Search Documents

Sort by

  • ISEE
    Demolition Using Water-Cased Kicker Charges

    By Emily Johnson, Catherine Johnson, Rachel Bauer, Paul Pitzel

    Demolition projects involving explosives may incorporate cutting charges to sever columns in collaboration with kicker charges that “move” the columns out of alignment. Traditional kicker charges ofte

    Feb 6, 2023

  • ISEE
    Effect of Presplit Perimeter Control in an Underground Cut and Fill Mine

    By David Porter, Nathan Rouse

    The implementation of presplit perimeter control in underground mining as a method to decrease dilution yields positive benefits throughout the current and future mining cycles. A case study to unders

    Feb 6, 2023

  • ISEE
    High-Performance Emulsion-Based Booster

    By Soseol Kim

    A high-performance Emulsion-based booster explosives has been developed that can be used as a booster for bulk explosives. Currently, Pentolite booster, which is mainly used as a booster for bulk expl

    Feb 6, 2023

  • ISEE
    Application Electronic Initiation System in Hot and Reactive Ground Conditions

    By Muhammad Yamani, Marsell Riviera, Herry Saputra, Rizky Amin

    Drill and Blast processes in hot and reactive ground conditions are a severe challenge in mining, especially in the blasting process. Our main objective is safety issues without compromising the blast

    Feb 6, 2023

  • ISEE
    More than Scratching the Surface – Capturing Blast hole Features to Improve QA/QC and Compliance to Design

    By Paul Klaric, Nicholas Bodley

    Every blasting engineer or professional can attest to the age-old conundrum of obtaining accurate hole information on a large scale prior to loading explosive charges in a blast hole. Even though the

    Feb 6, 2023

  • ISEE
    MEMS Accelerometers in Blast Induced Shock and Vibration Monitoring

    By W. J. Birch, R. Farnfield, S. Hosein, C. Johnson

    Modern smart phones include accelerometers based on MEMS (Micro Electro Mechanical System) technology giving the possibility to measure both acceleration and orientation. The widespread use of such ph

    Feb 6, 2023

  • ISEE
    Computational Fluid Dynamics (CFD) Versus Traditional Methodologies to Assess Airblast from Blasting

    By Estefania Aramayo, Jhon Silva, Todor Petrov

    Blasting is one of the most critical activities in a mining operation. Nowadays, many quarries have to follow a considerable quantity of environmental restrictions that drive the need to improve the c

    Feb 6, 2023

  • ISEE
    A New Method of Reactive Ground Testing

    By Gary Cavanough

    The spontaneous exothermic reaction of ammonium nitrate explosives with sulphide-containing rocks, commonly referred to as reactive ground, is a site-specific condition that can lead to spontaneous de

    Feb 6, 2023

  • ISEE
    Floor Blasting for Establishment of a New Crusher in Underground Limestone Mine

    By Chris Searing

    An underground room-and-pillar limestone mine in Western Missouri acquired a new primary crusher, physically larger in every dimension than the unit it replaced. Due to the space constraints within th

    Feb 6, 2023

  • ISEE
    Controlled Blasting in Natural Geotechnical Structures (cavities) at the Hierro Mine - Brazil

    By Sérgio Augusto Ferreira, Alan Gerson Diaz Butron, Carlos E. Arroyo, Marcus Neves, Jorhs Enrique Casimiro Huayhua, Dieggo Santos, Eventomar Junior

    The presence of natural underground cavities is normally a characteristic of iron ore deposits, specifically in tropical deposits. Brazil and the United States are the only countries that have a legis

    Feb 6, 2023

  • ISEE
    Development of Controlled Blasting Pattern for Rock Excavation to Create Foundation of an Industrial Establishment

    By Dipankar Gorain, A K. Vishwakarma, Vivek K. Himanshu, Murari P. Roy, Shubham Singh, R S. Yadav

    The industrial establishments of a power plant consist of many important structures viz. cooling tower, wagon tippler, track hopper, plants and offices. The leveled foundation is the utmost need for e

    Feb 6, 2023

  • ISEE
    Electronic Initiation System in Fosterville Gold Mine Development

    By C. Zuniga, S. Combrinck, C. Peters

    Agnico Eagle Gold have partnered with Enaex Australia at their Fosterville gold mine to leverage a combination of drill and blast technologies to optimise underground development mining. The mine is t

    Feb 6, 2023

  • ISEE
    Encounter with Potential Acidic Sulphate Soil (PASS) and Bulk Emulsion Reaction in a South Africa Iron Ore Mine

    By Dirk Voogt, Quentin Steyl, D. Scott Scovira

    A South Africa iron ore mine reported a decline in blast performance and ore and waste fragmentation. Preliminary investigation by the explosives services company found that the straight gassed bulk e

    Feb 6, 2023

  • ISEE
    Reducing Impact on the Wall Generated by Blasting and Increasing Slope Design Adherence Using Controlled-Energy Explosives and Presplitting Technique

    By Orica Chile, Orica Brasil, Orica Brasil Victor Morais, Kinross Paracatu Leopoldo Muñoz, Kinross Paracatu Luis Marinho, Gubio Barsottini, Orica Brasil José Vergara, Lucas Steffen, Orica Brasil Washington Vilas

    In drill and blast activities, it has been a challenge to sculpt walls accordingly to what has been designed in state-of-art mining design software. Obviously, the perfection of making neat and smooth

    Feb 6, 2023

  • ISEE
    Measurement of the Vibration Delay Window for an Iron-Ore Mine

    By Maria Sullivan

    There have been many papers and articles presented over the last 60 years questioning the relevance of the 8-millisecond blasting delay window as an ‘Industry rule of thumb’. The concept of using dela

    Feb 6, 2023

  • ISEE
    Christmas Day 2020 VBIED Blast Investigation Findings and Damage Assessment of Nearby Historic Buildings in Nashville, Tennessee, USA

    By J. Mikhael Erekson, Connie Campbell Brashear, Brent Meins

    Christmas morning 2020, an IED in an RV was detonated along an evacuated section of downtown Nashville, Tennessee. The blast damaged over 40 buildings, including AT&T’s Main Central Office and caused

    Feb 6, 2023

  • ISEE
    Controlled the Blasting Performance with Electronic Detonator near High Voltage Tower (SUTET) using Signature Hole and Scale Distance Regression Analysis (A Case Study: Coal Mining in Indonesia)

    By Raden Haris Handayana, Jihan Farhan Lubis, Milia Putri, Tengku Deli Hamonangan Hasibuan, Sani Salahudin

    An environmental issue that must be controlled from coal overburden blasting near the structure is ground vibration. Damaging ground vibration is the effect exerted from residual energy from blasting

    Feb 6, 2023

  • ISEE
    Driving Continuous Improvement Through Blast Design Technologies in a Surface Quarry

    By Toby Forney, Joshua Schoonover

    In typical surface quarry operations, productivity and efficiency related to pit development begin with drilling and blasting efforts. By embedding technology within drilling and blasting operations,

    Feb 6, 2023

  • ISEE
    Prediction of Fines in Mining and Quarrying Applications Using the Fracture Density Model (FDM)

    By C. Mick Lownds, Dale S. Preece, Ali Bhuiyan

    FDM (Fracture Density Model) is a three-dimensional mechanistic model of blast induced rock fragmentation. FDM uses several computational mechanics algorithms to simulate the effect of blasting in dif

    Feb 6, 2023

  • ISEE
    Case Study: Blasting with Air Decks to Maintain Performance While Saving Costs

    By Brian Lewis, Reinhold Daykin Schnell

    Blasting is the primary and most effective method for breaking and moving material at most mine sites. The blast design is often adjusted in efforts to optimize the effectiveness of the blasts’ explos

    Feb 6, 2023