Search Documents

Sort by

  • AUSIMM
    Steel and Iron Ore Scenario - An Indian Perspective

    India is on fast economic growth. Even in the turbulent years of global crisis, it could achieve a growth of over eight per cent. In recent past, Indian Government has been contemplating a faster grow

    Dec 6, 2010

  • AUSIMM
    Mass Mining using Room and Pillar Methods at Estonia Oil Shale Mine

    The Estonia Mine, operated by Eesti Energia Kaevandused AS (EEK), the mining division of the Estonian Government's energy company, Eesti Energia AS, is a large room and pillar mine located in Eas

    Dec 6, 2010

  • AUSIMM
    Mining Environmental Impacts Evaluation in a Karstic Zone using Geographical Information Systems

    Analysis of different environmental scenarios and to represent, spatially, of impacted areas is possible by the use of geoprocessing techniques, specifically Systems of Geographical Information (SIG).

    Dec 6, 2010

  • AUSIMM
    Developing Algorithms and a Computer Program to Predict the Peak Particle Velocity After Blasting in Open Pit Mines and Quarries

    Drill blasting is a widely used method for rock fragmentation in mining, quarrying and construction industries. Environmental effects such as air shocks, dust, flying rocks and ground vibration are un

    Dec 6, 2010

  • AUSIMM
    Open Pit Production Scheduling Optimisation - Why the Mining Industry Needs a New Phase Design Approach

    The long-term production schedule of open pit mines that maximises the net present value (NPV) of a given project relies on the proper design of phases (pushbacks) within the ultimate pit limits. Ther

    Dec 6, 2010

  • AUSIMM
    Adaptation of Hydraulic Shovels for Arctic Temperature of Yakutia Region

    Hydraulic mining shovels can be successively used at open-pit mining operation in severe climatic zone with air temperature interval from -700C to +450C typical for some northern region of the world p

    Dec 6, 2010

  • AUSIMM
    Planning the Kotre Basantpur-Pachmo Coking Coal Mine

    The contiguous Kotre Basantpur and Pachmo (KBP) coal blocks in the Hazaribagh District of Jharkhand State in east India are being developed by Tata Steel Limited (Tata Steel) to supply coking coal to

    Dec 6, 2010

  • AUSIMM
    Study on Utilisation of Flyash for Barrier Layer/Buffer Materials for Radioactive Waste Disposal

    About 15 per cent of total electricity (400 MkW) was generated by nuclear power plants in the world (2009) and about 36 000 tons of uranium has been mined in uranium mines annually. Radioactive waste

    Dec 6, 2010

  • AUSIMM
    A New Effective Labour-Planning Model for Mines

    The mining industry is the largest source of foreign income for South Africa. It is also the main source of employment in the country and, as an industry; it is also one of the largest. Due to the lab

    Dec 6, 2010

  • AUSIMM
    Energy Conservation in the Indian Mining Industry - An Overview

    The last one decade in India had witnessed phenomenal growth in the coal, lignite, iron ore, limestone and many other minerals. To meet the production of minerals, the energy requirement is also very

    Dec 6, 2010

  • AUSIMM
    Optimisation Challenges in Underground Mine Planning and Design

    Underground mine planning is characterised by a series of designs, starting with prefeasibility and culminating in operational. Information on the mineralisation and geotechnical conditions is availab

    Dec 6, 2010

  • AUSIMM
    Case Study - The Mogiana Quarry Reclamation

    This article presents a proposal for the rehabilitation of the mined area of the Mogiana quarry. The Mogiana quarry produces material used in civil construction and is situated in the Brazilian State

    Dec 6, 2010

  • AUSIMM
    Infrared Imager as a Tool for Monitoring of Power Shovels, Gearcase Bearings and Electric Motors

    Thermal method of diagnostic as a nondestructive monitoring is based on data logging of infrared radiation from heated surface or from the associated thermal field. Monitoring of gearcases and motors

    Dec 6, 2010

  • AUSIMM
    Investigating the Sensitivity of Different Estimation Techniques over Block Dimensions

    It cannot be said that accurate and reliable ore reserve estimation is the fundamental of any mining operation success. Estimation techniques which are used to estimate the grade distribution of an or

    Dec 6, 2010

  • AUSIMM
    Application of Genetic Algorithms for Reliability Assessment of Two Mine Hoisting Systems

    This paper discusses the application of a computerised model based on genetic algorithms (GAs), called GenRel, for reliability assessment of underground mine hoisting systems. The purpose of this pape

    Dec 6, 2010

  • AUSIMM
    Performance Evaluation of Machinery used in Dimensional Stone Mining and Processing

    Nowadays, technology has improved to extract dimensional stone blocks at quarry sites and also to process these at processing plants for making slabs and tiles. In the process of quarrying and process

    Dec 6, 2010

  • AUSIMM
    A Review of the Theory and Application of Multi-Criteria Decision Analysis Techniques in Mine Planning

    Mine planning includes equipment selection as a subprocess because aging equipment must be replaced to maintain or improve productivity levels. The criteria used for decision-making in mine planning a

    Dec 6, 2010

  • AUSIMM
    An Investigation to Integrate Optimum Long-Term Planning with Short Planning in Underground Mine Production Scheduling

    Generating short- and long-term mine production schedules in isolation and independently from each other means that only a local optimum can be achieved when each scheduling phase is carried out. The

    Dec 6, 2010

  • AUSIMM
    The Effect of the Australian Carbon Trading Scheme on a Large Scale Open Pit Mining Operation

    The mining industry continues to be a major driver of the Australian economy generating over A$130 billion in export earnings in 2008/2009. However, the industry has been cited as a significant contri

    Dec 6, 2010

  • AUSIMM
    Information and Methodical Base of Simulation Modelling of Excavator-Truck-Conveyor Complex Operation

    In this paper, the scientific bases of creation of simulation modelling systems of excavator-truck-conveyor complex work are represented. During the simulation modelling process of big mining and tran

    Dec 6, 2010