Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • SME-ICGCM
    Longwall Production, Maintenance, And Roof Control System

    By W. Mark Hart

    The current Automatic Data Acquisition system developed by some support manufacturers make it possible to monitor and record changes in leg pressure, DA RAM stroke in every shield and shearer position

    Jan 1, 1994

  • SME-ICGCM
    Evaluating Roof Control In Underground Coal Mines With The Coal Mine Roof Rating

    The U.S. Bureau of Mines (USBM) has developed the coal Mine Roof Rating (CMRR) to aid in ground control. This paper describes the application of the CMRR at four coal mines operated by a major U.S. co

    Jan 1, 1994

  • SME-ICGCM
    Hydrogeologic Effects Of Subsidence At A Longwall Mine In The Pittsburgh Coal Seam

    By Leslie Carver

    The effects of longwall mine subsidence on water resources were studied at a West Virginia coal mine (mine Z) by Carver (1994). Data were obtained for 137 domestic supply wells and springs and 12 base

    Jan 1, 1994

  • SME-ICGCM
    Evaluation Of Support Performance In A Highly Stressed Mine

    By Hamid Maleki

    The U.S. Bureau of Mines implemented a monitoring program in a western U.S. coal mine for the evaluation of both conventional and alternative support systems. The conventional support consisted of 2.5

    Jan 1, 1994

  • SME-ICGCM
    Roof Pressure Monitoring Using The Integrated Longwalt Automation System By WESTFALIA

    By Ulrich Paschedag

    The WESTFALIA group of companies developer and manufactures underground mining machinery for complete high-performance longwalls. WESTFALIA uses a state of the art electrohydraulic system as the most

    Jan 1, 1994

  • SME-ICGCM
    Roofbolting In The Cape Breton Development Corporation's Phalen Colliery

    By B. Macdonald

    In 1991, roofbolts were introduced as a primary support for inseam retreat longwall entries at CBDC's Phalen Colliery. Increasing mine depth (+550 m) necessitated replacing conventional inseam st

    Jan 1, 1994

  • SME-ICGCM
    Ground Control And Safety Considerations During Longwall Recovery

    By William J. Gray

    The Roof Control Division of MSHA's Pittsburgh Safety and Health Technology Center has been conducting a program to evaluate methods employed by the U.S. coal mining industry during recovery of l

    Jan 1, 1993

  • SME-ICGCM
    A New Method For Longwall Pillar Design

    By P. Tsang

    In order to deal with ground control problems such as roof falls, floor heaves and pillar failures in underground coal mines, a new pillar design method based on the "yield pillar" concept is proposed

    Jan 1, 1993

  • SME-ICGCM
    Investigation Of Blast Damage And Underground Stability

    By S. Paul Singh

    The implications of blast damage are harmful in both economic and physical sense. To understand the mysterious nature of blast damage assessment and prediction, field work was done by driving an exper

    Jan 1, 1993

  • SME-ICGCM
    Economic Evaluation Of Subsidence Damage Mitigation Techniques

    By David C. Johnson

    Coal mining in Illinois has resulted in many structures being exposed to subsidence damage. Damage mitigation techniques (DMT) applied in the foundation design/construction have proven successful in m

    Jan 1, 1993

  • SME-ICGCM
    Entry Design For Optimum Stability In A Multi-Seam Environment

    By Mohummad Akram

    Statistical analysis of multi-seam mining case studies demonstrated that geologic structure and lithological type and sequencing were predominant factors in entry failures. Finite element analysis was

    Jan 1, 1993

  • SME-ICGCM
    Utilization Of Polymer Grid Structures In Shield Recovery Operations

    By Brian E. Travis

    Recent Developments in the utilization of polymer grid structures for Longwall Shield Recovery operations are discussed. Specifically: various Longwall screen designs and the numerous methods employed

    Jan 1, 1993

  • SME-ICGCM
    A Test Of Predictive Numerical Models To Simulate Entry Design Changes Using Field Measurements From A Longwall Mining Gateroad

    By Jennifer Riefenberg

    Research efforts by the U.S. Bureau of Mines include running a series of displacement-discontinuity, boundary-element models to simulate the gateroad design at an underground coal mine in northwestern

    Jan 1, 1993

  • SME-ICGCM
    The Design And Application Of Hercules Cribs For Underground Mining

    By Mike Faure

    Hercules cribs make use of timber loaded parallel and perpendicular to the grain. Maximum use is made of the orthotropic properties of timber resulting in crib- having superior strength, high initial

    Jan 1, 1993

  • SME-ICGCM
    An Integrated Approach To Subsidence Modelling And Prediction In The Collie Coal Basin (Western Australia)

    By Ian Misich

    A research programme has been undertaken to evaluate and predict the effect of total extraction of coal by underground methods on the superimposed strata, aquifer systems and ground surface in the Col

    Jan 1, 1993

  • SME-ICGCM
    Surface Fracture Development From Mine Subsidence In Eastern Kentucky

    By Clyde DeRossett

    Surface fractures, sometimes of significant size, are observed in eastern Kentucky over high extraction areas. Field observations were correlated with mine maps and a regional subsidence prediction co

    Jan 1, 1993

  • SME-ICGCM
    Material Instability Hazards In Mine Processing Operations

    By John W. Fredland

    Many accidents occur in the mining industry as a result of the instability of material during handling and processing operations. Accidents due to dump point instability at stockpiles, and at spoil or

    Jan 1, 1993

  • SME-ICGCM
    The Use Of Foamed Cement Cribs At American Electric Power Fuel Supply Meigs Division

    By Michael Amick

    Due to the importance of maintaining open airways on a longwall panel, mine management decided to install cribs made of foamed cement. Foamed cement had been used at other company operations on severa

    Jan 1, 1993

  • SME-ICGCM
    Characterization Of Structural Integrity And Stress State Via Seismic Methods: A Case Study

    By Erik C. Westman

    The objective of this Bureau of Mines study is to determine the structural integrity and stress state of coal structure using seismic techniques. Bureau personnel conducted seismic transmission and re

    Jan 1, 1993

  • SME-ICGCM
    Application Of Seismic Tomography For Assessing Yield Pillar Stress Conditions

    By Michael J. Friedel

    The fundamental problems associated with ground control reflect the inability of mining personnel to "see" the development of anomalous conditions. Toward this end, the U. S. Bureau of Mines is invest

    Jan 1, 1993