Search Documents

Sort by

  • SME
    The Next Great Chapter; Caterpillar Finalizes Purchase Of Bucyrus

    When Caterpillar announced that it had purchased Bucyrus for $8.8 billion, it was billed as the next great chapter in the history of mining. Surely, when the history books are written, it will be reme

    Jan 1, 2011

  • CIM
    Beneficiation of Concentrated Ultrafine Suspensions with a Falcon UF Concentrator (CIM Journal | Vol. 2, No. 4)

    By F. Bourgeois, J. -S. Kroll-Rabotin

    ABSTRACT: Falcon concentrators are enhanced gravity separators designed for concentrating fine particles. The Falcon UF model is unique in that it is dedicated to beneficiation of ultrafines, one key

    Jan 1, 2011

  • SME
    Assessing Small Underground Coal Mines For High Safety-Related Risk

    By H. Kinilakodi

    In 2008, the authors developed a methodology for assessing underground coal mines for high risk for major-hazard events. It focused on major hazard-related violations of safety standards associated wi

    Jan 1, 2011

  • SME
    Coal Review

    By William Watson

    Coal production in the United States in 2010 increased to a level of 960 Mt (1,085.3 million st), according to preliminary data from the U.S. Energy Information Administration (EIA), an increase of 1

    Jan 1, 2011

  • CIM
    Kinross Mine Planning Best Practice

    By C. Turek, R. Henderson

    Mine planning is the foundation of value for a mining company. Good mine planning requires solid understanding of the ore body, rigorous standards and processes, robust and useful information technolo

    Jan 1, 2011

  • CIM
    Advanced Integrated Process Modelling of Ni-Cu Sulphide Treatment at the Xstrata Nickel Sudbury Smelter

    By R. Pandher, R. Schonewille

    Advanced process modelling tools were developed for the Xstrata Nickel Sudbury Smelter flow sheet using a combination of FACTSAGETH METSIMTM and ARENATM software. These tools were employed to assist w

    Jan 1, 2011

  • SME
    Benchmarking Longwall Dust Control Technology And Practices

    By James P. Rider

    Significant advances in longwall mining technology and equipment have occurred over the last decade by the late 1990s, longwall mine output accounted for 40% of all underground output in the U.S. and

    Jan 1, 2011

  • IMMS
    Prospectivity Modeling Of Seafloor Massive Sulphide (SMS) Deposits In The Kermadec Arc And Colville Ridge Regions, New Zealand

    By C. Wildman

    Prospectivity modeling of seafloor massive sulphide (SMS) deposits has been completed over the Kermadec Arc-Colville Ridge area using the GIS based weights of evidence and fuzzy logic modeling techniq

    Jan 1, 2011

  • IMMS
    Pelagic Sediments Associated With Polymetallic Nodules In The Clarion Area Fracture Zone

    By Marlene Olivares Cruz

    The particles that make up the deep-sea sediments have two main sources: 1) those that are created in situ from dissolved components and 2) those that are washed into the ocean in solid phases from th

    Jan 1, 2011

  • TMS
    Preparation of Partially Stabilized Zirconia and Interface Structure Analysis

    By Shenghui Guo, Dongbo Li, Lijun Liu, Chengdong He, Jinhui Peng, Libo Zhang

    In present study, partially stabilized zirconia (PSZ) was prepared by CaO doped fused zirconia heated by microwave furnace at the temperature of 1450 oC and holding time of 120 min. The XRD results sh

    Jan 1, 2011

  • NIOSH
    OFR-194-84 Minerals Availability Commodity Directory on Cobalt

    By William L. Rice

    This Bureau of Mines Open Pile Report on cobalt is one of a series of minerals availability commodity deposit abstracts. Nonconfidential information from the Minerals Availability Program data base co

    Jan 1, 2011

  • DFI
    Monotonic And Cyclic Lateral Full-Scale Testing Of Reinforced Helical Pulldown Micropiles

    By M. Meckkey El Sharnouby

    In this paper, the results of full-scale field testing of reinforced helical pulldown micropiles (RG-HSP) installed in clayey till soils and resting on sandy soils are presented. Piles were tested und

    Jan 1, 2011

  • CIM
    Agnico-Eagle Laronde Plant: Metallurgical Challenges Present and Future

    By Jean Cayouette, Paul Blatter, Paul Cousin

    "The Laronde mill was commissioned in 1988 and has been treating the Laronde Penna ore since 2000. The Laronde plant, situated in the Abitibi region of Quebec, has experienced mill expansions to accom

    Jan 1, 2011

  • DFI
    FHWA Hollow Bar Soil Nail (HBSN) Test Program, A Summary

    By Jesús E. Gómez

    Verification and production testing of soil nails requires debonding the upper section of the soil nail to isolate the portion of the soil nail intended for testing within a specific ground type. In p

    Jan 1, 2011

  • IMMS
    Finding Inactive And Sub-Seafloor Massive Sulfide Deposits In Deep Ocean Floors

    By Fernando J. A. S. Barriga

    Exploration for active seafloor hydrothermal vent fields has been highly successful, and more than 300 such fields have been discovered to date. Some will most probably be mined, given their high meta

    Jan 1, 2011

  • IMMS
    High-Resolution Side-Scan Mapping Of Large Areas Of The Mid-Atlantic Ridge Using A Fleet Of Autonomous Underwater Vehicles (AUVs)

    By Sven Petersen

    In April 2010 three REMUS6000 series autonomous underwater vehicles (AUVs) have been used to simultaneously map large areas near the Mid-Atlantic Ridge (3°N) axis in water depths ranging from 1,000m t

    Jan 1, 2011

  • IMMS
    Hydrogenetic Fe-Mn Crusts From The Atlantic And Pacific Oceans: Geological Evolution And Conditions Of Formation (87b4258a-f4bd-41f2-89e2-6fee198dbc10)

    By Irina A. Pulyaeva

    Hydrogenetic Fe-Mn crusts are ubiquitous in the ocean basins and play an important role in marine mineral-deposit research because of their widespread occurrence and high concentrations of valuable an

    Jan 1, 2011

  • DFI
    The Aged Reloading Response Of Piles In Clay

    By Paul Doherty

    It is known that the axial capacity of a displacement piles installed in clay varies with time. Consolidation theory suggests that dissipation of porewater pressure set-up during pile installation wou

    Jan 1, 2011

  • IMMS
    The Developing Deep Sea Mining Systems

    By Hans Smit

    The face of mining as we know is changing as mining companies all over the globe realize the reality of accessing the vast mineral wealth contained on, and under, our ocean floors. With some land base

    Jan 1, 2011

  • IMMS
    Vertical Hydraulic Transport For Deep Sea Mining Applications - Introduction

    By Paul M. Vercruijsse

    Deep sea mining operations by nature are performed (or planned) in challenging environments. Another typifying characteristic of deep sea mining operations is the relatively high investment cost. This

    Jan 1, 2011