Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Rogers Pass Tunnel - Bore and Blast

    By Hansmire WH

    The 14.7 km Mt. MacDonald Tunnel beneath Rogers Pass in Canada used both drill-and-blast and machine boring methods. A unique ventilation system provides for diesel operations. The design featured

    Jan 1, 1987

  • AUSIMM
    Measurement? Assessment? The Real Challenge is Communication

    One of the earliest and continuing challenges in driving sustainable development in large scale resource industry projects is around the issue of assessment û how do you measure the sustainability of

    Jan 1, 2009

  • AUSIMM
    The Application of Geographic Information Systems to the Analysis and Mapping of Heavy Metal Contamination Around Lavrio Mine Workings, Greece

    By Durucan S

    The southern Attiki peninsula is a very interesting area from an environmental point of view. The port and the city of Lavrio is situated at the east coast of the peninsula with about 10 000 inhabit

    Jan 1, 1995

  • AUSIMM
    Will Your Mine Require Cooling?

    By A S. Derrington

    In some parts of Australia, mine air cooling may not be needed until a depth of 1300 m below surface is reached. In other locations, it may be essential at a depth of only 300 m below surface. The rea

    Mar 24, 2014

  • AUSIMM
    Optimum Blasting? Is it Minimum Cost Per Broken Rock or Maximum Value Per Broken Rock?

    In most mining operations the ore undergoes several processes such as drilling, blasting, loading, hauling, crushing, grinding and liberation to become the final salable product. Drilling and blasting

    Jan 1, 2001

  • AUSIMM
    Sustainable Water Use in Minerals and Metal Production

    By R R. Lovel

    In this paper, life cycle assessment methodology has been used to assess the variations in water use associated with different metal production and processing routes and provide insights into the valu

    Jan 1, 2006

  • AUSIMM
    Data Acquisition and Management at Olympic Dam Mine Operations

    The Olympic Dam Mining Operation involves the supply of some 2.2 million tonnes per annum of ore feed for the metallurgical plant. To achieve this approximately 9 km of tunnels are developed per year

    Jan 1, 1992

  • AUSIMM
    Ore Reserves at Woodlawn Mine, NSW

    By Singer RP

    The Latrobe Valley brown coal deposits are one of Australia's major energy resources with measured and indicated reserves amounting to some 162 billion tonnes. Economically recoverable reserve

    Jan 1, 1990

  • AUSIMM
    Installation of an Automatic Truck Despatch System at Bougainville Copper Limited

    In early 1985, Bougainville Copper Limited commissioned an automatic truck despatch system to control its fleet of 44 trucks and 9 shovels. Productivity gains in the past have been the result of i

    Jan 1, 1986

  • AUSIMM
    The Use of AuRIX<sup>«</sup>100 Resin for the Selective Recovery of Gold and Silver From Copper, Gold and Silver Solutions

    By J Abols, T Hughes

    The selective recovery of gold and silver from solutions containing other metals, such as copper, is possible using AuRIX«100 resin in conjunction with the Gekko Resin Column. Selectivity is driven by

    Jan 1, 2005

  • AUSIMM
    The Batch Phase Disengagement Test

    By Pollard D. M

    In the batch phase disengagement test, an organic and an aqueous phase are mixed together for a known period to produce a dispersion which may be either organic continuous (aqueous phase droplets)

    Jan 1, 1987

  • AUSIMM
    "The Biogeometallurgical Approach – the Information We Need to Increase the Sustainability of Mining"

    By B Dold

    "Mining has still today high potential for improvement in the exploitation efficiency. Especially low-grade ores have very low recoveries. In Cu bioleaching operations from porphyry copper deposits ex

    Jun 15, 2016

  • AUSIMM
    Interfacial Chemistry in Flotation of Diasporic Bauxite

    China has abundant bauxite resources, but these resources are mostly of a diaspore, which has a feature of low Al2O3 to SiO2 mass ratio, typically ranging from four to six. Compared to other materials

    Sep 13, 2010

  • AUSIMM
    A comparative study of two laboratory crushing techniques for a South African banded iron formation (BIF)

    By N Maistry, A Singh

    It is estimated that in less than a decade, high-grade iron ore reserves in South Africa will be depleted, leaving only low-grade ores with a dominant lithology of banded iron formation (BIF) hematite

    Sep 18, 2023

  • AUSIMM
    Recovery of Berryllia from Beryl

    By Lawrie DC

    Finely ground beryl was decomposed by mixing with ground limestone and soda ash andheating at 900¦C for,4-6, hours.The sintered material was then crushed and leached by boiling under reflux with 5N su

    Jan 1, 1963

  • AUSIMM
    Paper No. 123. Some Modern Methods in Ore Treatment by Cyanidation.

    Before proceeding I wish to say that the excellent diagrams by which my paper is illustrated are the work of Mr. C. H. Barnes, Constructing Engineer of the Kalgurli Gold Mines Limited, and I am also m

    Jan 1, 1903

  • AUSIMM
    Cadia East Open Pit Project Mining Study

    The Cadia Valley Operations currently hosts a large operational open pit, a large operational sublevel caving underground mine and two other underground projects at the study stage. This scenario crea

    Jan 1, 2007

  • AUSIMM
    Use of Granular Flow Modelling to Investigate Possible Bias of Sample Cutters

    By G K. Robinson, M D. Sinnott

    Three-dimensional granular flow models have been run to simulate three types of sample cutters: a cross-stream cutter, a vezin, and a cross-belt cutter. This type of modelling involves solving the equ

    Jan 1, 2005

  • AUSIMM
    Trucking into the Next Millennium

    For the past 40 years, underground trucking using diesel powered or electric wheel driven vehicles, either conversions of surface trucks, or purpose built, has been the preferred means of ore and wast

    Jan 1, 1998

  • AUSIMM
    Fuel Conversion at Toyo Smelter

    By Nagai K, Moriyama K

    Toyo smelter has been making s veral efforts to reduce and diversify energy for dealing successfully with such :n:;rgy problems as the first and second oil crises. ::,specially it is one of th:; m

    Jan 1, 1987