Search Documents

Sort by

  • SME
    Rinsing of Spent Precious Metal Ores For Heap Leach Decommissioning

    By S. L. McGill, P. B. Comba

    Many gold producing states are requiring rinsing of spent heaps to render the leached ore compatible with the environment and are placing reatrictiona on effluent pH, cyanide, and metals concentration

    Jan 1, 1991

  • TMS
    Lead Sinter Quality Characterization by Reflected Light Microscopy and Electron Microprobe Analysis

    By John M. Gaines

    Lead concentrates from the Viburnum Trend in the Southeast Missouri Lead district are sintered prior to smelting to bind the particles together homogenize the feed, and reduce the sulfur content. Good

    Jan 1, 1991

  • SME
    Variable Speed Drive Sag Milling At The Colosseum Mine

    By H. L. Holden

    The single line grinding circuit at Bond Gold's Colosseum mine consists of variable speed drive semi-autogenous (SAG) milling and secondary grinding with a fixed speed ball mill. There are seve

    Jan 1, 1991

  • SME
    Geology of the Brewer Gold Mine in South Carolina

    By W. Scheetz

    The Brewer Gold Mine is an open-pit, heap leach operation that processes about 122 kt/m (135,000 stpm). The mine is operated by Brewer Gold Inc., a subsidiary of Westmont Mining Inc., and is located n

    Jan 1, 1991

  • TMS
    Advantages of Ion Exchange for Gold and Silver Recovery

    By Melvin A. Jennings

    Ion-exchange technology for precious metals recovery is at a turning point. Some very exciting technology has been developed in the past five years which should lead to commercialization of the proces

    Jan 1, 1991

  • SME
    An Evaluation of Acid Mine Drainage Treatment Systems and Costs

    Acid mine drainage is still a common problem in the northern Appalachian high sulfur coal region despite mining and reclamation practices applied to control it. Mining companies must treat water with

    Jan 1, 1991

  • AUSIMM
    Reliability of Subsidence Prediction Methods for Use in Mining Decisions in New South Wales

    Subsidence prediction methods can be divided into two basic types: empirical and analytical. Empirical methods are based largely on a combination of experience, intuition and observations from a large

    Jan 1, 1991

  • SME
    An Expert System Of Selecting Mine Ventilation Systems

    By Wang Yingmin, Xu Zhuyun

    There are 3 steps in the process of forming a mine ventilation system, (1) selecting a reasonable ventilation pattern (included pit shaft arrangement); (2) optimizing of the ventilation network and (3

    Jan 1, 1991

  • CIM
    Compilation of gold occurrences in the southern Abitibi Belt, Quebec

    By Pierre O'Dowd

    "The southern Abitibi Belt is the major source of gold in Quebec. Although the northern part of the belt is quickly being developed, the area under study will not be downgraded in the near future beca

    Jan 1, 1991

  • SME
    Application Of "SES" And "MFIRE" Computer Simulation Programs For Tunnel Fire Modeling - A Comparative Study

    By Paul C. Miclea

    In case of a major fire in a tunnel between stations or ventilation shafts, if the buoyancy effect of the hot gasses is stronger than the airflow induced by the fans, the risk of backlayering could re

    Jan 1, 1991

  • TMS
    Potential for Genetic Enhancement of Bacterial Detoxification of Mercury Waste

    By O. A. Ogunseitan

    The contamination of aquatic ecosystems by mercury wastes is one of the most serious forms of environmental pollution associated with the metal mining and electrochemical industries. The transformatio

    Jan 1, 1991

  • SAIMM
    Corigendum

    Messrs B. R. Braekman and D. W. Penman have notified some errors in the Addendum that was attached to their paper, 'The Prieska experience: Flotation developments in copper-zinc separation',

    Jan 1, 1991

  • SME
    Evaluation Of A Two-Phase Flow System For Dust Control In A Model-Mine

    By Robert A. Jankowski, Natesa I. Jayaraman, Jay F. Colinet

    The U.S. Bureau of Mines evaluated the dust control effectiveness of two-phase flow systems in a full-scale model mine using a mockup of a Joy 14CM continuous mining machine. In a two-phase flow syste

    Jan 1, 1991

  • AUSIMM
    Multiskilling at the Hellyer Concentrator

    By Campbell J

    After eighteen months of discussions with employees and their trade unions, multiskilling was introduced at the Hellyer concentrator in early 1989, coinciding with the plant commissioning. Multiskil

    Jan 1, 1991

  • SME
    Experimental Designs for Decision Making

    By Edgardo I. Cifuentes, Andrew L. Mular, Andrew Burkert

    Experimental designs are data acquisition plans which, if followed exactly, will quickly provide process engineers with information to assess statistically the individual and joint influence of factor

    Jan 1, 1991

  • SME
    44. Review of the Exploration and Development of the Mount Pleasant Mines, New Brunswick, Canada ? Introduction

    By Harold Bloom

    The Mount Pleasant Mines, or Mount Pleasant Joint Venture as it is presently known, is located approximately 59.5 km (37 miles) south of Fredericton, NB, Canada. Earliest indications of mineralization

    Jan 1, 1991

  • SME
    Tunnels And Shafts - Des Plaines System

    By Thomas F. Martin, Daniel J. Sieve

    In April 1988, the joint venture of Morrison-Knudsen and Paschen Contractors (M-K/P) was the successful low bidder for the Metropolitan Water Reclamation District of Greater Chicago's (MWRD) Cont

    Jan 1, 1991

  • AUSIMM
    Optimising Mining Selectivity with Particular Emphasis on Bench Height : A Case Study at the Telfer Gold Mine, Western Australia

    By Whitham M

    Prior to exploitation, the feasibility of mining and recovering ore can usually be determined to a satisfactory level of uncertainty by the consideration of conceptual scenarios, using a range of r

    Jan 1, 1991

  • AUSIMM
    The Golden Cross Mine Underground Development Experience and Practice

    The Golden Cross Mine will be the first underground gold mine in New Zealand to operate since 1952. The development plans, along with the conditions and circumstances presently found in the now ongoin

    Jan 1, 1991

  • SME
    Chemical/Physical Properties and Marketing

    By James C. Hower, B. K. Parekh

    Introduction The purpose of coal preparation is to improve the quality of coal to make it suitable for a specific purpose by (1) cleaning to remove inorganic impurities; (2) sizing-crushing or scree

    Jan 1, 1991