Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Problem roadways in an underground decline solved through the application of Roller Compacted Concrete (RCC)By D Bruce, D Cox
The main access decline at Carrapateena mine was excavated through two different underground aquifers. In these areas of decline, pressurised water finds the path of least resistance through the rock
Mar 15, 2021
-
Dilution Control in Southern African MinesThe economic viability of many Southern African massive mining operations is threatened by excessive dilution. In many operations currently in progress, some stopes are experiencing as much as 115 per
Jan 1, 2000
-
Universal Reconciliation – A Multidisciplinary Approach across the Entire Mining Value Chain to Identify Loss of Value and Maximise Operational PerformanceBy R Hargreaves, C Morley
The authors often see problems on mine sites that are due to insufficient feedback between technical discipline silos as the realities on the ground fail to inform the models and plans used to drive r
Aug 18, 2014
-
US Bureau of Mines Coal Mining Automation ResearchBy Bevan JE
The US Bureau of Mines is conducting research to improve the health and safety for underground coal miners, and the efficiency of the mining systems that are used. In 1986, the Bureau began a major re
Jan 1, 1991
-
Pit Slope Management ù Planning for Your Next Failure in Open Cut MiningIt is often assumed that geotechnical investigations or studies for open pit mines are confined to providing a slope design. However in an operating mine, the design is only one component of a mine ge
Jan 1, 2003
-
The Development and Implementation of a Fully Remote Stoping Method at Beaconsfield Gold Mine, TasmaniaBy S Arthur, J Mills, A R. Penney
A key aspect of seismic management for narrow vein stoping of the west zone at the Beaconsfield Gold Mine has been the development of a fully remote extraction method that does not require personnel a
Jan 1, 2008
-
Automated omission-free geotechnical deformation monitoring – a new method deployable by non-specialistsBy J Franke, C Gonzalez
One of the regular tasks of geotechnical and mining engineers is the measurement and management of deformation in underground excavations. Although several methods are used to do so, the incumbent met
Nov 29, 2022
-
Research on the Shape and Particle Size Distribution of Caved Ore Mass in Sublevel CavingBy G J. Zhang
The shape and particle size distribution of caved ore mass in sublevel caving were investigated in this study. The paper first reviews the main factors affecting the shape and characteristic of caved
Jul 11, 2011
-
Mine Road Design and Management in Autonomous Hauling Operations – A Research RoadmapBy R J. Thompson
In truck-based hauling systems, the mine haul road network is a critical and vital component of the production process. As such, underperformance of a haul road will impact immediately on mine product
Nov 22, 2011
-
Incorporation of a Full Process Plant Model as an Active Constraint for Mine Planning and Production SchedulingBy P Cesare, S Munro, D Wandel, R A. Bearman
Consideration of the processing plant operational envelope is a key factor in production scheduling,and therefore mine planning, for any mining operation. In many cases hard-wired or regressionbased t
Nov 24, 2014
-
Strategic thinking about long-term ‘above ground’ orebody complexity using scenariosBy T Craske, J Sykes, T C. McCuaig, M Jessell, A Trench
The prevalent strategic approach in the mining industry is one of planning. However, it is widely recognised that planning does not work in complex and uncertain situations (Mintzberg, 1994), such as
Nov 21, 2018
-
Overall Concepts in Drilling for Roof BoltingBy Tonegato S, Wood M
The lack of objective data on roof bolting machines, bits, rods and overall system has created the need for an objective assessment of roof bolting. This work outlines a test rig for such objectiv
Jan 1, 1986
-
Driving Mine Performance through CommunicationBy S Jeffrey, S Mundell, F Arboleda
In the current cycle of low commodity prices and rising costs, mine managers continue to focus on optimising mine performance and productivity. A critical component of strengthening performance and pr
Jun 22, 2016
-
Mine closure bonds (financial assurances) – the ‘how much?’ conundrumBy G Byrne, A Bowden
There is often a difference in opinion about the allocation of risk in the establishment of mine closure bonds or financial assurances. From the State’s perspective, protection is needed to ensure tha
Jul 25, 2018
-
Anglo Coal Australia ù Graduates and the FutureAnglo Coal Australia (ACA) takes a proactive position with regards to attracting and retaining employees at a graduate level. Currently, ACA has graduates in its program across all disciplines: Mining
Jan 1, 2005
-
Now to the Future – A Path Toward the Future MineBy I Gipps
Each of us has a vision of what the future mine will be and, generally, these visions have many similarities and some differences. One of the major discrepancies in visions of the future mine is not t
Nov 22, 2011
-
Protection of ?Tunnels in their Future EnvironmentBy A L. Bennett
It is well understood that designers and constructors must protect the existing surroundings of tunnel construction, particularly in the selection of excavation methods, ground support and waterproofi
Sep 17, 2014
-
Automated joint mapping using the concentric shells algorithmBy P Valenzuela
Joint mapping is a fundamental input for rock mass characterisation and slope stability analysis. The usual way to do it is using a compass in the field or digitising structures on a screen, with a so
Sep 20, 2017
-
The Myth of Mine ReconciliationMine reconciliation is the practice of comparing the tonnage and grade of material processed by the mill with the tonnage and grade of ore in the reserve model of a deposit, and with the tonnage and
Jan 1, 1998
-
Integrated drawbell and undercut scheduling using a computational tool at the Grasberg block cave mineBy C A. Brannon, C A. Dipas, H A. Vega, D Villa
The development and construction of the Grasberg block cave mine (GBC) is in progress, currently targeting initiation of caving in late 2018. Current production planning anticipates ramping up to full
Oct 16, 2017