Search Documents

Sort by

  • CIM
    Twelve Technology Tools to Design and Optimise the Production Chain from Resource to Product

    By Rob Morrison, Peter Cameron

    "Many products and technologies have been developed from outcomes of research projects carried out by the Julius Kruttschnitt Mineral Research Centre (JKMRC). When these products and technologies are

    Jan 1, 2003

  • AUSIMM
    Towards Achieving Sustainable Water Management for an Acidic Open Cut Pit at Mount Morgan, Queensland

    By T Laurencont, C Unger

    The Mount Morgan minesite, located approximately 40 km SW of Rockhampton in Central Queensland, comprises 270 ha of unrehabilitated land which is the currently the major source of acid mine drainage r

    Jan 1, 2003

  • AUSIMM
    A Method to Separate Phases of Sulfur in Mine-Waste Piles and Natural Alteration Zones, and to Use Sulfur Isotopic Compositions to Investigate Release of Metals and Acidity to the Environment

    By C J. Berry, P H. Briggs

    Assessment of metal mobility, acid rock drainage production, and toxic effects from weathering of mineralised materials (ie mine-waste piles and outcropping alteration/ore zones) is key in evaluating

    Jan 1, 2003

  • SME-ICGCM
    Recent Developments in the Use of Seismic Tomography in Longwall Mines

    By Erik Westman

    Tomographic imaging, commonly known as a CAT-scan or CT-scan, is used in the medical field to generate a picture of the interior of a body. Current research is applying this method to bodies of rock s

    Jan 1, 2003

  • AUSIMM
    Reducing Mine Closure Risks ù A Team-Based Approach

    The Closure Risk model was developed as a new tool to aid decision makers in the complex area of mine closure. It uses a simple analytical technique that allows the decision maker to simplify what is

    Jan 1, 2003

  • IMPC
    Gold Leaching by Thiosulfate Solution and Recovery

    By Atsushi Shibayama, Toyohisa Fujita, Wan-Tai Yen, Ke-jun Liu

    "A gold has been leached with ammonium thiosulfate solution and several leaching conditions have been studied. The leached solution has been recovered by solvent extraction and the optimum conditions

    Jan 1, 2003

  • CIM
    The Red Dog VIP Mill Optimization Project A Study in Fast-Track Project Execution and Alliance Contracting (5aae1f12-06e2-4656-a27b-a608072456ab)

    By George H. Hope, Steve Ciccone

    "The Red Dog Mine is both the largest known zinc reserve and the largest zinc producer in the world. The mine started in 1989, and by 1999 had increased production from approximately 300,000 tonnes pe

    Jan 1, 2003

  • AUSIMM
    Solid Stabilisation of Soluble Mine Waste

    By C Ferron, R Massimi

    There is approximately 240 000 tonnes of arsenic trioxide dust stored in underground chambers at the Giant Mine in Yellowknife, Northwest Territories, Canada. To minimise the amount of arsenic release

    Jan 1, 2003

  • CIM
    Role of dispersants in the production of fine particle size calcium carbonate and kaolin slurries

    By J. S. Phipps, D. R. Skuse

    "Aqueous slurries of fine particle size calcium carbonate are used in a diverse range of end-use products. In many cases, the end-use performance is governed by the fineness of the particle size distr

    Jan 1, 2003

  • CIM
    The Red Dog VIP mill optimization project. Part A: Rectifying the shortage of flotation capacity

    By George Hope, Brigitte Lacouture

    "The Red Dog mine has increased mill throughput most years since start-up. Although flotation equipment has been added over the last 10 years, the Red Dog metallurgical performance has been restricted

    Jan 1, 2003

  • AUSIMM
    Fines Minimisation in the Comminution of Phosphate Rock

    By F Shi, W Valery

    WMC Fertilizers (WMCF) operates a Beneficiation Plant at Phosphate Hill in Queensland, Australia. The plant consists of two-stages of crushing, followed by a wet scrubbing and desliming circuit. Ore i

    Jan 1, 2003

  • AUSIMM
    Taking it to the Streets - Recent Experiences of Participation in the Initiation

    Newmont Waihi Operations is participating in the initiation of a community liaison forum in association with the local district council. The objective is to provide a forum for the free and regular e

    Jan 1, 2003

  • TMS
    Preparation, Characterization And Solubilities Of Adsorbed And Co-Precipitated Iron (III)-Arsenate Solids

    By Y. F. Jia

    Arsenic constitutes a major contaminant for the hydrometallurgical industry. Its removal and immobilization from process effluents typically involves lime neutralization and co-precipitation with ferr

    Jan 1, 2003

  • IMPC
    Waste Treatment Management in the Northwestern Russia

    By Anatoly N. Vinogradov, Vyacheslav A. Tsukerman

    The North-West Russia for 70 years is one the main producers of Cu, Ni, Co, Al, P, REE, Zr, Ti, Ta, Nb, Fe ores and other minerals in the Europe. The largest mining companies locates in the Murmansk r

    Jan 1, 2003

  • TMS
    Recovery Of Cobalt And Tungsten From Scrap Carbide Pieces Through A Hydrometallurgic Route

    By S. N. Ashrafizadeh

    Nowadays, hard carbides have found various industrial application in the manufacture of cutting and drilling tools as well as metal forming devices. About 60% of the world tungsten production is consu

    Jan 1, 2003

  • SME
    North Airfield Drainage Improvement at Chicago-O’Hare International Airport: Soil Stabilization Using Jet Grouting

    By Martin G. Taube, Dwayne A. Lewis

    Drainage improvements at O’Hare International Airport, Chicago, IL included the installation of a drainage and storm water system to control the over?ow from nearby Willow Higgins Creek. This involved

    Jan 1, 2003

  • TMS
    The Contribution Of Pyrometallurgy To Sustainable Development (Keynote)

    By W. K. Rankin

    Achieving continued economic growth with social equity within the natural limits of the Earth's eco-systems is the major issue facing the world today. The material and energy needs of the world c

    Jan 1, 2003

  • SME
    Design and Construction of London Cable Tunnels

    By Michael Francis, Chris Darton

    More than 55 km of tunnels have been constructed by TBM in the last 12 years to refurbish and upgrade the high voltage cable network in London. These include a tunnel of 20km length using EPBM machine

    Jan 1, 2003

  • AUSIMM
    Long-Term Changes in Water Chemistry as a Result of Mine Flooding in Closed Mines of the Pittsburgh Coal Basin, USA

    By E Werner, B R. Leavitt

    The chemistry of acidic mine drainage discharging from flooded coal mines is commonly reported to improve with time after flooding. This investigation describes a 18-year dataset of post-flooding wate

    Jan 1, 2003

  • AUSIMM
    The Role of Acid Mine Drainage in Heavy Metal Dispersion

    By B Brattli

    The dispersion pattern of heavy metals in soil and water is a consequence of complex geophysical and geochemical processes. Metal release from mining sites and subsequent migration occur primarily thr

    Jan 1, 2003