Search Documents

Sort by

  • SME
    Discussion - New size laboratory ball mill for Bond Work Index determination – Mining Engineering Vol. 46. No. 4. pp. 352-353

    By H. Nemutolluhi

    Discussion by G.E. Agar In the April issue of Mining Engineering there is a technical note "New size laboratory ball mill for Bond Work Index determination" written by M. Nematollahi which is very

    Jan 1, 1996

  • ISEE
    Discovery, Analysis, and Elimination of Instantaneous Misfires in Underground Production Blasts

    By Norman Disley, David B. Counter, Lionel Hebert

    Misfires in underground and surface production blasts can be costly. Costs can arise from loss of resource, production interruptions, having to redrill or otherwise refire the blast (a hazardous proce

    Jan 1, 1996

  • TMS
    Analysis of Thermal Spray Systems by Comprehensive Numerical Simulations

    A comprehensive numerical capability for the analysis of Thermal Spray (TS) systems consisting of a three-dimensional compressible, turbulent flow Navier-Stokes model and a multi-phase particle flow m

    Jan 1, 1996

  • SME
    Advances In Mill-Lining Technology

    By R. Svensson

    Mill linings play an important role in all comminution processes with tumbling mills. The selection of the lining profile and the lining material has a great impact on overall grinding cost and mill t

    Jan 1, 1996

  • AUSIMM
    The Australasian Joint Ore Reserves Code in Practice

    By West R

    Since its introduction in 1989, the Australasian Joint Ore Reserves Code (the JORC Code or the Code) has been one of the success stories of the informational interface between the mining industry an

    Jan 1, 1996

  • ISEE
    Difficult Sinking Cut in Severe Winter Conditions Improves Productivity at Lac Des Iles Mines

    By Cary Moffat, John Kita, Rick Walker

    The Lac des Iles Mine, in an isolated area of NorthwesternOntario is a relatively new open pit platinum and palladium mine. They were encountering problems with the equipment and production scheduling

    Jan 1, 1996

  • CIM
    Metallogenic overview of the Nain Province, northern Labrador

    By Derek H. C. Wilton

    "The Nain Province (NP) of northern Labrador is a >600 km long by =100 km wide Archean craton that has undergone relatively little mineral exploration until economically signifcant concentrations of o

    Jan 1, 1996

  • AUSIMM
    The Use of the Vanyukov Process for Processing Nickel Containing Charge

    By Sorokin M, Komkov A, Fyodorov A

    The Vanyukov Process is a high-intensity smelting system that has been proven over the last 20 years for various metallurgical operations including the smelting of copper, nickel, copper-zinc, antim

    Jan 1, 1996

  • SME
    Operation And Heap Leach Expansion Of The Sukhaybarat Project - Saudi Arabia

    By P. M. Sandgren, H. Al-Dabbagh

    Saudi Company for Precious Metals (SCPM) is jointly owned by the Saudi Arabian state organization Petromin (The General Petroleium & Mineral Organization) and Boliden of Sweden. The company operates t

    Jan 1, 1996

  • AUSIMM
    Suitability of the Central Thickened Discharge Method for Nickel Tailings Disposal in Western Australia

    By Ennis P. C

    The Mt Keith ultramafic intrusive extends for about 200 kilometres from Agnew in the south to Wiluna in the north. It forms the host for a number of nickel sulphide orebodies including Mt Keith and

    Jan 1, 1996

  • TMS
    Continuous Fuming of Zinc-Containing Slags

    By G. G. Richards

    "The slag fuming process has operated for close to 70 years to recover zinc from lead blast furnace slag. The process is normally carried out through the batch treatment of slag by submerged injection

    Jan 1, 1996

  • SME
    Seismic Tomography Aids Ground-Control Decision Making

    By Neil and Associates

    Seismic tomography is one of several additions to the suite of geotechnical engineering tools for use in various underground rock and mineral geologic structures. Seismic tomography is a method for

    Jan 1, 1996

  • DFI
    Some Problems Encountered During Pile Installation - Synopsis

    By [D. N. ] Naresh

    During different activities pile installation like pile boring, concreting etc., it is likely that various problems, depending up on site condition may be encountered. There are possibilities that som

    Jan 1, 1996

  • SME
    The Work-Crew Performance Model: A Method For Defining And Building Upon The Expertise Within An Experienced Work Force (ad926623-dd0b-4ffd-9afd-e3ffd1095fbc)

    By G. T. Lineberry, W. J. Wiehagen, L. L. Rethi

    This paper discusses a practical method for enhancing the performance of mining work crews. The method, described as the Work Crew Performance Model (WCPM), seeks to define performance variability wit

    Jan 1, 1996

  • SME
    Stopped Cracks And Changes In Fragment Shape And Slope

    By T. P. Meloy

    Understanding the illusive nature of the catastrophic failure of brittle solids is difficult. Proposed is a hypothesis of crack cessation. If, during catastrophic failure, cracks in a brittle solid st

    Jan 1, 1996

  • SME
    Graphical Methods For Comparing Different Sampling Campaigns

    By B. M. Davis

    Frequently ore reserve studies utilize samples from a series of drilling or other types of sampling campaigns. Sometimes there is a mix of sample types, say for instance, channel samples from undergro

    Jan 1, 1996

  • SME
    The Effect Of Additives On Stirred Media Milling Of Limestone

    The effects of additives, sodium hydroxide, sodium carbonate, sodium oleate, oleic acid and polyacrylic acid, on stirred media milling of limestone have been investigated. The results are evaluated in

    Jan 1, 1996

  • TMS
    Reactive Diffusion between Silicon and Niobium Carbide: Application to the In-Situ Synthesis of a Silicon Carbide-Niobium Disilicide Composite

    By Y. A. Chang, J. Woodford, C. R. Kao

    Reactive diffusion studies between NbC and Si were carried out at 1300 °C under a vacuum of 10-5 torr and a uniaxial pressure of 1 MPa. The annealing time ranged from 8 to 100 hours. The Si used was s

    Jan 1, 1996

  • TMS
    Innovative Use Of Activated Carbon For The Removal Of Heavy Metals From Ground Water Sources

    By Tom Lewis

    This report discusses the evaluation of the ENVIRO-CLEAN PROCESS, a technology developed by Lewis Environmental Services, Inc. for the recovery of metals such as chromium, mercury, copper, cadmium, le

    Jan 1, 1996

  • CIM
    Gold Mineralization in Archean Banded Iron Formation, Third Portage Lake Area, Northwest Territories, Canada (407bbb63-2364-4223-b699-c887fb23f7b7)

    By R. S. James, S. P. Goff, A. E. Armitage

    "Oxide-facies banded iron formation in the Third Portage Lake area is hosted by ultramafic and calc-alkaline volcanic rocks and related sedimentary rocks of the Archean (2.8 Ga) Woodburn Lake Group, 8

    Jan 1, 1996