Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Autogenous milling — Effects on flotation of Mt. Lyell Copper ore Broyage autogène — Effets sur la flottation du minerai de cuivre de Mt. Lyell

    By N. C. Clarke, T. Wu, M. le Page, K. J. Henley

    In 1994, Gold Mines of Australia acquired the rights to the historic Mt. Lyell copper mine, and commenced a feasibility study into expanding production. The ore was shown in laboratory tests to be ame

    Jan 1, 2002

  • CIM
    The Ecstall Story

    By R. D. Mollison

    "Ecstall Mining Limited was formed to operate the Kidd Creek mine, discovered by Texasgulf Incorporated in 1961 the orebody is geologically very complex, containing rich values of zinc, copper, silver

    Jan 1, 1974

  • CIM
    Application of Huate® New Style Elutriation Electromagnetic Separator in Magnetite Beneficiation Technonogy

    By Shichang Liu, Hongli Jia, Zhaolian Wang, Maotang Liu, Ltd. Shandong Huate Magnet Technology Co., Fengliang Liu

    "Introduce and promote a latest technology and equipment for magnetite. It’s featured of purifying concentrate, lowering tailing grade, high concentrate recovery rate and stable operation. HUATE® New

    Jan 1, 2016

  • CIM
    Mineral Possibilities of Areas Adjacent to the Alaska Highway (ff91bb7d-99bb-4806-86e2-a2d9cfd3ea8e)

    By Thomas. L. O.

    Apart from a few sketches and incomplete maps, mainly topographical, and one or two detailed maps of placer-creeks, there is little information on the topography and geology of most of the country adj

    Jan 1, 1944

  • CIM
    Evaluation of spontaneous fire risk potential of underground coal mine panels

    By T. R. Roy

    "This paper presents an objective model for the estimation of fire risk potential of an underground coal mine panel by the bord-and-pillar method of mining where extraction is carried out by depillari

    Jan 1, 2003

  • CIM
    Ore Thawer at Pine Point

    By R. J. Johnston

    "INTRODUCTIONPoint Mines is located about 65 miles east of Hay River on the South Shore of the Great Slave Lake. It is connected to the Northern Alberta Railway System by the Great Slave Lake Division

    Jan 1, 1972

  • CIM
    Geological Setting of Volcanogenic Massive Sulphide Deposits and Active Hydrothermal Systems: Some Implications for Exploration

    By C. Jay Hodgson

    Hydrothermal systems form on land where and when an impermeable cap-rock unit ( either natural or self-sealed) , a permeable aquifer. and permeable discharge and recharge channels (cross-stratal perme

    Jan 1, 1977

  • CIM
    Stemming Zone Fragmentation Analysis of Optimized Blasting with Top-Column Air Decks

    By W. Banda

    "Trial application of air decks on a production shot improved fragmentation (32% reduction in x50). Empirical fragmentation models and digital image processing software were used to estimate fragment

    Jan 1, 2018

  • CIM
    Proactive Mineral Waste and Acid Rock Drainage Management at Rio Tinto

    By R. K. Borden

    Rio Tinto is committed to proactive mineral waste and acid rock drainage management. Corporate requirements are closely aligned with the GARD Guide principles of early geochemical characterization and

    Jan 1, 2011

  • CIM
    The Winning of Clays and Shales

    By J. F. McMahon

    Introduction The greater portion of the information presented in this paper was obtained in the course of an investigation on clay gathering and its cost in the provinces of Quebec and Ontario (1). F

    Jan 1, 1933

  • CIM
    Bumps in No. 2 Mine, Springhill, Nova Scotia (6b22a26e-d82e-4ce9-8c21-9da88f205566)

    By Walter Herd

    For the past eight years, No. 2 mine of the Cumberland Railway & Coal Co., Springhill-a subsidiary of the Dominion Coal Co., Ltd.-has had an unenviable reputation for bumps. As the workings extended i

    Jan 1, 1929

  • CIM
    Paragenesis of Fluorspar Deposits on the Southern Burin Peninsula, Newfoundland, Canada

    By B. A. Sparkes, J. H. Reeves

    "The St. Lawrence Granite hosts vein-type fluorite mineralization that was mined until 1977. Recent drilling identified a significant fluorite-bearing structure hosted in adjacent meta-sedimentary cou

    Jan 1, 2016

  • CIM
    Optimising the Management of CIP/CIL Circuits

    By K. Barbetti

    "The carbon-in-pulp (CIP) process has been the dominant gold recovery process since the early 1980s. CIP has proven to be very adaptable for a wide range of ores and circuit configurations. The key pe

    Jan 1, 2017

  • CIM
    Predicting cave initiation and propagation

    "The most widely used method for predicting the onset of continuous caving is Laubscher’s caving chart. A detailed examination of this method was undertaken which concluded that it had limitations whi

    Jan 1, 2003

  • CIM
    Modification of the Stillwater Base Metals Refinery Process

    By L. Newman, R. Wyrick, R. Berezowsky

    The Stillwater Mining Company operates an integrated mines, mill, smelter and base metals refinery complex in Montana, USA for the production of a high-grade platinum group metals (PGM) bearing concen

    Jan 1, 2004

  • CIM
    Process Integration and Optimisation of the Boddington Hpgr Circuit

    The current mining operations at Newmont Boddington Gold Mine (NBG) commenced in 2008, and commissioning of the processing plant started in the latter half of 2009. Metso Process Technology and Innova

    Jan 1, 2012

  • CIM
    Analyzing Energy Consumption and Gas Emissions of Loading Equipment in Underground Mining

    "In an environment of rising energy prices and mining at greater depths, cost-efficient loading and hauling equipment is essential. Conducted at an underground mining operation, this study analyzes th

    Jan 1, 2015

  • CIM
    Hangingwall sloughing mechanism in open stope mining

    By J. Ran

    "Hangingwall sloughing is the major cause of unplanned stope dilution in open stope mining. Understanding the hangingwall sloughing mechanism can guide the stope design in minimizing the unplanned dil

    Jan 1, 2002

  • CIM
    The Carbon Footprint of Grinding Media

    By Paul W. Shelley, Daniel J. Hodges

    The mining industry is undergoing a period of rapid transformative change.  This is the result of the social and financial accountabilities that the industry is faced with because of the world&rs

    May 4, 2025

  • CIM
    Measurements of deformation and stress variations in mine pillars

    By A. P. Bois, K. Saleh, A. Ghorbal, V. Hajiabdolmajid, G. Ballivy

    "The knowledge of the initial stress field is not always sufficient to ensure the stability of mining stopes due to the high-stress variations generated by mining. Monitoring of these openings is then

    Jan 1, 2003