Search Documents

Sort by

  • SME
    Design And Implementation Of An Environmental Audit Program

    By Jerry W. Danni, John E. Hardaway

    Corporations today must comply with an ever growing number of complex and increasingly stringent environmental laws and regulations. An environmental audit program is an effective means in which to un

    Jan 1, 1992

  • CIM
    Base-Metal Deposits of the Bathurst-Newcastle District: Characteristics and Depositional Models (e2fcbc36-94fa-4bf9-92bb-6227c20c24f4)

    By Steven R. McCutcheon

    "The Bathurst-Newcastle district, a subcircular area approximately 50 km in diameter, contains 37 massive-sulfide Zn-Pb-Cu deposits that have defined tonnages, and has 58 additional significant occurr

    Jan 1, 1992

  • SME
    Integrating Reclamation Into Mine Planning At The Chimney Creek Mine

    By William A. Faust

    At Gold Fields' Chimney Creek Mine, major reviews of the reclamation and closure plans are done concurrently with the annual mine planning required for budget preparation. This review includes id

    Jan 1, 1992

  • AUSIMM
    Optimising Grade Control Procedures in Large and Small Open Pit Mines

    By Khosrowshahi

    A scientific approach to analysing grade control has been applied at a number of mining operations. By dividing the grade control process into the various stages of data collection and interpretation,

    Jan 1, 1992

  • AUSIMM
    A Relational Data Base and Data Management System for the Onshore Gippsland Basin

    By Gaulton R

    The Commission maintains a data base first computerised in 1957 and containing information from over 18 000 boreholes located mainly in the Latrobe Valley area. Some of the borehole derived informat

    Jan 1, 1992

  • AUSIMM
    Large Column Leaching at Telfer Gold Mine

    By Dunne R, Defilippi J

    Dump leaching began at Teller in late-1988 at a rate of 4 MTPA and has been progressively expanded to the present rate of 10 MTPA. Teller's on-going commitment to dump leaching is driven by the a

    Jan 1, 1992

  • SME
    Solution Chemistry Of Flotation Of Sparingly Soluble Minerals

    By L. Xiao, P. Somasundaran

    Three major types of solution chemical equilibria-involving minerals, solution, and flotation reagents such as collectors, frothers and modifiers-play a crucial role in determining the behavior of com

    Jan 1, 1992

  • AUSIMM
    Ground Control Techniques Utilizing Polymer Grid Structures

    Lightweight polymer grids have recently been introduced to the mining industry. They are currently being used for roof and rib control, longwall shield recovery, safety guarding or barricade, high

    Jan 1, 1992

  • DFI
    Execution And Evaluation Of High Capacity Caisson Load Tests In Glacial Deposits

    By Franklin M. Grynkewicz

    As part of the Boston Harbor clean up project, the new 1,000 mgd Deer Island Sewerage treatment plant includes ten 240 feet high egg-shaped "residuals" tanks. Contract documents called for these struc

    Jan 1, 1992

  • SME
    Problems And Solutions In Surface Subsidence Monitoring Using A Total Station

    By Y. Luo

    Surface subsidence monitoring is the most effective means for investigating the nature of, and developing the techniques for predicting, the surface movement and deformation process. However, because

    Jan 1, 1992

  • AUSIMM
    Fluid Flow in a Nickel Flash Smelter - A Simulations Study

    By Hall T. P, Taylor R. N

    Fluid flow in a 1:14 scale water model of the shaft and settler of the Kalgoorlie Nickel flash smelter has been investigated by flow visualisation and numerical modelling. Detailed flow fields throu

    Jan 1, 1992

  • SME-ICGCM
    Sidewall Fracturing In Coal Room And Pillar And Pillar Extraction Panels (fdea63a5-d54d-46e2-aad5-6c4f1c72e2f1)

    By André Vervoort

    In coal room and pillar, and pillar extraction panels, the sidewall conditions were investigated based on underground measurements and numerical simulations. Three-dimensional linear elastic models pr

    Jan 1, 1992

  • CIM
    Stratigraphy, Structure, and Geochemistry of the Halfmile Lake Massive-Sulfide Deposit, New Brunswick (a738daf4-2f2a-4901-b06d-657f347a1821)

    By Robin N. Adair

    The Halfmile Lake stratiform volcanogenic massive-sulfide deposit consists of pyrrhotiterich breccia-matrix sulfides and pyrite-pyrrhotite-rich layered sulfides that form a laterally continuous sheet

    Jan 1, 1992

  • CIM
    Geology of the Stratmat Boundary and Heath Steele N-5 Zones, Bathurst Camp, Northern New Brunswick

    By Art Hamilton

    Abstract -The Zn-Pb-Cu-Ag ore deposits of the Boundary and N-5 zones near Bathurst, New Brunswick, occur in a polydeformed volcano-sedimentary sequence that is part of the Ordovician Tetagouche Group.

    Jan 1, 1992

  • TMS
    A Method For Rapid Characterisation Of Fly Ash

    By C. D. Mishra

    The recycling potential for any gainful utilisation of the waste products is dictated by their quality, especially the chemical characterisation. The methods commonly used for the analysis of fly ash

    Jan 1, 1992

  • CIM
    Black Shale Series-hosted Silver-Vanadium Deposits of the Upper Sinian Doushantuo Formation, Western Hubei Province, China

    By Fan Delian, Ye Jie, Lui Tiebing

    The lower and the upper parts of the Doushantuo Fonnation, Hubei Province, China, contain silicate-type K-rich beds (illite and feldspar), and intraclastic phosphorites, as well as Ag-V and V deposits

    Jan 1, 1992

  • TMS
    Reuse Evaluation Of Process Dusts And Slags Based On Mineralogical Analysis

    By Wolfgang Baum

    Remediation work on thermal process dusts and slags has been primarily based on chemical analyses. These data offer little information for the assessment of treatability and reuse potential. In additi

    Jan 1, 1992

  • AUSIMM
    Image Processing of Central Volcanic Region Geophysics

    By M A. Mongillo

    Most geophysical and geochemical data collected during regional exploration programmes are in vector form (location, value), and have traditionally been presented and interpreted in a profile or conto

    Jan 1, 1992

  • TMS
    Development Of Coal Fly Ash As A Hydraulic And Chemical Barrier

    By Cam T. Nhan

    The potential use of coal fly ash as a construction material has been recognized for many years,. In this work, an admixture of the ash residue is investigated for use as a landfill liner. In particul

    Jan 1, 1992

  • SME
    Geology In The Understanding Of Ore Reserve Estimation: An Australian Viewpoint

    By George J. Bujtor, Anthony K. Scott, Haddon F. King

    In 1982, the result of a 3-year study was published as "A Guide to the Understanding of Ore Reserve Estimation". The principal conclusions were that computation formed only part, and perhaps not the m

    Jan 1, 1992