Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • TMS
    Arsenic Sludge Recycle at Caraíba Metais S.A.

    By D. C. Foguel, J. L. R. Bravo

    For several years, Caraiba Metais S.A. (CMSA) had to stock the arsenic sludge generated from the electrolyte purification process of its tankhouse. The amount stocked · reached approximately 3,500 ton

    Jan 1, 2000

  • TMS
    Arsenic Volatilization from Enargite Concentrate

    By R. Padilla

    A thermogravimetric study has been conducted to follow the decomposition and volatilization of arsenic from enargite concentrate in nitrogen and slightly oxidizing atmospheres. Temperature has a large

    Jan 1, 1997

  • TMS
    As-cast Microstructures of Aluminum Containing Ductile Cast Irons

    By A. R. Kiani-Rashid

    In this paper, the effect of aluminum content on the formation mechanism, volume fraction, morphology and particle size distribution of graphite has been investigated. Addition of aluminum on ductile

    Jan 1, 2010

  • TMS
    ASARCO 1982-92: A Decade of Metallurgical Change

    By M. G. King

    In 1982, Asarco operated six smelters and refineries producing primary copper, lead, zinc, silver and gold. At that time Asarco was still reliant on its custom smelting and refining roots and mined on

    Jan 1, 1993

  • TMS
    Aspects of Impurities Control at Caraiba Metais' Electrorefinery

    By José Luiz Rodrigues Bravo

    The production of electrolytic copper with assured quality corresponding to international standards, in a conventional electrorefkery of a custom smelter, is a hard and cautious task, if no advanced t

    Jan 1, 1997

  • TMS
    Aspects of Slag Optimisation in Smelting of Cu-Ni Sulphide Concentrates

    By A. A. Hejja

    The first part of this study deals with the importance of surface tension of slags produced in the smelting of sulphide concentrates. Theoretically the method of determining the surface tension of sla

    Jan 1, 1997

  • TMS
    Assessment Of Environmental Impact Of Rare Earth Metals Recycling From Used Magnets

    By Yuzo Hiroshige, Kiyotaka Tahara, Hiroki Hatayama, Masaharu Motoshita, Tomohiko Akahori

    Large amount of rare earth metals is stored in the used electric products. Hitachi has started to develop the environment-friendly process for rare earth metals recovery from used magnets. We report h

    Jan 1, 2014

  • TMS
    Assessment Of Gas-Metal-Slag Interaction In A Steel Making Ladle Through Physical And Mathematical Modelling

    By Filipe de Menezes Torres, Augusto Pereira de Sa, Itavahn Alves da Silva, Eliana Ferreira Rodrigues, Carlos Antonio da Silva, Varadarajan Seshadri

    Top slag eye opening which happens as a result of gas injection is a function of the gas flow rate in addition to other factors such as ladle geometry, porous plug location as well as slag properties.

    Jan 1, 2015

  • TMS
    Assessment of Ladle Slag as Binder Alternative for Cold Bonded Briquettes

    By Daniel Adolfsson, Ryan Robinson, Fenwei Su, Jelena Blagojevic

    "Cold bonded briquetting of steel plant by-products has proven to be a viable recycling alternative concerning technology, economy and environment in both the traditional blast furnace route and the d

    Jan 1, 2008

  • TMS
    Assessment of Lithium Pegmatite Ore Bodies to Determine Their Amenability to Processing for the Extraction of Lithium

    By G. Mark Aylmore

    Various processes have been developed using a combination of elevated temperature and chemical treatment processing to recover Li from silicate minerals. To facilitate further process development, a c

  • TMS
    Assessment Of Metallurgical Performance Of Kambara Reactor (KR) Through Physical Modeling

    By Varadajan Seshadri

    Kambara Reactor (KR) consists of a ladle where pig iron is stirred by an impeller during addition of a flux powder. The objective is to improve agitation leading to dispersion, of the flux powder, in

    Jan 1, 2006

  • TMS
    Assessment Of The Performance Of The Tundish Of A Six Strand Continuous Casting Unit Of Com pan hi a Siderurgica Belgo-Mineira (CSBM), Brazil Using Physical Modeling

    By Mônica Suede Santos Silva

    This work describes characterization of the performance of the tundish of a six strand continuous casting unit of the Companhia Siderurgica Belgo Mineira, Joao Monlevade, Brazil using physical modelin

    Jan 1, 2003

  • TMS
    Assessment Of The Performance Of The Tundish Of A Six Strand Continuous Casting Unit Of Companhia Siderurgica Belgo-Mineira (CSBM), Brazil Using Physical Modeling

    By Mônica Suede Santos Silva

    This work describes characterization of the performance of the tundish of a six strand continuous casting unit of the Companhia Siderúrgica Belgo Mineira, João Monlevade, Brazil using physical modelin

    Jan 1, 2003

  • TMS
    Assuring the Benefits of Aluminum Recycling: Engineering Economical Environmental Solutions to the Issues of Black Dross & Saltcake

    By John W. Pickens

    The recycling of industrial wastes and by-products is an important component of ecologically responsible industrial management. Converting waste streams into value-added products or material and energ

    Jan 1, 2000

  • TMS
    Asturiana De Zinc Expansion at the San Juan De Nieva Plant for a Zinc Production of 440,000 Tonnes per Year

    By F. San Martin, Y. Lefevre, F. Tamargo

    The San Juan de Nieva smelter was commissioned in 1960 with an electrolytic zinc capacity of 15,000 t/y. After a number of minor expansions, the capacity was increased to 320,000 t/y in 1991 and will

    Jan 1, 2000

  • TMS
    Asynchronous Parallel Potts Model for Simulation of Grain Growth

    By P. A. Manohar

    This paper describes an implementation of the Potts model for simulation of grain growth in 2D on a distributed-memory parallel architecture. The simulation scheme utilizes a continuous-time, asynchro

    Jan 1, 2003

  • TMS
    Atlantic Copper PS-Converters Environmental Improvements: A Continuous Commitment to the Future

    By Antonio Martin, Jesus Hurtado, Francisco Jimenez

    "Atlantic Copper is one of the largest copper producers in Europe. Its production facilities, including a primary copper smelter and an electrolytic refinery, are located in Huelva, on the southwest c

    Jan 1, 2012

  • TMS
    Atmospheric Chloride Leaching: The Way Forward For Nickel Laterites

    By Bryn Harris

    Chesbar Resources Inc.1 is developing a nickel-cobalt laterite project in Guatemala, Central America, by applying existing atmospheric chloride technology to a known resource. The tropical laterite p

    Jan 1, 2003

  • TMS
    Atmospheric Leaching of Laterites with Iron Precipitation as Goethite

    By Houyuan Liu

    A new process was developed to recover nickel and cobalt by leaching laterite ore at atmospheric pressure and.95"-105" C. The nickel-containing goethite in limonite was first leached with sulphuric ac

    Jan 1, 2004

  • TMS
    Atmospheric Leaching of Zinc Sulphide Concentrates using Regenerated Ferric Sulphate Solutions

    Most of the world's zinc metal is produced via the roast- leach-electrowinning (RLE) process. The process is well established, but most of the sulphur in the sphalerite concentrates reports in the aci

    Jan 1, 2000