Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Development and implementation of a digital sleep and circadian management tool for optimising sleep, health and safety in shift workers

    By S M. W Rajaratnam, P Varma, T L. Sletten

    Mining employees undertaking shift work are at considerable risk of experiencing sleep disturbances and circadian rhythm disruptions. In the complex, high-risk environment of mining, these sleep and c

    Apr 16, 2024

  • AUSIMM
    Assessment of Leachate From Blended Waste Rock Material at the Pasminco Century Mine ù Initial Results From a Two-Year Study

    By M Ridd

    The Pasminco Century Mine (PCML) is located 250 kilometres north-north-west of Mt Isa in Queensland. As one of the worldÆs largest zinc mines, PCML comprises mining and milling operations at Lawn Hill

    Jan 1, 2004

  • AUSIMM
    A Multiple Blasthole Fragmentation Model – Its Concept, Formulation, Capability and Field Comparison Examples

    By R Yang

    This paper presents a fragmentation model for large production blasts in an open pit or underground environment. The paper shows that the particle velocity is directly related to pressure, strain, and

    Aug 24, 2015

  • AUSIMM
    Control and Monitoring of International Organization for Standardization Compliance for Industrial Sampling Systems

    By R Shaw, T T. Neidel, C Adams

    Sampling equipment manufacturers endeavour to ensure that the mechanical equipment installed in sampling systems are designed and manufactured to adhere to the requirements of the International Organi

    Jul 29, 2014

  • AUSIMM
    Planning revegetation for relinquishment

    By S D. Fox, P B. Swart

    Statistics showing that mine rehabilitation is falling behind rates of disturbance continue to be reported in the media. Unfortunately, most reported statistics do not account for the large growth-cyc

    Jul 25, 2018

  • AUSIMM
    A Theoretical Model for Determining the Compressive Strength Across the Width of a Long Pillar

    By Bhattacharyya A. K

    The current methods for predicting pillar strengths are reviewed. A two-dimensional model, based on the Mohr-Coulomb failure criterion, is proposed for determining the compressive strength across th

    Jan 1, 1995

  • AUSIMM
    Mine Closure Guidelines for Western Australia and Consultation Process

    By X T. Nguyen

    Western AustraliaÆs Mining Act 1978 was amended in 2010 to provide for the requirement of a mine closure plan to be submitted to the Department of Mines and Petroleum (DMP) for approval, as part of a

    Jul 10, 2012

  • AUSIMM
    Cost Management Optimisation

    By B King

    Processing expansion options and mining fleet purchases are major cost items that receive due focus in most cost management analyses. If these items are not needed, they can significantly reduce a pro

    Nov 24, 2014

  • AUSIMM
    A Sustainable Mine Water Treatment Initiative to Provide Potable Water for a South African City ù A Public-Private Partnership

    By A M. van Niekerk, W Mey

    Coal mining has an impact on the water management of the water scarce Upper Olifants River Catchment. A prefeasibility study was carried out by Anglo Coal and Ingwe Collieries Limited to establish the

    Jan 1, 2006

  • AUSIMM
    The Critical Role of Representative Sampling

    By K H. Esbensen

    The critical role of representative sampling is featured and illustrated by selected examples from the geosciences and beyond. As there already are many demonstrations of the potential (and potentiall

    Aug 21, 2012

  • AUSIMM
    Leading safely doesn’t only mean leading safety

    By A G. Guinea

    Every person in an organisation has what could be called ‘a different take’ on what it means to be a safety leader. The directors will tell you they are ultimately responsible for everyone’s safety an

    May 5, 2022

  • AUSIMM
    Practical Ventilation Planning for Mine Management Using a Digital Computer

    By Hempenstall J, English W

    Mine management has a responsibility under the various acts of state parliaments for the adequate ventilation of existing workings. It also has a need to plan adequately for the ventilation of pro

    Jan 1, 1983

  • AUSIMM
    Integration of Geological and Geotechnical Data for Three-dimensional Modelling

    By K Zunica, A R. Penney

    The principles of three-dimensional geological modelling are well understood and routinely used. Sample data is collated and geostatistical tools used to ensure that sample data is suitable for its en

    Aug 18, 2014

  • AUSIMM
    Structural analysis and modelling in an evolving mineral resources operation

    By N Arrys, A Jani, S Shahin

    Optimising pit slope stability and reducing strip ratio of a mining operation are two key tasks in geotechnical engineering. With a growing demand for minerals and an increasing cost associated with e

    Sep 1, 2024

  • AUSIMM
    MMG’s Australian Operating Model – the Implementation, Successes and Learning

    By R M. S Watsford, M Davis

    In 2015, MMG Limited commenced further action to improve operating margins and establish a blueprint for future growth in the Australian environment. This action was taken in the context of weakening

    Jun 22, 2016

  • AUSIMM
    Power Supply for Resource Projects (8ecc30a6-60bd-418c-872d-5915924f6785)

    The provision of electrical power is an important consideration in project development. The first step to be taken in this area is to assess the power requirements of the project. The alternatives of

    Jan 1, 1990

  • AUSIMM
    Assessment of ground support requirements in coal burst-prone mines

    By J Watson, C Zhang, I Canbulat, C Wei

    Coal burst is defined as a dynamic release of energy within the rock or coal mass in underground coalmines that causes violent rock or coal ejection in the vicinity of mine excavations. It poses one o

    Nov 29, 2022

  • AUSIMM
    Seismic Monitoring at the Fimiston Open Pit Kalgoorlie Consolidated Gold Mines (KCGM)

    By J J. Jiang, M Reimnitz

    The Kalgoorlie Consolidated Gold Mines (KCGM) Fimiston Open Pit is mining through a dense network of disused level workings and open stopes of greatly varying sizes. The condition of the stope crowns

    Jan 1, 2003

  • AUSIMM
    Examples of Groundwater Sustainability Issues in Mining

    For Australian mining projects, sustainable groundwater use is typically defined as a groundwater extraction regime, measured over a specified planning time frame, which allows acceptable levels of st

    Jan 1, 2006

  • AUSIMM
    The QSL Lead Process

    The QSL continuous lead smelting process incorporates two basically different pyro- metallurgical operations: roast-reaction, smelting of galena concentrate, followed by carbothermic reduction of s

    Jan 1, 1984