Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • SME-ICGCM
    Design Of Multi-Level Thick Seam Extractions Under Major Aquifers And Considering Spontaneous Combustion Risk

    By D. J. Reddish

    An understanding of the mechanisms that cause large seismic events in a deep mine provides a foundation for designing effective measures to reduce the incidence of these events, as well as reduce the

    Jan 1, 1996

  • SME-ICGCM
    The Effect Of Gas Pressure On Coal Strength

    By Najdat I. Aziz

    There are different schools of thoughts about the influence of gas pressure on coal strength. Researchers have reached contradictory results with regard to the effect of confining gas pressure on tens

    Jan 1, 1996

  • SME-ICGCM
    Monitoring Roof Beam Lateral Displacement At The Waste Isolation Pilot Plant

    By L. J. Terrill

    Lateral displacement in the immediate roof beam at the Waste Isolation Pilot Plant (WIPP) is a significant factor in assessment of excavation performance for the design of ground control systems. Info

    Jan 1, 1996

  • SME-ICGCM
    Innovation In Control Of Geomechanical State Of Undermined Rock Mass And Deformations Of Earth Surface

    By F. N. Voskoboyev

    The suggested new method for control of geomechanical state of undermined rock mass ensures, as a safety measure for the earth surface protection, the decrease of deformations by 2,5 - 10 times in min

    Jan 1, 1996

  • SME-ICGCM
    Fortrac® Geogrids For Mine Roof Control

    By Ray Brandon

    The recent introduction of polymer geogrids for ground control purposes in underground mines allows mine operators more flexibility in choosing improved products for several applications. This is evid

    Jan 1, 1996

  • SME-ICGCM
    Using Ground Penetrating Radar For Roof Hazard Detection In Underground Mines

    By G. M. Molinda

    Ground Penetrating Radar (GPR) is being investigated for the potential to determine roof hazards in underground mines. GPR surveys were conducted at four field sites with accompanying ground truth in

    Jan 1, 1996

  • SME-ICGCM
    Seismic Tomography For Longwall Stress Analysis

    By E. C. Westman

    Anomalous geologic or stress-induced conditions can create a hazardous working environment for underground miners. Seismic attenuation tomography provides a valuable tool for understanding static and

    Jan 1, 1996

  • SME-ICGCM
    Estimation Of Long-Term Stability Of Mine Pillars In Underground Pit

    By S. Yamashita

    Recently in Japan, unexpected degradation (surface subsidence) at old underground quarry sites, such as 'Ohya-Ishi' (pumice tuff) pit field has often been occurred. At these quarry sites, th

    Jan 1, 1996

  • SME-ICGCM
    Design Methods To Control Violent Pillar Failures In Room-And-Pillar Mines (V. S. Bureau of Mines)

    By R. Karl Zipf

    The sudden, violent collapse of large areas of room-and-pillar mines poses a special hazard to miners and mine operators. This type of failure, termed a "Cascading Pillar Failure" (CPF), occurs when o

    Jan 1, 1996

  • SME-ICGCM
    Chemical Consolidation For Roadway Surrounding Rock - It's Theory And Applications

    By Jinhua Wang

    Based on engineering examples and theoretical analysis, the mechanism of chemical consolidation for fractured roadway surrounding rock was discussed. The chemical consolidating materials and three con

    Jan 1, 1996

  • SME-ICGCM
    Highwall Control At Homestake's Open Cut Mine

    By Don Berger

    Highwall scaling, bolting and technical blasting are important aspects in the remediation of existing highwall exposures. Proper planning, design and research are important first steps in the developm

    Jan 1, 1996

  • SME-ICGCM
    Improved Intersection Design And Monitoring In The Sydney Coalfield

    By G. R. Corbett

    The introduction of roof bolts to Phalen Colliery in the Sydney Coalfield, Nova Scotia (annual output of 2Mt) has been successfully implemented in maingate and tailgate entries over the last four year

    Jan 1, 1995

  • SME-ICGCM
    Monitoring Mobile Roof Supports

    By Kenneth E. Hay

    Researchers from the U.S. Bureau of Mines conducted a field study to assess the safety of remotely controlled mobile roof supports (MRS) in a retreat pillar mining operation, Data were collected to pr

    Jan 1, 1995

  • SME-ICGCM
    Analysis Of Rockbolt Performance At The Waste Isolation Pilot Plant

    By Liane J. Terrill

    Rockbolt failures at the Waste Isolation Pilot Plant have been recorded since 1990 and are categorized in terms of mode of failure. The failures are evaluated in terms of physical location of installa

    Jan 1, 1995

  • SME-ICGCM
    Vertical Stress Redistribution Around A Retreating Longwall Face End

    By D. A. Payne

    Large excavations, such as Iongwall panels, result in extensive vertical stress redistribution in the surrounding strata. The large abutment stresses developed may produce damage to pre-existing or pl

    Jan 1, 1995

  • SME-ICGCM
    Roof Support Performance In High Stress Conditions

    By Thomas P. Mucho

    To document the performance of mine roof and roof support systems the U.S. Bureau of Mines (IJSBM) has been installing instrumentation at selected sites in U.S. coal mines. Much of this support and ro

    Jan 1, 1995

  • SME-ICGCM
    Multiseam Mining On South African Collieries

    By R. W. Hill

    Multiseam mining has been carried out at many collieries in South Africa. It the seams are In close proximity difficult and dangerous mining conditions may arise. In the Witbank area multiseam bord an

    Jan 1, 1995

  • SME-ICGCM
    Parameters Affecting Resin-Anchored Cable Bolt Performance: Results Of In Situ Evaluations

    By Joseph C. Zelanko

    Cable bolt support techniques. including hardware and anchorage systems, continue to evolve to meet U.S. mining requirements. For cable support systems to be successfully implemented into new ground c

    Jan 1, 1995

  • SME-ICGCM
    The Application Of Underground In-Seam Seismic Methods (UISS) To Map The Coal Seam Structure Across Longwall Panels

    By Rene Rodriguez

    The initial results of our investigations on the applicability of geophysical exploration methods to map coal seam inclusions were summarized in a paper submitted at the Thirteenth Conference on Groun

    Jan 1, 1995

  • SME-ICGCM
    Design And Planning Of Lower Seam Longwall Gateroads

    Case study data were analyzed to develop and quantify empirical stress transfer relationships between seams for both longwall and room and pillar mines. Layering in the innerburden and the distance be

    Jan 1, 1995