    Implementing BIM Underground on Progressive Design-Build Atlanta Plane Train West Extension Project - NAT2022

    By Jeff Fontana, Daniel Ebin, Eric Westergren, William Currier

    The PMott MacDonaldlane Train Tunnel West Extension (PTTWE) Project at HartsfieldJackson Atlanta International Airport includes the extension of the existing automated people mover system and terminal

    Dec 1, 2022

  • SME
    Vintage TBM Cuts Months Off Schedule in San Antonio - NAT2022

    By Cody Edwards, Ross Webb

    5 miles of soft ground tunnel excavation for the SAWS W‑6 project finished months early despite difficult conditions. Success was achieved using TBMs and other equipment built long before most of the

    Dec 1, 2022

  • SME
    Underwater Tunnel Repair with Stainless Steel Segmental Liner - NAT2022

    By Matthew Goff, Russell Lutch

    The Great Lakes Water Authority (GLWA) operates the largest regional water authority in the State of Michigan. Two of the tunnels supplying raw water to the system from the Detroit River are the Sprin

    Dec 1, 2022

  • SME
    Parametric Study of Portal Area Condition for Mountain Tunnel Damaged by Earthquake - NAT2022

    By Hajime Kitamura, Nobuharu Isago, Yuta Yamanishi, Kosuke Kawata, Hiroshi Yagi, Akira Matsuoka

    Mountain tunnels are generally considered to be stable during earthquakes, however, it is known that the portal areas are prone to seismic damages. Characteristics in portals such as the location of t

    Dec 1, 2022

  • SME
    Lateral Deflections and Vertical Control in Tunnel Control Networks - NAT2022

    By Joern Katzer

    It is vitally important to any tunnel project to have an accurate and reliable survey control network inside the tunnel for layouts, as-built surveys, and to provide guidance to the tunnel boring mach

    Dec 1, 2022

  • SME
    Risk Modelling Techniques for Complex Tunnelling Projects from Deterministic to Probabilistic Methods: Have We Done Enough? - NAT2022

    By P. Sander, M. Spiegl, J. Reilly, A. Van Droogenbroeck

    Although the outdated idea of calculating risk as the deterministic product of its likelihood and impact is not entirely a thing of the past, a multitude of organizations have adopted the usage of pro

    Dec 1, 2022

  • SME
    A Case Study Establishing Optimization Techniques and the Procedure for Successful Numerical Simulation of Ground-Structure Interaction - NAT2022

    By Ali Keneti, Xavier Ryan, Gerardo Sanchez, Shannon Goff

    In this study, FLAC3D modeling was conducted for ground-structure stability assessment for a pilot tunnel passing under a large shaft excavated in the vicinity of existing structures at Karangahape St

    Dec 1, 2022

  • SME
    Three Rivers Protection and Overflow Reduction Tunnel (3RPORT) City of Fort Wayne Tunnel Alignment and Adit Redesign in Construction: A Schedule Driven Journey - NAT2022

    By Todd S. Webster, Matthew J. Pierce, Brad D. Krumel

    With the Working Shafts and Starter Tunnel under way, it became apparent this 4.7-mile, 19-foot diameter wet weather tunnel was going to live up to its name. The shaft’s pre-excavation grouting was co

    Dec 1, 2022

  • SME
    The Use of Cloud-Based Geotechnical Software During the Final Design of the New Haven Downtown Storm Sewer Infrastructure Improvement Project - NAT2022

    By Michael Schultz, Gregory Sanders

    The City of New Haven is planning to construct the Downtown Storm Sewer Infrastructure Improvement project to mitigate on-going stormwater flooding in the Long Wharf District. The proposed project inc

    Dec 1, 2022

  • SME
    Improved Contracting Practices and Ground Risk Management Using Geostatistics - NAT2022

    By Jacob Grasmick, Bill Newns

    Despite ongoing digitization and “hardware” technological advances, geotechnical uncertainty remains the most significant risk in underground and tunnel construction. And, whilst they are commonly hel

    Dec 1, 2022

  • SME
    Analytical Behavior of a Tunnel with Rock Bolts and Shotcrete During an Extreme Fire Event - NAT2022

    By Dean Newman, Michael Behrens, Mark Trim, Justin Arifin

    Road tunnels in recent infrastructure projects in Sydney, Australia, are designed to have a fire resistance level of either a 4-hour cellulosic fire or a 2-hour hydrocarbon fire. Where permanent groun

    Dec 1, 2022

  • SME
    Deep Rock Wastewater Tunnel in Delco - NAT2022

    By Dafydd Chandler, Milissa Hirst, Charles Hurst, Gary Snyder, Leszek Glodkowski

    The Delaware County Regional Water Quality Control Authority (DELCORA) will be adding tunnel infrastructure to its wastewater conveyance system. This program involves the construction of a conveyance/

    Dec 1, 2022

  • SME
    The Next Generation of Mixed Ground Tunnel Boring Machines - NAT2022

    By Brad Grothen

    What is the most economical way of tunneling in mixed ground that may experience high pressures? Non-continuously pressurized, mixed ground Tunnel Boring Machines (TBMs) are being utilized to deal wit

    Dec 1, 2022

  • SME
    Hybrid Shoring Design for the Courthouse Commons Tunnel in San Diego, California: Controlling and Predicting Ground Movements - NAT2022

    By Maryam Motamed, Jeremy Stone, Leigh Anne Zhang

    Controlling and predicting ground movements are essential to the design of shoring systems. The Courthouse Commons tunnel in San Diego, California, included a 56-foot-deep temporary shaft as a launchi

    Dec 1, 2022

  • SME
    Unprecedented In-Tunnel Diameter Conversion of the Largest Hard Rock TBM in the U.S. - NAT2022

    By Evan Brinkerhoff, Steve Chorley

    The largest hard rock TBM ever to bore in the USA, an 11.6 m diameter Robbins Main Beam TBM, recently underwent a planned in-tunnel diameter change to a more compact 9.9 meters. The first-of-itskind c

    Dec 1, 2022

  • SME
    Trenchless Utility Relocation Addresses Environmental Impact for Channel Crossing - NAT2022

    By John D. Hanifin, C. Kevin Moon, Eric C. Wang

    Value Engineering on Connecticut DOT’s Walk Bridge selected the trenchless option for utility relocation to address the channel crossing’s environmental concerns. The design and construction considera

    Dec 1, 2022

  • SME
    Overcoming Challenges in Tunneling for Albany’s Beaver Creek Clean River Project, Albany, New York - NAT2022

    By Jerry Wang, Greg Bold, Mahmood Khwaja, Rebecca Caldon, William Simcoe

    Phase III and Phase IV of the Beaver Creek Clean River Project, Albany, NY, includes microtunnel construction of 2,320 feet of 48-inch/36-inch internal diameter (ID) conveyance pipe and a 525 foot lon

    Dec 1, 2022

  • SME
    Design of Montreal Metro Blue Line Extension Tunnel - NAT2022

    By Verya Nasri, Mehdi Bakhshi

    The development of the Montreal metro extension Line 5 -Blue Line- toward the northeast are located between the existing Saint-Michel station and Anjou. It consists of 6-km long two-track tunnel, five

    Dec 1, 2022

  • SME
    Freight Trains in Tunnels—Operational & Safety Aspects from the Tunnel Ventilation Perspective - NAT2022

    By Bernd Hagenah, Hans-Peter Vetsch, Eric Jones, Sean Cassady, Danielle Johnson, Petr Pospisil

    There are a number of issues associated with freight trains in non-electrified tunnels that are fundamental during the planning and operation of a rail tunnel. During uphill operation, increased air t

    Dec 1, 2022

  • SME
    Design and Construction Challenges for the North Temple Tunnel - NAT2022

    By Todd Kilduff, Michael Tinney

    The North Temple Tunnel pedestrian underpass in Salt Lake City, UT was built using a pipe canopy method that met significant challenges in potentially running ground conditions. Kilduff Underground En

    Dec 1, 2022