Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • SME-ICGCM
    Ground Control of Longwall Top–Coal Caving Faces within Thick Coal Seams

    By Jinwang Zhang, Zhaohui Wang, Jiachen Wang

    "Thick coal seams (seam height larger than 3.5 m) account for a large portion of the proven coal reserves of China, and underground thick coal seam mining provides about 50% of the Chinese annual coal

    Jan 1, 2017

  • SME-ICGCM
    Rockbolting For Highly Stressed Roadways

    By Holger Witthaus

    The conditions of great mining depth and multi-seam¬longwalling require a special method of rockbolting, It can be described as a control loop which is based on the elements of planning, drivage and m

    Jan 1, 2000

  • SME-ICGCM
    Application of geotechnical and geophysical parameters to improve planning reliability in roadway drivage

    By Nikolaos Polysos

    To drive and utilise gate roads economically requires accurate planning and risk assessment considering the variable geomechanical requirements. The geomechanical part of roadway planning is secure

    Jan 1, 2002

  • SME-ICGCM
    Use of a Laser Grid System for Accurate Roof Bolt Location

    By William Kendall

    "A tremendous amount of research, analysis, and engineering time is used to design a proper roof support system including the type, length, and location of the roof bolts. Unfortunately, since the roo

    Jan 1, 2016

  • SME-ICGCM
    Recent Advances in Numerical Simulation of Cutter Roof Failure in Underground Coal Mines

    By Murali Gadde

    Numerical simulation of cutter roof failure is a daunting coal mine excavation design issue. The complex progressive failure mechanisms associated with cutter failures are extremely difficult to repli

    Jan 1, 2005

  • SME-ICGCM
    Constraint Is The Prime Variable In Pillar Strength

    By Clarence O. Babcock

    Since Vicat in 1833, the width to height ratio of a mine pillar has been taken as the fundamental variable in pillar design. From work in the laboratory by many investigators testing rock, Coal and co

    Jan 1, 1984

  • SME-ICGCM
    Catastrophic Failures of Underground Evaporite Mines

    By Jeff Whyatt

    Deformation of underground salt, trona and potash mines is generally time dependent, providing for gradual adjustment of strata to mining induced stresses. Time dependence can allow for higher extract

    Jan 1, 2008

  • SME-ICGCM
    A Study on Geotechnical Risks in Interaction Between Open-Pit and Block Caving

    By Ezzeddin Bakhtavar

    There are several geotechnical challenges and risks inherent in the interaction between the open-pit and block cave mining environments. This is especially true when they have to work simultaneously f

    Jan 1, 2011

  • SME-ICGCM
    Stable Entry Design In A Multi-Seam Environment

    The challenge of planning to minimize interaction effects in multi-seam mining is compounded by the difficulties inherent in extrapolating essential geological and spatial data between sampling points

    Jan 1, 1994

  • SME-ICGCM
    Mapping Hazards With Microseismic Technology To Anticipate Roof Falls - A Case Study (ac4523c6-7bdb-4660-a1cb-20433a65c0ed)

    By Anthony Iannacchione

    As the amount of new fractured surfaces or "damaged rock layers" within roof rock increases, the stability of the rock mass decreases. While direct measurements of this phenomenon are not easily made,

    Jan 1, 2004

  • SME-ICGCM
    Seismic Events In German Hard Coal Mining (927aed19-540f-49d6-8a7e-8eb1cd5cfc71)

    By Axel Preusse

    Underground coal mining can cause seismic events. There is currently no way to predict such phenomena reliably, in particular stronger events. That is why, according to the current state of the art, e

    Jan 1, 2009

  • SME-ICGCM
    Understanding the Connection between Blasting and Highwall Stability

    By R. Quentin Eades, Kyle Perry

    "Surface mines continue to implement highwalls for several reasons, such as increasing recovery, improving margins, and justifying higher stripping ratios. Highwall stability is a complex issue that i

    Jan 1, 2018

  • SME-ICGCM
    UK Experience and Numerical Modelling for Planning and Supporting Deep Longwall Over-Mining Operations

    By Bowler Jonathan, Lorraine Kent, Tereza Crisu, Stuart Walker, Nicholas Lightfoot

    "It has been the practice in Europe to extract the most economic seams first: taking the seams sequentially, top down, to avoid operating within the fractured strata formed by the subsidence trough ab

    Jan 1, 2016

  • SME-ICGCM
    Application of Electrohydrodynamic Method and High-Pressure Water Jets as Non-Blasting Alternative of Rock Breaking and Splitting in Open Pits

    By Krzysztof Kotwica

    The steady demand for rock materials leads not only to on increase in mining but to the need for decreasing the loss of material in the process of exploitation as well. It brings about an increase in

    Jan 1, 2006

  • SME-ICGCM
    The Importance of Underground Stone Mine Roof Geology

    By Frank Kendorski

    Several startup or longtime underground stone mines have experienced unanticipated roof control difficulties due to the variable geologic character of the roof strata. Careful mapping of roof conditio

    Jan 1, 2002

  • SME-ICGCM
    How To Cope With Cutter Roof Problem (e6639bdb-2d11-4a70-a3df-8a3a479f7b3e)

    By A. Wahab Khair

    This paper presents results of the experiments carried out in Beth Energy No. 33 Mine for the purpose of alleviating problems associated with cutter roof. Cutter roof problems have delayed the advance

    Jan 1, 1992

  • SME-ICGCM
    Caving, Seismicity, and Mine Design in Four Utah Mines

    By Hamid Maleki

    Having developed a methodology for estimating mining-induced seismicity resulting from slip along geological discontinuities in 2003, in this paper, the importance of measurements are high-lighted in

    Jan 1, 2006

  • SME-ICGCM
    Application of Updated Joint Detection Algorithm for the Analysis of Drilling Parameters of Roof Bolters in Multiple Joints Conditions

    By Jamal Rostami, Asok Ray, Samer S. Saab Jr., Wenpeng Liu

    Ground instability, such as roof or rib failures, is one of the most serious and frequent safety hazards that occur in underground mining, tunneling, and underground construction. The ground-related p

    Jan 1, 2017

  • SME-ICGCM
    Volumetric Measurement of Rock Movement Using Photogrammetry

    By Stephen R. Iverson, Jeffrey C. Johnson, Donovan J. Benton, Michael J. Raffaldi, Lewis A. Martin

    "The NIOSH ground control safety research program at Spokane, Washington, is exploring applications of photogrammetry to rock mass and support monitoring. This paper describes two ways photogrammetric

    Jan 1, 2015

  • SME-ICGCM
    Surface Subsidence. in Longwall Mining--A Case Stud

    By R. D. Yancich

    A case study of longwall mining surface subsidence was performed at a mine in Southwestern Pennsylvania. The mine operated in the Pittsburgh coal seam which averaged 70-72 inches with 6-8 inches draw

    Jan 1, 1984