Search Documents

Sort by

  • AUSIMM
    Laboratory Experiments to Quantify the Pull-Out Strength of Single Strand Cable Bolts for Large Boreholes

    In high stress mining environments, production drill rigs are often employed for rapid drilling of boreholes for systematic cable bolting. One outcome of this drilling method is the need for larger bo

    Nov 25, 2010

  • AUSIMM
    Stope Performance in Challenging Ground Conditions: Observed Versus Predicted - A Case Study

    Throughout the study phases (scoping, prefeasibility and feasibility) of new mining projects one is forced to work with and make predictions based upon limited date obtained from diamond and reverse c

    Nov 25, 2010

  • AUSIMM
    Proactive Strata Control Management at Anglo American Metallurgical Coal Australian Open Cut Operations

    Anglo American Metallurgical Coal (AAMC) manages five open cut coal mines in Queensland and New South Wales, producing approximately 30 million tonnes per annum. The size and complexity of these mines

    Nov 25, 2010

  • AUSIMM
    Rock Fall Protection Barrier at Mill Area of PT Freeport Indonesia - ABSTRACT ONLY

    The mill area of PT Freeport Indonesia is located in a valley surrounded by steep natural slope, characterised by extreme topography with mountains rising to above 4500 m within 100 km from the seasho

    Nov 25, 2010

  • AUSIMM
    Successful Raiseboring in Poor Ground Conditions, Kencana Mine, Indonesia

    Ground conditions at the Kencana mine, Indonesia, are generally poor and an underhand cut and fill mining method is used for extraction. Due to these poor ground conditions, all vertical development h

    Nov 25, 2010

  • AUSIMM
    Life of Coal Pillars and Design Considerations

    Following the Coalbrook Colliery disaster in 1960, Salamon and Munro (1967) established the well known empirical coal pillar strength formula in South Africa. This formula has prevented further violen

    Nov 25, 2010

  • AUSIMM
    Managing Stress and Ground Condition Changes with Increasing Depth at Callie Underground Mine

    The Callie Underground Gold Mine (Callie) is owned by Newmont Asia Pacific and located 531 km north-west of Alice Springs in the Northern Territory. Historically, stopes have been mined util

    Nov 25, 2010

  • AUSIMM
    Changing the Ground Support in Cemented Hydraulic Backfill at CSA Mine

    CSA mine, which is a deep level copper operation, located 12 km north of Cobar, NSW, currently uses a top down stoping method, utilising cemented hydraulic backfill (CHF) to fill and stabilise the sto

    Nov 25, 2010

  • AUSIMM
    Managing the Closure and Reopening of the South Ramp at Telfer Gold Mine During Sublevel Cave Breakthrough into the Open Pit

    The Newcrest Mining Limited Telfer Gold Mine consists of an underground sublevel cave (SLC) operation located 734 m directly below active open pit operations. Open pit and underground current producti

    Nov 25, 2010

  • AUSIMM
    Development of a Corrosivity Classification for Weld Mesh Support at Cannington Mine

    Cannington Mine is an underground, hard rock, metalliferous mine located in North-Western Queensland, Australia. Weld mesh is installed to prevent the failure of rock from between the installed reinfo

    Nov 25, 2010

  • AUSIMM
    Analysing and Rehabilitating Rock Mass Failure in Critical Mine Infrastructure

    To optimise the haulage of the large tonnages produced from stopes in this high production gold mine, an ore pass and feeder system was introduced. This ore pass was designed and developed in 2006 and

    Nov 25, 2010

  • AUSIMM
    Numerical Modelling of Confinement Effects on Mechanical Properties and Failure Pattern of Brittle Rocks in Triaxial Tests with PFC3D

    One of the most important goals of the experiments is to determine deformation and strength of the rock specimen under applying triaxial load, the status of failure condition is one of the subjects wh

    Nov 25, 2010

  • AUSIMM
    Pillar Design in Hard Rock Mines - Can we do this with Confidence?

    This paper gives an overview of the difficulties associated with determining the strength of hard rock pillars. Although a number of pillar design tools are available, pillar collapses still occur. Re

    Nov 25, 2010

  • AUSIMM
    Latest Technologies in Optical Measurements for Geotechnical Instrumentation

    Optical sensors have emerged during the telecom boom in the late 1900s, due to the availability to low-cost telecom-grade optical components. It's only after the telecom industry's fall in 2

    Nov 25, 2010

  • AUSIMM
    Numerical Analysis of Extreme Deformation and Ground Support Performance at the N3500 Project

    The N3500 orebody is the northern continuation of the 3500 orebody at Xstrata Copper's Enterprise Mine and occurs at a depth of 1.3 to 1.8 km. At the nearby S3500 orebody, extreme deformation was

    Nov 25, 2010

  • AUSIMM
    The Geotechnical Input into the Mining Process at George Fisher South Mine

    Geotechnical input is interwoven into the mining process at George Fisher South Mine from the planning and design of working areas to the closure of worked out areas and maintenance of life of mine an

    Nov 25, 2010

  • AUSIMM
    Optimising Geotechnical Logging to Accurately Represent the Geotechnical Environment

    Typically, large volumes of data are collected during geotechnical investigations for mining projects but rarely is this done in a comprehensive manner that enables all aspects of the geotechnical env

    Nov 25, 2010

  • AUSIMM
    Recent Secondary Extraction Experience at Cook Colliery in a Multi-Seam Environment

    Cook Colliery currently mines in the Argo Seam, beneath old workings in an overlying seam. The Argo seam is up to 4.8 m thick and a continuous haulage system behind an ABM25 is used to develop first w

    Nov 25, 2010

  • AUSIMM
    Design of Air-Blast Plugs for a Sublevel Caving Operation

    The Telfer Underground sublevel cave (SLC) Operation is located approximately 850 m below surface. The cave was designed to propagate through an old decline which was initially used to monitor the cav

    Nov 25, 2010

  • AUSIMM
    Pillar Design Procedures and Research Methodologies - Can There or Should There be a Unified Approach?

    After some 50 years of worldwide research in relation to coal pillar mechanics and design as well as numerous workshops and technical papers related to these issues there is still some significant dis

    Nov 25, 2010