Search Documents

Sort by

  • SAIMM
    Achievable Combustion Efficiency With Alstom CFB Boilers For Burning Discarded Coal - Synopsis (The Journal of The Southern African Institute of Mining and Metallurgy)

    By P. Gauvillé

    The key driver for choosing a circulating fluidized bed (CFB) boiler is the ability to burn a wide range of fuels with highly efficient combustion while meeting low emission requirements. Reduced sorb

    Jan 1, 2012

  • CIM
    Commissioning and Ramp Up of the HPGR Circuit at Newmont Boddington Gold (Newmont Boddington Gold’s Processing Facilities)

    By Brendan Parker, Tyron Rees, Steven Hart, Abba Manesh, Ian Mcgaffin

    "In September 2009, Newmont began the commissioning of a 3 stage crushing and milling circuit at its Boddington Gold Operation in Western Australia. The Boddington ore has been recognized as one of th

    Jan 1, 2012

  • CIM
    Bond is Back!

    By Mark Sherman

    "One of the main functions of a process technology and engineering services provider is to select grinding equipment that will meet the client’s throughput rate target. Prudent risk mitigation strateg

    Jan 1, 2012

  • SAIMM
    A Phased Development Schedule For A Platinum Concentrator Utilizing A Dynamic Stockpile Model

    By J. Labuschagne

    The primary factor contributing to the profitability of a platinum mine and its associated concentrator is the time taken from the first hoist of material from underground to the first batch of concen

    Jan 1, 2012

  • NIOSH
    Bureau Of Mines Mineral Investigations In The Juneau Mining District, Alaska, 1984-1988 - Volume 2.- Detailed Mine, Prospect, And Mineral Occurrence Descriptions - Section D - Juneau Gold Belt Subarea ? Introduction ? Location

    By Earl C. Redman

    The Juneau Gold Belt, centered on Juneau and approximately 120 miles long by 10 miles wide, stretches from Berners Bay on the north to Windham Bay on the south (fig. D-l). Access within the Juneau Gol

    Jan 1, 2012

  • SAIMM
    Case Study On Quantitative Risk Modelling To Obtain A Realistic Risk-Adjusted Project Valuation

    By G. R. Lane

    A large opencast gold mining company in Africa had just completed a feasibility study for the expansion of the operations. A traditional net present value project valuation methodology had been used t

    Jan 1, 2012

  • SAIMM
    Applications And Benefits Of 3D Laser Scanning For The Mining Industry

    By J. W. van der Merwe

    Technology is advancing at a rate that makes it extremely difficult for the mining Industry to keep pace. Many advances occur within a given piece of technology and often this is missed by the discip

    Jan 1, 2012

  • CIM
    A New Baffles System in SAG Mill Trommel at the Shahrebabak Copper Complex

    By M. Hekmati, M. R. Garmsiri, S. M. Hosseini

    "SAG/AG mills have been most common choice in grinding circuits last decades. In the most cases, at the discharge of SAG/AG mills, a trommel screen is used that is equipped with baffles to provide app

    Jan 1, 2012

  • CIM
    Effect of Core Diameter on the Bond Impact Crushing Work Index Test (Phillips Enterprises LLC, DJB Consultants, Inc, Alex G. Doll Consulting Ltd )

    By R. Phillips, A. G. Doll, D. J. Barratt

    "The Bond low energy impact (crushing) work index test is specified to be performed on rock specimens between 50 mm and 75 mm in effective diameter. NQ-diameter drill core, frequently used in mineral

    Jan 1, 2012

  • SAIMM
    Is Water Conservation And Water Demand Management A Real Option?

    By F. Botha

    South Africa is amongst the 40 driest counties in the world, with extreme weather conditions and beset by both droughts and floods. Coupled with economic growth is an increased demand on water resour

    Jan 1, 2012

  • SAIMM
    Interaction Of Graphite With Synthetic Matte

    By B. M. Thethwayo

    Graphite blocks are currently used in the concentrate - slag zone in primary PGM smelters, and can possibly be extended to the matte zone. This project evaluates the interaction between synthetic matt

    Jan 1, 2012

  • CIM
    Advances in Process Control of Sag Mills at Kennecott Utah Copper Copperton Concentrator (2012)

    By Jessica Hurst, Mark Holdsworth, Jeff McKay

    "In 2002, Kennecott Utah Copper Copperton Concentrator installed an Expert Control system for optimization of their SAG and Ball milling circuits. The advanced process control has been well received a

    Jan 1, 2012

  • SAIMM
    A Case Study Application Of Linear Programming And Simulation To Mine Planning ? Synopsis

    By J. A. de Carvalho Junior

    This paper analyses the impact of the uncertainty associated with the input parameters in a mine planning optimization model. A real example was considered to aid in the building of a mathematical mod

    Jan 1, 2012

  • CIM
    Carmen De Andacollo – Start-up of Teck’s New Copper Concentrator

    By L. Torres, C. S. R. Rondestvedt, M. Bustos

    In February 2010, Teck’s newest Concentrator at Mina Carmen de Andacollo (CDA), Andacollo, Chile was commissioned. The Concentrator is a single line configuration, comprising of one 36 ft diameter x 2

    Jan 1, 2012

  • CIM
    A Pilot-Scale Examination of a High Pressure Grinding Roll / Stirred Mill Comminution Circuit

    By J. A. Drozdiak, A. Bamber

    In this paper we examine, through pilot-scale testing, the possibility of operating a circuit comprised of two stages of HPGR comminution, followed by grinding through a horizontal stirred mill. In or

    Jan 1, 2012

  • CIM
    An Energy Based Approach to Quantifying the Response of AG/SAG Mills to Ore Blends

    Experimental determination of the response of an AG/SAG mill treating two components of significantly different impact resistance is challenging for two main reasons: firstly, small scale laboratory t

    Jan 1, 2012

  • AIME
    Dust Capture Performance Of A Water Exhaust Conditioner For Roof Bolting Machines (ME)

    By T. W. Beck

    Roof bolter occupations in underground coal mines continue to experience overexposure to respirable dust. One potential source of dust in roof bolting operations is the exhaust from the roof bolter du

    Jan 1, 2012

  • CIM
    Adapting Mill Control to Account for Liner Wear on the Cadia 40ft Mill

    By Hilden. M.

    "As the Cadia mill was the first 40ft diameter SAG mill, commissioned in 1998, its performance, liner and discharge design attracted considerable international attention. Twelve years on, the liner de

    Jan 1, 2012

  • CIM
    Ag Milling With and Without Pebbles Recycle - Effect on Multi-Component Ore Deportment and Throughput

    By D. Seke, E. Katsande, R. Khumalo, K. Seerane

    Palabora Mining Company (PMC) processes a multi-component ore body using a circuit consisting of two AG mills in parallel, closed with vibrating double deck screens and hydrocyclones. The bottom scree

    Jan 1, 2012

  • CIM
    A Review of 10 Years of AG/SAG Pilot Trials

    By M. Bueno

    Between 1993 and 2003, a series of AG and SAG mill pilot plant trials were conducted using Hardinge Ical pilot plant scale SAG mills on numerous ore samples and ranging across a wide variety of operat

    Jan 1, 2012