Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Optimisation of Coke Breeze Addition in Iron Ore Pellets

    By G. Paquet, E. Godin

    "Since the mid fifty's, worlwide pellet production capacity has constantly risen (Fig. 1, Ref. 1 l. There was however at that time no real incentive to decrease production costs but only to produce as

    Jan 1, 1986

  • CIM
    In situ acid leaching of copper tailings deposits: A case history

    By C. D. Shackelford, J. F. Muñoz, M. Vauclin, P. Rengifo, A. Suazo

    The results of a field-scale study involving in situ leaching of copper ore tailings using sulphuric acid as the leaching agent, injection wells to introduce the leaching solution and extraction wells

    Jan 1, 2001

  • CIM
    Mass Balances in Mill Metallurgical Operations

    By R. Tipman, T. C. Burnett

    "A general computer program has been written to calculate material balances using multiple regression techniques. The program can handle metal assays or size distribution data obtained in multiple sur

    Jan 1, 1978

  • CIM
    The Pechiney reduction cell family: 25 years of development in design and process control

    By C. Vanvoren

    "Since 1975, the Aluminium Pechiney Research Centre at Saint-Jean-de-Maurienne (LRF) has been concentrating its efforts on designing, testing and perfecting the Aluminium Pechiney point-fed prebaked r

    Jan 1, 2002

  • CIM
    Treatment of Non-Magnetics at Falconbridge

    By C. H. Dionne, J. A. Holmes, B. J. Huls

    "Falconbridge Limited is presently developing flowsheet alternatives for implementation at the Strathcona Mill. The main thrust for change arises from the need to reject more pyrrhotite from the conce

    Jan 1, 1991

  • CIM
    Optimisation des systèmes pelles–camions en utilisant la théorie des files d’attente

    By D. Komljenovic, J. Paraszczak

    "This paper presents the use of queuing theory in truck fleet sizing in open pit mining operations. In the first part, a methodology is developed by which an optimal ratio between the size of shovels

    Jan 1, 2004

  • CIM
    Optimization of shovel-truck systems using the queuing theory - Optimisation des systèmes pelles?camions en utilisant la théorie des files d?attente

    By D. Komljenovic

    This paper presents the use of queuing theory in truck fleet sizing in open pit mining operations. In the first part, a methodology is developed by which an optimal ratio between the size of shovels a

    Sep 1, 2004

  • CIM
    Markets for Western Coal

    By H. Stutchbury

    Alberta is labouring, and has laboured, under serious difficulties in the marketing of ?her coals, due to a number of conditions which now obtain, but all of which appear capable of solution, and the

    Jan 1, 1925

  • CIM
    Indicator mineral and till geochemical methods for kimberlite exploration in glaciated terrain (526cabe2-e08e-448c-950e-0f39e1fcecab)

    By M. B. McClenaghan

    "This paper summarizes diamond exploration techniques used in glaciated terrain, focussing on indicator mineral and geochemical methods applied to glacial sediments. Understanding the ice flow history

    Jan 1, 2002

  • CIM
    Predicting the penetration rate of percussive blasthole drills using coarseness index and median particle size

    By S. Kahraman, K. Develi, E. Yasar

    Four hydraulic top hammers, one pneumatic top hammer, and three down-the-hole drills were observed in several rock types at quarries and highway construction sites to measure the performance data. At

    Jan 1, 2004

  • CIM
    Enhanced Oxygen Transfer in Gold Cyanidation

    By Ralph Harris, Xia Qi, Frank Komsic

    "Gold cyanidation kinetics which are often limited in commercial operations by the rate of oxygen dissolution from gas bubbles into the slurry, are discussed. Emerging technologies for improving the r

    Jan 1, 1996

  • CIM
    Large Flotation Machine Development and Operation

    By M. Churchill, V. R. Degner

    "Over the past two decades, declining ore body grades, increased operating costs and increased construction costs have provided an incentive for the development of progressively larger flotation machi

    Jan 1, 1982

  • CIM
    Rehabilitation of Tailings Areas of Uranium Mines

    By A. J. Vivyurka

    "This is a talk about the experiences that Rio Algom Mines Ltd. has had in the Elliot Lake uranium area trying to make the tailings more compatible with the surrounding environment. To get a better id

    Jan 1, 1975

  • CIM
    Developments in the Hydrometallurgical Processing of Nickel Laterites

    By F. McCarthy, W. Zhang, R. McDonald

    "The processing of nickel laterites has been a topic of major interest at CSIRO for almost twenty years. During this period CSIRO has collaborated with other researchers and industry in developing a b

    Jan 1, 2017

  • CIM
    Large-scale panel destress blast at Brunswick mine

    By B. P. Simser, R. K. Brummer, A. Mortazavi, P. P. Andrieux

    "A large-scale panel destress blast was fired at Brunswick mine in the fall of 1999 in order to reduce the ground stresses in a critically important neighbouring mining region. This work, sponsored by

    Jan 1, 2003

  • CIM
    International mineral resource and mineral reserve classification and reporting systems

    By S. Felderhof, W. S. Vaughan

    "Over the years, it has been increasingly difficult for the minerals industry to raise the necessary capital for its activities. To alleviate this phenomenon, complete transparency and capital market

    Jan 1, 2005

  • CIM
    The Wabush Mines Concentrator

    By Timothy R. Eby

    "The Wabush Mines project was formed in 1956 to develop a large iron ore property in Western Labrador. The town of Wabush along with the mining and concentrating facilities are located 640 air miles f

    Jan 1, 1978

  • CIM
    Slag loss control with Bessemer mattes

    By P. Toscano

    The objective of this investigation was to determine how the losses of nickel, copper and cobalt in fayalite slags could be controlled for nickel mattes with iron contents below 5 wt%. Laboratory-conv

    Jan 1, 2004

  • CIM
    Slag loss control with Bessemer mattes (7a7d6df1-1191-4a91-90b7-94a6293af197)

    By P. Toscano, T. A. Utigard

    "The objective of this investigation was to determine how the losses of nickel, copper and cobalt in fayalite slags could be controlled for nickel mattes with iron contents below 5 wt%. Laboratory-con

    Jan 1, 2004

  • CIM
    Process Improvements at Bell Creek Mill

    By F. Flynn, P. Downey, G. Ritson

    "Bell Creek Mill which has been in continuous operation since 1987 has undergone numerous operational changes in the past three years. The addition of over 2. 5 million tons of resource at over 13 git

    Jan 1, 1997