Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Baltimore Metro Northeast Extension
By Charles A. Edwards, Kenneth D. Merrill
The Construction of the Northeast Extension of the Baltimore Metro involved soft ground, compressed air tunneling. During the tunneling, gasoline and dry cleaning fluid contamination were encountered.
Jan 1, 1995
-
On-Board Electrical Diagnostic System To Improve The Availability Of Continuous Mining Machines
By J. C. Cawley, J. Sottile, J. L. Kohler
Control circuit failures contribute significantly to continuous miner downtime. The time required to put the machine back into production is a function of the time required to diagnose the problem, ob
Jan 1, 1995
-
Quebec mining duties reform
By Robert B. Parsons
"The 1994 Quebec Budget included a significant overhaul of the mining duties sys-tem in that province: broadening the base and lowering the rate, all in the name of “ensuring the integrity of the taxa
Jan 1, 1995
-
Physical And Chemical Treatment Of Boron Ores
By S. G. Ozkan
Boron minerals of economic importance are primarily colemanite, tincal, and ulexite. Turkey and the United States are the leading producers of boron minerals and compounds. Other production includes d
Jan 1, 1995
-
Direct Measurement Of Accumulated Damage And Energy Absorbed By Brittle Particles During Impact
By R. P. King
A new device, called the dual impact load cell, has been developed and built at the Comminution Center to measure fracture energy and damage accumulation in brittle particles that are subject to impac
Jan 1, 1995
-
A Comparison of the Chemistry and Mineralogy of Selected Tailings: Physical and Dissolution Characteristics
By Richard D. Doepker, Cathy A. Summers
Part 1: Physical Characteristics The physical and mineralogical characteristics of samples from five sources in the Western United States were determined using size analyses, microscopic studies, a
Jan 1, 1995
-
Status Of Specialization In Major Professions
By H. A. D. Kirsten
The professions are subject to a wide range of changing conditions, and are as a result forced to become more competitive. Although there is a need for specialization under these circumstances, no for
Jan 1, 1995
-
Finding The Mining Sequence And Cutoff Grade Schedule That Maximizes Net Present Value (cde8e1ed-4cf8-4a96-8a5a-6d8fe1d35b12)
By F. Seymour
A dynamic programming algorithm is presented that takes a series of nested phases, a fixed mining rate schedule, a fixed plant production capacity schedule, and finds the mining and cutoff grade seque
Jan 1, 1995
-
The Use of Fxotation to Separate Fine Coal and Ultrafine Magnetite from Dense-Medium Cyclone Products
By M. Polat, G. Ahuja, S. Chander, M. S. Klima
A study was conducted to investigate the use of flotation in combination with dense-medium cycloning utilizing ultrafine (-10 um) magnetite, as an integrated process for high-efficiency cleaning of fi
Jan 1, 1995
-
The Total Mining System (TMS): The basis for open pit automation
By Jonathan Peck, Jim Gray
"With the implementation of more advanced monitoring, control and locating systems in surface mines, there is an ever increasing need for their mine-wide integration toward achieving over-all optimiza
Jan 1, 1995
-
New tax rules affect debt financing
By Robert B. Parsons
"New tax rules that can apply to the repayment, extinguishment, or other settlement of a company's debt are finally taking shape. These new rules are far-reaching in their application, and can af
Jan 1, 1995
-
Subsidence Monitoring Results, Thick Seam Longwall Mining In Wyoming
By Collin L. Stewart
A summary of the results of a limited subsidence monitoring program at Cyprus Amax Coal Company's Shoshone Mine No. 1 in the Hanna Basin of south central Wyoming is presented. The monitoring prog
Jan 1, 1995
-
Blasting Near Buried Pipelines: A Gas Company Prospective
By Frederick R. Cosgrave
Blasting near buried Natural Gas pipelines has always been an area of great concern. Given the many variables that the blaster must contend with in determining how to break the rock while trying to ke
Jan 1, 1995
-
Engineering-Geological Aspects of Highwall Mining Methods and Techniques
By Li G, Dean-Jones G. L, She T
Highwall mining is a specialised and largely automated mining method developed in the United States for the extraction of coal left under a shallow overburden cover after cessation of economical ope
Jan 1, 1995
-
Research and Development Activities for Initiating Devices at Sandia National Laboratories
By Dennis E. Mitchell
The need to develop and field explosive, pyrotechnic and propellant initiating systems that have high reliability and extraordinary safety requirements has led to the exploration and development of se
Jan 1, 1995
-
Geochemical Mining Impact and Possibilities of its Reduction
By V P. Elpatyevskaya, V S. Arzhanova
Main geochemical problems concerning the environment and mining industry interrelation are connected with the transformation of natural water chemistry by mining wastes. The investigation of many mine
Jan 1, 1995
-
Rockmass Damage Induced by Transient Blast Stress Waves
By Aguirre E, Chitombo G
The magnitude of stress variations associated with a blast wave near production pillars is analysed by modelling blast vibrations measured in the surrounding rockmass. The results indicate a wide va
Jan 1, 1995
-
The Waihi Epithermal Gold-Silver Quartz Vein System, New Zealand: a High-Throughput Geothermal System of Late Miocene Age (194719d8-ed32-49b1-a277-cf211be8fca3)
By Blattner P
The Late Miocene gold-silver bearing epithermal system at Waihi has some close similarities in its paleo-thermal and -geochemical structure with modern, volcanic-hosted geothermal systems such as Oha
Jan 1, 1995
-
Potential Applications of Biogenic H2S in the Treatment of Metagcontaining Process Waters and Mine Effluents
By W. M. Haffner, S. L. Borek, H. M. Edenborn, R. W. Hammack, D. H. Dvorak
The conceptual designs of three new applications for the biogenic &S treatment of metal- containing waters are presented. These include: 1. the treatment of a circumneutral-pH ground water containing
Jan 1, 1995
-
Review of the Flotation Circuit at the Laronde Concentrator
By J. Robitaille, P. Cousin
"Agnico-Eagle Mines Ltd, Laronde Division, is a gold operation processing ore containing copper and zinc. Copper is recovered as a concentrate prior to gold cyanidation.Copper concentrate grade was im
Jan 1, 1995