  • AUSIMM
    "Development of a Real-Time Adherence to Mine Plan Tools as Part of an Integrated Remote Mine Control Centre"

    By S D. Dessureault

    In one of North AmericaÆs largest mines, which contains more than six active coal-producing faces, mine controllers must meet the complex challenge of adhering to the mine plan while also ensuring cus

    Sep 26, 2011

  • AUSIMM
    Mill Modelling Using an Extensible Station-Based Framework

    By E A. Gunn, J Zhou

    In this paper a project to develop a joint optimisation/simulation model for production planning in a mine-mill complex is presented. The system involves a mill receiving ore from a number of differen

    Sep 26, 2011

  • AUSIMM
    Synthetic Rock Mass Modelling of a Rock Mass with Non-Persistent Joints

    By B K. Hebblewhite, G Sharrock

    The strength and deformation properties of a rock mass are important parameters influencing the design of civil and mining excavations or structures. The mechanical behaviour of jointed rock masses ar

    Sep 26, 2011

  • AUSIMM
    Four-Dimensional Network Relaxation Method for Long-Term Open Pit Mine Scheduling

    By J Yamatomi, Y Tamanishi, S Miwa

    The four-dimensional (4D) network relaxation method, originally developed by Akaike in 1999, uses Lagrange relaxation and is known for its ability to include the price change and possible better outpu

    Sep 26, 2011

  • AUSIMM
    Multi-Disciplinary Engineering Research and Development Skills for Mining û A Case Study

    By S Van Duin, I Porter

    This paper discusses how advanced manufacturing technology (AMT), which is fundamentally reliant on and developed via multi-disciplinary skills, has benefitted non-mining industries, and what lessons

    Sep 26, 2011

  • AUSIMM
    Application of Simulation Technology to the Design of Coal Clearance Systems

    Longwall mining operations have been in place in Australia since the early 1960s. This mining method is currently used to extract the bulk of coal obtained from underground mines in Australia (CSIRO,

    Sep 26, 2011

  • AUSIMM
    Visual Computing and Mine Design

    Visual computing opens the design process to a wider audience and allows rapid communication of mine plans to all stakeholders. The integration of software and hardware technologies that take advantag

    Sep 26, 2011

  • AUSIMM
    "Gravity Flow Under Moisture Conditions Control and Management of Drawpoint Mudflow"

    After many years of studying the rock mass gravitational flow phenomenon, it is well known that moisture conditions may change the mechanical properties of the caved and broken material, causing diffe

    Sep 26, 2011

  • AUSIMM
    Geological Domaining and Resource Estimation - A Discussion

    Interpreted geologic domains provide the geologic architecture of many current models used to estimate the potential economic resources in mineral deposits. The spatial extent of each domain is usuall

    Sep 26, 2011

  • AUSIMM
    A Multibody Simulation Solution to Analyse Attachment Kinematics of Hydraulic Excavators andáOther Linkages

    By M Dietrich

    The paper describes an efficient method for analysing the different attachment kinematics of excavators and other linkages by taking into account digging forces, the workspace and the stability of the

    Sep 26, 2011

  • AUSIMM
    Mining Network and the Security Question

    By A Huebner, A Noack

    Companies all over the world are very sensitive concerning their IT and network security. In most network connected technical installations and machines however, network security is not taken into acc

    Sep 26, 2011

  • AUSIMM
    Eight-Dimensional Planning Construction of an Integrated Model for Mine Planning Involving Constructability

    By E Rubio, N Morales

    A common practice in the mining industry is to decompose the planning process into different tasks, so the overall process and specific schedules can be constructed easily. Nevertheless, currently the

    Sep 26, 2011

  • AUSIMM
    Learning from Simulation at Boddington Gold Mine

    Various methods and software have been trialled for simulation of Au grades at Boddington Mine. This covers in-house and public software as well as sequential and turning bands methods. The diversity

    Sep 26, 2011

  • AUSIMM
    Multivariate Geostatistical Simulation via Joint Approximate Diagonalisation û A Case Study

    By J Ferreira

    To speed up multivariate geostatistical simulation it is common to transform the set of attributes into spatially uncorrelated factors that can be simulated independently. One decorrelation method is

    Sep 26, 2011

  • AUSIMM
    "Assessing Deformability of Siltstone Under Compressive Loading by Ultrasonic? Wave Propagation"

    By B Tutmez

    Determination of stress-strain behaviour of rocks plays a crucial role in understanding the response of rocks during loading. However, it is a tedious, expensive and a time-consuming process to obtain

    Sep 26, 2011

  • AUSIMM
    Robust Decision Making û Application to Mine Planning Under Price Uncertainty

    By F Grobler

    Many projects fail because project performance in unfavourable economic conditions was not anticipated at the investment decision stage. This type of failure may have been avoided through the selectio

    Sep 26, 2011

  • AUSIMM
    Prediction of Burden at the Sungun Copper Mine by Artificial Neural Network

    By H Khoshrou, A Siamaki

    Blast designs can have productive and non-productive impacts on downstream stages, mine productivity and operating costs. On the other hand, ground vibration, fragmentation, and back break caused by b

    Sep 26, 2011

  • AUSIMM
    Total Integrated System Simulation for Master Planning of the Dalrymple Bay Coal Chain

    By B Olsson, R Norman, M Volz

    Australia has seen unprecedented demand for coal exports in the last ten years and this demand is set to expand further still according to many analysts. This rapid increase in demand has placed press

    Sep 26, 2011

  • AUSIMM
    A New Approach to Flexible Open Pit Optimisation and Scheduling

    By A Galli

    Traditionally pit optimisation and scheduling is carried out assuming that the resources, the commodity prices and production costs are all known. Once the pit contour and the mining schedule have bee

    Sep 26, 2011

  • AUSIMM
    A New Metaheuristic Algorithm for Long-Term Open Pit Production Planning

    By C Niemann-Delius

    The problem of long-term open pit mine planning is a large combinatorial problem, which canÆt be solved easily by mathematical programming models because of the large problem size. In this paper a new

    Sep 26, 2011