Search Documents

Sort by

  • AUSIMM
    Economics of Mine Planning and Equipment Selection

    This paper examines some of the fundamental economics of mining - in particular, for optimisation studies, for production rate determination and for reserve estimates.It includes introductory discussi

    Dec 6, 2010

  • AUSIMM
    Performance of the Coal Mine Openings and Pillars in Anisotropic Stress Field

    The stability of parallel underground coal mine galleries and pillars have been investigated using two- and three-dimensional (3D) numerical stress analysis. Anisotropic horizontal in situ stresses an

    Dec 6, 2010

  • AUSIMM
    Role of Physico-Mechanical Properties in Cutting Performance of Diamond Wire Saw in Marble Quarrying Operation

    Marble deposits of dolomitic variety are available in large quantities in India and for extracting these deposits diamond wire saw cutting machine is mainly used. Cutting performance of the diamond wi

    Dec 6, 2010

  • AUSIMM
    Path Planning and Position Control for Autonomous Loading Operation by Wheel Loader

    Authors have been conducting research on autonomous loading operation by wheel loader. Autonomous loading cycles has been demonstrated with real size experimental model. In V shape loading operation,

    Dec 6, 2010

  • AUSIMM
    The EMESRT Approach to Equipment Design - Bringing End Users into the Picture

    The Earth Moving Equipment Safety Round Table (EMESRT) was established by mining companies in 2006 to influence manufacturer's equipment design through a process of engagement. 2010 EMESRT member

    Dec 6, 2010

  • AUSIMM
    A Non-Linear Programming Model for Open Pit Mine Equipment Selection

    In mining industries, materials loading and handling costs represent a significant component of the total (capital and operation) costs. A variety of methods have been applied in surface mine equipmen

    Dec 6, 2010

  • AUSIMM
    The Application of Fuzzy Analytical Hierarchy Processing to Define Optimal Post Mining Land use for Pit Area to Recognise Reclamation Costs in Open Pit Mining

    Open pit mining has considerable damaging effects on the environment of the mining region. These harmful influences have to be controlled during mining operation until mine closure. Different sections

    Dec 6, 2010

  • AUSIMM
    Fundamental Study on Fracturing Grouting for Shaft Lining Reinforcement at Deep Alluvium Seam in Eastern China

    Many problems result when coal mine shafts are built in complicated geological conditions and serious shaft lining ruptures have often occurred in the eastern part of China since 1987. Grouting is app

    Dec 6, 2010

  • AUSIMM
    Ranking of Belt Conveyor Systems for Prefeasibility Study

    Prefeasibility planning and cost estimation of conveyor systems has historically been undertaken by comparing fi xed plant transport requirements to that of similar systems in service. This paper desc

    Dec 6, 2010

  • AUSIMM
    Equipment Selection - What is the Issue? What About the Application of Simulation Packages?

    The selection of the mining fleet can have as much of an effect on the efficiency and effectiveness of an operation as the mining method. This is not to say that inefficiencies are only attributable t

    Dec 6, 2010

  • AUSIMM
    Blast Vibration Monitoring and Elastic Wave Reflection Models to Assess Blast-Induced Damage to Mine Infrastructure - An Underground Case Study

    During underground mining, rock mass changes can occur as a function of the mining sequence and excavation processes. Mining-induced rock mass damage can occur due to redistribution of static stresses

    Dec 6, 2010

  • AUSIMM
    The Role of Cost Estimating in Mine Planning and Equipment Selection

    The objective of a mine planning exercise is to plan a safe mine that maximises net present value (NPV) for the project. Two primary elements are key to design of a mine plan optimised to maximise pro

    Dec 6, 2010

  • AUSIMM
    Fundamental Study of Acid Drainage Control using Flyash

    Japan is the largest coal importer in the world, importing from Australia, China, Indonesia, Canada, Vietnam, etc. In Indonesia, most of the produced coal is extracted from open cut mines. More open c

    Dec 6, 2010

  • AUSIMM
    Determination of Fracture Toughness of Anisotropic Rocks Under Water Vapour Pressure by Semi-Circular Bend Test

    Failure of rock materials is a process of crack propagation. Crack initiation takes place when the crack tip stress intensity K reaches a critical value called fracture toughness, K1C. The rock fractu

    Dec 6, 2010

  • AUSIMM
    Reopening and Production Planning of Kirdar - Yoncali Quarry, Turkey

    This paper presents a study about reopening of a quarry near to the geothermal region of Kntahya, Turkey. The production method was gallery blasting which resulted in very high ground vibrations. Ther

    Dec 6, 2010

  • AUSIMM
    Role of Ore Preparation During Chrysotile Manufacturing

    Principles of management in ore preparation before process of enrichment of chrysotile ores are discussed. The formulas, which were tested in industrial conditions, are offered, which may be used for

    Dec 6, 2010

  • AUSIMM
    A New Model to Improve Ore Grade Reconciliation Between the Exploration Model and the Mine

    The poor reconciliation between the values of estimated and actual grades can cause major economic losses to the mining industry. In a mining operation grade reconciliation is comparing the values of

    Dec 6, 2010

  • AUSIMM
    A Comparison of Rebar and Spiral Bolts using Laboratory Pull-Out Tests

    This study is to compare reinforcement of rebar and spiral bolts using laboratory pull-out test. For this purpose, the pull-out test was performed in laboratory for a curing period of 7- and 28-days.

    Dec 6, 2010

  • AUSIMM
    Hierarchical Clustering Algorithm for Block Aggregation in Open Pit Mines

    Open pit mine plans define the complex strategy of displacement of ore and waste over the mine life. Various mixed integer linear programming (MILP) formulations have been used for production scheduli

    Dec 6, 2010

  • AUSIMM
    Advances in Continuous Miner Automation

    This paper describes new research and development currently being undertaken by the CSIRO Mining Technology Group to advance the automation capability of continuous mining equipment in underground coa

    Dec 6, 2010