Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Copper Smelter Projects: Installation and Operation of Large Kumera Steam Dryers
By S. L. Chen
The Kumera Technology Center developed a unique type of steam dryer for drying copper concentrate in the mid 1990s. The dryer has been chosen in several copper smelter projects since 1999. To expand p
Jan 1, 2007
-
Alternative To Lime As A Rheology Modifier In The Transport Of Iron Ore Slurry By The Samarco Pipeline
By T. A. Silva, A. C. Bragança
Lime has been added to the iron ore slurry transported by the Samarco pipeline since its operation start-up in 1977.Initially, internal corrosion was the main concern therefore the reagent was used on
Jan 1, 2007
-
Mineral Resource Throughput Management: From An Iron Ore Mine To Steel In India (b7c708d0-4ac4-4078-9cb8-41844cba4156)
Mineral Resource Throughput Management is based on the extraction of the maximum potential value from an ore reserve with the emphasis to generate maximum ROI and ROR (return on reserve). A stee
Jan 1, 2007
-
Latest Electrode Technology Delivering Improved Electrode Performance In Submerged Arc Furnaces
By Henk van der Bijl, Sean Rogers, Eugene Sidorski, Alan Carpenter
The electrode column is the heart of the submerged arc furnace. Superior electrode performance provides improved furnace performance. This paper describes the main features of the electrode column tha
Jan 1, 2007
-
Environmental Assessment Study For Extension Of Spadina Subway In Toronto
By Verya Nasri, Scott Thorburn
The City of Toronto and the Toronto Transit Commission (TTC) have conducted an Individual Environmental Assessment (EA) for a 6.2 km, 4-station underground extension of the Spadina Subway from Downsvi
Jan 1, 2007
-
A Precise And Accurate Method For Glue Determination In Copper Electrorefining
By E. Rezaei
Glue is an animal protein that is used with other organic agent such as thiourea, in copper electrorefining. The concentration of glue has to be controlled carefully, because the electro-deposition pr
Jan 1, 2007
-
Lowered Expectations: The Impact Of Yield Stress On Sand Transport In Laminar, Non-Newtonian Slurry Flows
By R. Sun, R. G. Gillies, R. S. Sanders, J. Schaan
The pipeline transport of paste, backfill or thickened tailings slurries is an important component of the tailings disposal process in many mines around the world. These mixtures contain significant f
Jan 1, 2007
-
Reducing Copper Losses In The Mitsubishi Process: A Pyrometallurgical Approach
By F. Tanaka
Copper losses to discard slag have long impacted on the profitability of copper smelters. Businesses based on the treatment of secondary materials have also revealed that copper losses are indices of
Jan 1, 2007
-
High-Temperature Deformation Of Fe3Al
By A. N. Shen
Fe3A1 intermetallics are potential inexpensive candidate for hot applications. In this project, torsion tests on hot-rolled and annealed Fe3A1 (Fe-15.5A1-5.8Cr-1.0Nb¬0.05C) were carried out over the r
Jan 1, 2007
-
Case History of Trenchless Construction at the Lower Northwest Interceptor Program, Sacramento, California
By Steven Norris, William Moler, Michael Cole, Patrick Doig, Debi Lewis, Craig Pyle, Matthew Crow
The recently completed Lower Northwest Interceptor Program (LNWI) in Sacramento, California comprises, ten pairs of micro tunnels totaling 4,369 m (14,417 ft),three horizontal directionally drilled bo
Jan 1, 2007
-
Ore Characterisation of the Aqqaluk Deposit at Red Dog
By Steven W. Wilson, Brigitte Lacouture, Nichola A. McKay
"The Aqqaluk deposit is a lead-zinc ore body that lies immediately north of the Main Pit at Teck Cominco’s Red Dog Mine in Alaska. It is scheduled to begin production in 2011 or 2012. A project team w
Jan 1, 2007
-
Development of Slurry Wall Technique and Equipment and CSM Cutter Soil Mixing for Open Cut Tunnels
By W. G. Brunner
The slurry wall technique has undergone an evolution from its invention to its today’s status. In the early stages slurry walls were built with cable grab, later on with much stronger hydraulic grab a
Jan 1, 2007
-
Multiple Seam Mining In Appalachia State-Of-The-Art, State-Of-Practice, State-Of-The Future
By D. Newman
Multiple seam mining is prevalent in Southern Appalachia because economically mineable coal seams are numerous and frequently occur in close vertical proximity. West Virginia, Kentucky, and Virginia
Jan 1, 2007
-
The Big Walnut—A Planned Approach
By Tom Szaraz, Steve Skelhorn
Part of a major sewer expansion for the City of Columbus, Ohio. The Big Walnut Outfall Augmentation Sewer (BWOAS) consists of 4,000m (13,200 ft) of 3.66m (12 ft)diameter tunnel passing mainly through
Jan 1, 2007
-
Truck Fleet Utilisation and Fuel Saving in Aitik
Aitik, a Boliden owned and operated open pit mine located in northern Sweden, will expand production from 18 Mt per year today to 36 Mt per year copper ore during 2010. The challenge for the mine oper
Jan 1, 2007
-
The Emerging Technology Of EHDE As Applied To Deep Foundations
By Jerold Bishop
The application of the ?electro-hydrodynamic effect? (EHDE) to civil engineering has been made in the construction of drilled piles. Equipment for the commercial application of this process was devel
Jan 1, 2007
-
Preventive Maintenance Policy Supported By A Quality Control Chart And Kolmogorov-Smirnov Tests: Emet Colemanite Mineral Processing Plant, Turkey
By S. Yerel
In a mineral processing plant, the determination of a preventive maintenance schedule is one of the most important maintenance policies. In this study, to determine the preventive maintenance schedule
Jan 1, 2007
-
Improving the Capability for Real Time Assessment of Roof Conditions through Intelligent Roof Bolt Drilling Operations,
By Robert Anderson
Advance knowledge of roof conditions can lead to improvement in roof control strategies that will reduce roof falls and ultimately will reduce injuries to mine workers. J.H. Fletcher and Company, in
Jan 1, 2007
-
Forensics Of Difficult Ground Conditions Leading To Advanced Solutions For Recovery Of An Abandoned Tunnel Project
By Faruk Oksuz, Phillip L. Covell, Martin Doll
A series of difficult ground conditions causing high groundwater inflows and hazardous gas intrusion abruptly halted the construction of a 6.4-meter (21-foot) finished diameter and 1,890 meters (6,200
Jan 1, 2007
-
Experience with and benefits from the use of 3D Stereophotogrammetry for blast design and control
By Peter Moser, Mark Ganster, Andreas Gaich
Surveying of a bench face before blasting is a pre-requisite for a proper blast planning and for a satisfying blasting result both in terms of safety and fragmentation. When surveying a bench face, pr
Jan 1, 2007