Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A Gauge for the Discrimination of Overburden and Sediments from Low Ash Coal

    By Brockway DJ, Holmes RJ

    A natural gamma-ray gauge has been devel- oped for discriminating overburden and inter- seam sediment from low ash coal located on a moving conveyor belt. It is based on the difference in natural ra

    Jan 1, 1987

  • AUSIMM
    Optimum Priming Systems for Ammonium Nitrate/Fuel Oil-Type Explosives

    Conflicting claims and views on the priming of ammonium nitrate/fuel oil (ANFO) are reviewed; certain fallacies and misconceptions are rectified. Optimum priming systems for a range of blasthole co

    Jan 1, 1974

  • AUSIMM
    ENVIB-Blast Vibration Analysis System

    By Richards AB

    This paper describes the ENVIB software system, which has been developed in a menu-driven form to aid in the monitoring and assess- ment of vibration caused by routine blasting operations and for res

    Jan 1, 1988

  • AUSIMM
    Discrete vein modelling – implications of a novel geology driven resource estimation methodology for vein hosted mineral deposits

    By J P. van Dijk, M Munro

    Discrete vein modelling presents an innovative geology driven 3D modelling method for quantification of vein hosted mineral deposits, with far reaching potential for critical mineral supply and low im

    Sep 1, 2024

  • AUSIMM
    Lateritic Weathering of Serpentinite at Rockhampton, Queensland

    By Hewitt D

    A study of two laterite profiles developed on a serpentinite near Rockhampton, shows that loss of Si02 and MgO results in the relative concentration of Fe203, A1203 and a number of minor elements.

    Jan 1, 1974

  • AUSIMM
    Trials, Tribulations and Triumphs of Unmanned Aerial Vehicle Surveying at St Ives Gold Mine

    By R Steven

    "Surveying, and as a result, surveyors, have been around since the start of time, and it has been said that so has their methodology!The theodolite and tape have been the backbone of a time-tested pra

    Nov 15, 2016

  • AUSIMM
    The Impact of Flocculant Addition on a Tailings Storage Facility

    Water retention, water loss and delay in tailings storage rehabilitation are major challenges for many Coal Mines. Work by Stewart, Backer and Busch in the early 1980s suggested that there were improv

    Jan 1, 2008

  • AUSIMM
    Selection of Ore from Multiple Pits

    By J E. Everett

    When ore is being selected from a regularised block model, a common procedure is to accept as ore any block whose iron content exceeds a cut-off value, and whose content in each contaminant analyte is

    Aug 12, 2013

  • AUSIMM
    A Collaborative Model for Developing Future Continuing Education and Training in Mining

    By S W. Houlding

    The Certificate in Mining Studies program at the University of British Columbia, Vancouver, Canada is a collaborative initiative between mining schools and industry to provide accessible, cost-effecti

    Nov 22, 2011

  • AUSIMM
    Analysis of Stability and Design of Face Support for Cross Passages – Waterview Connection Tunnels, Auckland, New?Zealand

    By M G. Wansbone, R Bhargava

    The inferred ground conditions for the proposed mined cross passages at the northern end of the Waterview Connection tunnels consist of an overburden of alluvial and residual soils, with mixed face ge

    Sep 17, 2014

  • AUSIMM
    Process Information Management System at Mount Isa

    The implementation of a process information management system (PIMS) is to provide a single online, real-time information system. This system provides a unique and completely open view for everyone, b

    Jan 1, 2005

  • AUSIMM
    From Blasthole to Reverse Circulation Sampling – Changing Grade Control Methods at Black Star Open Cut Zinc-Lead Mine, Mount Isa, Queensland

    By B Young

    Variable bench heights, interaction with underground workings and a steeply dipping orebody are challenges faced daily by geologists at Xstrata Zinc’s Black Star Open Cut (BSOC) Zinc/Lead/Silver mine

    Aug 22, 2011

  • AUSIMM
    The risk management and cost benefits of using a total monitoring approach to managing slope instability hazards in open pit mines

    By C Jacobsen, N Harries

    Assessing and managing instability hazards is an essential activity when working with unstable natural slopes and excavated open pit mining slopes. Slope monitoring has become the standard technique f

    Nov 29, 2022

  • AUSIMM
    Structure and Iron Mineralisation of the Carajßs Province

    By L M. Lobato, J C. S Seoane, F J. Baars

    The Carajßs Province presents several volcano-sedimentary sequences that comprise the Itacai·nas Supergroup. The rocks represent bimodal volcanism, and clastic and chemical sedimentation in relatively

    Jan 1, 2005

  • AUSIMM
    Geological Controls on Drilling and Blasting Operations

    By T N. Little

    This review paper presents an integrated and practical insight to blasting geology and its importance. This approach involves developing blasting objective up front and implementing geology specific b

    Nov 8, 2011

  • AUSIMM
    Is Every Mine a Pilot?

    By G I. Lumley

    ‘Every mine is a pilot’ is an attitude which encourages the mining paradox of optimistic mine plans and equipment under performance; propped up by an environment lacking accountability. The premise th

    Jun 22, 2016

  • AUSIMM
    Fragmentation Monitoring of Production Blasts at MRICA

    By Abrahamsson S, Niklasson B

    In a follow-up of 12 production blasts in a quarry at the Mrica project on Java, tightly spaced porous bands were found to govern fragmentation to the extent that the average fragment size k5o was n

    Jan 1, 1990

  • AUSIMM
    Impacts of thrust faulting at Goonyella Riverside Mine

    By H S. Pescini

    A material aim when feeding ore blends into a processing facility is to reduce the variability of the properties of the feed material and to maximise the output, or throughput. At the Mining Geology c

    Mar 22, 2022

  • AUSIMM
    Predicting the Performance of Continuous Leaching of Gold Bearing Ores

    By Corrans I. J, Yan D. S

    The CIP process for gold recovery has enjoyed widespread application in most gold-producing countries. The development of a mathematical model of the CIP process has value for use in process design,

    Jan 1, 1991

  • AUSIMM
    Management of riverine disposal of tailings and waste rock for AMD control at the Ok Tedi copper-gold mine

    By S Davidge, J Pile, R Schumann, E Kepe, W Stewart, M Ridd, B Rathi

    Geographical constraints, including steep terrain and high rainfall, at the Ok Tedi copper-gold mine in PNG’s Western Province present Ok Tedi Mining Limited (OTML) with significant challenges in mine

    Aug 2, 2023