Search Documents

Sort by

  • SME
    Three Dimensional Geological And Resource Modelling Of The Lisheen Base Metal Deposit, Co Tipperary, Ireland.

    By John D. Elmes

    The purpose of this paper is to describe the geology and the modelling work carried out to date. The Lisheen Zinc-Lead deposit was discovered in April, 1990. The deposit comprises two stratiform sul

    Jan 1, 1998

  • TMS
    Kennecott Utah Copper Smelter Modernization (8900290e-0a5a-4331-88e1-53de0cc3185e)

    By C. J. Newman

    Prior to 1995, the smelting process at the Kennecott Utah Copper Corporation (KUCC) smelter consisted of Noranda reactors and Pierce-Smith converters. In the consideration of expansion opportunities,

    Jan 1, 1998

  • IMMS
    Comparison Of The Tag Mound And Stockwork Complex With Cyprus-Type Massive Sulfide Deposits: Results From Leg 158 Drilling

    By Mark D. Hannington

    Drilling of the active Trans-Atlantic Geotraverse (TAG) deposit during ODP Leg 158 indicated that the size of the mound-stockwork complex is approximately 3.9 million tonnes, including 2.7 million ton

    Jan 1, 1998

  • SME
    The Retention of Arsenate in an Oxisol Soil Under Different Electrolyte Systems

    By Clarice L. Amaral, Ricardo Melamed

    Clay-coating has been used as an environmental technology tool for the immobilization of toxic elements. The mechanisms of arsenate retention in clays suggest that not only the system pH is of fundame

    Jan 1, 1998

  • ISEE
    Dri-Gel Explosives

    By Mike Zimmermann

    With the steady decline in the production of dynamites throughout the world, a gap appeared in the market which could only be adequately filled by rigid paper packaged explosives. To fill this need, t

    Jan 1, 1998

  • SME
    In Situ Geochemical Fixation Of Uranium And Molybdenum Using Calcium Polysulfide

    By R. Z. Pyrih

    Uranium tailings at Cotter Corporation's Canon City, Colorado Mill were moved to a double-lined impoundment, but uranium and molybdenum salts remaining in the fractured bedrock underlying the old

    Jan 1, 1998

  • SME
    On Assessing And Enhancing The Energy Efficiency Of Comminution Processes

    By D. W. Fuerstenau, J. Vazquez-Favela

    This paper shows how the efficiencies of size-reduction processes depend on the mode of particle constraint and energy transfer within the comminution device: namely, whether the process consists of s

    Jan 1, 1998

  • SME
    On The Improvement Of Sulfides Metallurgy The Use Of A Density Separator

    By F. J. Sotillo

    Mineral processing requires good classification of particles to attain an adequate separation of minerals. This is of utmost importance in the case of sulfide minerals. An ideal classification is obta

    Jan 1, 1998

  • SME
    Pilot Plant Processing Of Ammoniacal Nickel Leach Liquor For The Recovery Of Nickel Using LIX 64N

    By P. C. Rath, K. Srinivasa Rao, T. Subbaiah

    A process for the recovery of nickel from ammoniacal leach liquor through an integrated solvent extraction-electrowinning (SX-EW) flowsheet was tested on a pilot-plant scale. The objectives of the tes

    Jan 1, 1998

  • SME
    Issues Related To Design .And Performance Optimization Of Continuous Miner For Increased Productivity

    By Jamal Rostami

    Continuous miners (CM) are the most popular underground mining machinery in soft rock mining, playing a dominant role in the production of minerals ranging from coal to evaporites while finding increa

    Jan 1, 1998

  • SME
    Exhibitors Show Off Their Products, Services At SME Annual Meeting And Exhibit - ABB Industrial Systems - 100 Years Of Experience In Ac Motors

    ABB Industrial Systems is one of the largest electrical engineering companies in the world. ABB develops, manufactures and markets electric drives. The company has more than 100 years experience in t

    Jan 1, 1998

  • AUSIMM
    Coal Geology - Where to From Here?

    By Hanna P

    Coal geologists are under pressure to minimise exploration expenditure, maximise interpretation confidence and produce the results often too soon. This pressure continues to increase as companies are

    Jan 1, 1998

  • ISEE
    The Measurement and Control of Blast Induced Damage of Final Pit Walls in Open Pit Mining

    By William R. Adamson, Carlos R. Scherpenisse

    The successful development of surface mining operations depends, amongst other factors, on the successful creation of final pit walls which offer long term structural stability. The achievement of suc

    Jan 1, 1998

  • DFI
    Jobsite Safety Inspection Checklist

    By Sam Messina

    [Project: Job Number: Date: Superintendent: Person Making Inspection: Note: The following checklist shall be used on a regular basis as an overall assessment of the jobsite. The checklist

    Jan 1, 1998

  • SME
    Evaluation and Standardization of Multiple Slurry Pumping Systems

    By Steve Garcia

    GEORGE WEINMAN: Our next speaker is Steve Garcia, operations vice president and general manager of mining at IMC-Agrico, Florida. Steve was born in Lakeland, Florida, to an IMC mining family. He has 1

    Jan 1, 1998

  • SME
    Position-The Key To Managing Mine Information

    By M. Nichols

    Where am I? Where are they? Where is it? These are the fundamental questions that need to be answered in managing people and resources. This paper explains how GPS positioning technologies answer th

    Jan 1, 1998

  • AUSIMM
    The Use of Unique Admixture Technologies in Mine Backfill-Technology Description and Case Histories (037359e3-5adb-49ba-a78e-a0ed2db408e1)

    By Karlson R, Rispin M

    Chemical admixtures are not commonly included in the variety of backfill mixes used in the mining industry. This may be attributed to several reasons including, but not limited to: the perceived hig

    Jan 1, 1998

  • AUSIMM
    Cemented Rock Fill Research at Mount Isa Mines Limited 1992-1997 (b215405e-1e90-4b21-837b-f227a5480b5d)

    By Greenwood AG

    Research into cemented rock fill at Mount Isa Mines Limited since 1992 is described. The key mechanisms controlling segregation during stope filling with cemented rock fill are described and include

    Jan 1, 1998

  • SME
    We Need More Training-How to Get the Biggest Bang for the Buck

    By Jim Armbrust

    JAMIE DAVIS: Our next speaker is Jim Armbrust, maintenance manager at Phelps Dodge, Morenci. Jim's presentation is titled "We Need More Training-How to Get the Biggest Bang for the Buck." We&apos

    Jan 1, 1998

  • AUSIMM
    SEZ-GIS A Decision-Making Tool

    The city of Kalgoorlie-Boulder is located 595 kilometres east of Perth in Western Australia, and has a population of just over 30 000. Western Australia's third largest city lies on one of the

    Jan 1, 1998