?REASONS FOR A BRIDGE AT MONTREAL ?RAILROAD BRIDGE REQUIREMENTS ?IRON PRODUCTION CANADA / WORLD AL ?METALLURGICAL INDUSTRY CANADA ?FA
May 1, 2011
-
Rock Strength Characterization for Excavations in Brittle Failing Rock
By B. H. Kim
It is hypothesized that the standard approach adopted to characterize the ground and to determine the rock strength properties at depth are flawed and generally tend to underestimate the rock strength
May 1, 2009
-
Optimization of cable bolting pattern for cut-and-fill stopes in a manganese mine using observational, empirical, and numerical modelling approaches
By A. Sinha, N. K. Babar, H. R. Kalihari, A. K. Chakraborty, M. R. Saharan, C. P. N. Pathak
A case study is presented on the optimization of cable bolting patterns in cut-and-fill stopes at the Chikla Mine, MOIL, India. Rock mass characterization, using Bieniawski’s RMR and Barton’s Q, indic
Jan 1, 2007
-
Design, Implementation, and Commissioning of the Gibraltar Development Plan 3
By S. A. H Tyrrell, R. Rotzinger
"Taseko Mines Limited recommenced operation of the Gibraltar copper-molybdenum mine in 2004 and embarked on series of development projects to modernize the mine and increase throughput capacity. The G
Jan 1, 2014
-
How much is TOO much? A statistical look at bench flotation data and re-circulating chemical concentrations
By Thomas R. Larson
"Many concentrators use re-circulating “plant” water for dilution in their flotation circuits. However, if crusher dust suppressants, ball mill grinding aids, or even agitator bearing grease are intro
Jan 1, 2002
-
Lifter Design Using a DOE Approach with a DEM Charge Motion Model
By Ian Orford, Peter Radziszewski, Lud Strah
"An autogenous grinding circuit was commissioned at the Brunswick concentrator in October 1998. The AG mill was subsequently converted to SAG operation in May 1999 for a number of reasons. The mill ha
Jan 1, 2003
-
The Separation and Testing of Contaminated Site Materials Using Mineral Processing Technology
By Michael J. Lord, Richard H. O. Wagner
"The technologies used in the mineral processing of ores are being increasingly applied to the identification and remediation of metal contaminated industrial, military and landfill sites. The objecti
Jan 1, 1999
-
Geology of the Ore Fault Ni-Cu Deposit, Bird River Sill Complex, Manitoba
By P. Walford, C. Mealin, D. Good
"The geology of the Ore Fault Ni-Cu deposit has been reinterpreted in the light of recent studies of the geology of the Neoarchean Bird River Sill Complex and the occurrence of economic Ni-Cu and Zn-C
Jan 1, 2009
-
Formation of Schwertmannite-Like and Scorodite-Like Coatings on Pyrite and its Implications in Acid Mine Drainage Control
By N. Hiroyoshi, R. D. Corpuz, M. Ito, Hokkaido University, C. B. Tabelin, S. Veerawattananun
"Acid mine drainage (AMD), the very acidic and heavy metal-contaminated leachate generated when pyrite-bearing rocks are exposed to surface oxidizing conditions, is a serious environmental problem enc
Jan 1, 2016
-
Goldcorp’s Penasquito Pyrite Leach Project
Peñasquito is Mexico's largest gold producer, consisting of two open pits - Peñasco and Chile Colorado - containing gold, silver, lead and zinc. Over the next three years, mining activities in the pit
Jan 1, 2017
-
Rubber Liners in the Service of Large Diameter Ball Mill at Hudbay, Constancia Mine, Peru
By Manuel Sanchez, Marcial Medina, Matt Hurley, Hugo Granados, Pramod Kumar, Raj Rajamani, Jose A. Delgadillo
"Large-diameter ball mills have traditionally used steel liners—steel being a highly durable material that can be shaped into any desired geometry, among which the double-wave has been the preferred d
Jan 1, 2017
-
Introduction of and Experience Gained With Cemented Hydraulic Fill at the Gossan Hill Mine, Western Australia (5fc42dae-6b1c-469d-926f-1a8ca2654f54)
On the 26th of June 2000 a hydraulic fill retaining barricade failed at the Bronzewing mine in Western Australia. The barricade failure resulted in the release of 19,000 m3 of saturated hydraulic fil
May 1, 2007
-
Operation and Improvements at the El Indio Roasting Facility
By John Frostiak, Lloyd Buckingham, Kenneth G. Thomas, Luis Wilson
"The El Indio roasting facility associated with El Indio Mine in Central Chile has operated since 1981. It is a facility developed to remove arsenic and antimony from gold bearing enargite/pyrite flot
Jan 1, 1999
-
Implementing Best Practices of Metal Accounting at the Strathcona Mill
By Donald Leroux, Asim Tuzun, Simon Gariépy, Luc Lachance, Hayley Halsall-Whitney
"The importance of coherent material balance results has long been recognized by mining and metallurgical companies. Although this is still true nowadays, various stakeholders are increasingly concern
Jan 1, 2012