  • SME-ICGCM
    The Control Of Surface Subsidence By Width/Depth Ratio And Chain Pillar Size In The Presence Of Competent Coal Measures

    By E. H. R. Schumann

    The local stratigraphy and composition of the coal measures, including competent dolerite sill and massive sandstone lavers is shown to have a restricting influence on the development and magnitude of

    Jan 1, 1988

  • SME-ICGCM
    The Design And Application Of Hercules Cribs For Underground Mining

    By Mike Faure

    Hercules cribs make use of timber loaded parallel and perpendicular to the grain. Maximum use is made of the orthotropic properties of timber resulting in crib- having superior strength, high initial

    Jan 1, 1993

  • SME-ICGCM
    The Design And Application Of Propsetter? In Underground Coal Mines

    By Clifford McCartney

    The PropsetterTM System has been designed and developed to cost effectively solve problems experienced with conventional underground supports used in tailgates, headgates, bleeder entries and as suppl

    Jan 1, 1995

  • SME-ICGCM
    The Design and Management of Wide Roadways in Australian Coal Mines

    By Rob Thomas

    "In Australia, a wide roadway is commonly defined as any roadway that is driven to a width greater than 5.5 m (18 ft). These roadways are typically required to enable the installation of longwall equi

    Jan 1, 2010

  • SME-ICGCM
    The Design And Selection Of Powered Supports For Application In 4.5 Metre Extraction At Daw Mill Colliery

    By Clive Chadbourne

    Investigations of world wide coal face strata control practice, the study of theoretical calculations and detailed engineering analysis have been combined to design and select a powered roof support s

    Jan 1, 1994

  • SME-ICGCM
    The Design of Primary Ground Support during Roadway Development Using Empirical Databases

    By Ry Stone

    "There have been many design practices utilised within the coal mining industry to arrive at the minimum densities of primary ground support required during roadway development. This paper demonstrate

    Jan 1, 2015

  • SME-ICGCM
    The Design of Room and Pillar Mining Systems in the UK

    By Graham Daws

    State of the Art Room and Pillar mining techniques have been employed at two coal mines in the UK in the last two years. This paper describes the design of pillars and rockbolted support systems for R

    Jan 1, 1998

  • SME-ICGCM
    The Development and Application of Polyurethane Injectable Cable Bolts

    By Dakota D. Faulkner

    Cable bolts have been very effective in mine ground control. Non-tensioned and tensioned cable bolts are now used for both primary and supplemental bolting (Suder, 2001; Mirabile, 2010). In the United

    Jan 1, 2012

  • SME-ICGCM
    The Development and Planning of Multiple Level Underground Limestone Mines

    By Bruce W. King, David A. Newman

    "Underground mines have always been an integral part of the limestone industry. However, beginning in the 1990s, the number of underground limestone mines has increased for many reasons including• Str

    Jan 1, 2016

  • SME-ICGCM
    The Development And Use Of Risk Assessment Techniques To Assess Roadway Stability In The Parkgate Seam At Thoresby Colliery

    By Paul Cartwright

    A rockbolted roadway risk assessment procedure has been developed specifically for the Parkgate seam at Thoresby Colliery by Rock Mechanics Technology and colliery engineers. The purpose of this asses

    Jan 1, 1999

  • SME-ICGCM
    The Development of Active Cable Anchors for Primary Supports in Coal Mines

    By Scott A. Shapkoff

    High strength cable strand supports are predominately used as a supplemental means of ground control in longwall and development operations in the U.S. The advantages of cable strand supports have bee

    Jan 1, 2006

  • SME-ICGCM
    The Directional Drill Monitor For Long Hole Gas Drainage In Coal Mines (d6b87c76-5ad8-4cc5-b4ae-23b79c52c32b)

    By G. Skybey

    The Directional Drill Monitor (DDM) is an advanced instrument for real time in hole surveying. It was developed by Du Pont (Australia) to suit Australian gassy coal mining conditions. The instrumen

    Jan 1, 1992

  • SME-ICGCM
    The Duncan Method of Partial Pillar Extraction at Tasman Mine

    By Kent D. Mctyer

    Mining commenced at Tasman Mine in late 2006. The current method of mining is bord and pillar using continuous minerbolters and shuttle cars for first workings and secondary extraction using mobile ro

    Jan 1, 2011

  • SME-ICGCM
    The Duncan Method of Partial Pillar Extraction at Tasman Mine (8325db0b-edfd-48b5-8c88-7ef0db101af9)

    By Kent D. Mctyer

    Mining commenced at Tasman Mine in late 2006. The current method of mining is bord and pillar using continuous minerbolters and shuttle cars for first workings and secondary extraction using mobile ro

    Jan 1, 2011

  • SME-ICGCM
    The Effect of Discontinuities Characteristics on Coal Mine Stability and Sustainability: A Rock Fall Prediction Approach

    By Nikzad Oraee, Parham Khajehpour, Kazam Oraee, Arash Goodarzi

    "Rock fall related accidents continue to occur in coal mines, although artificial support mechanisms have been used extensively [1]. Roof stability is primarily determined in many underground mines by

    Jan 1, 2015

  • SME-ICGCM
    The Effect Of Gas Pressure On Coal Strength

    By Najdat I. Aziz

    There are different schools of thoughts about the influence of gas pressure on coal strength. Researchers have reached contradictory results with regard to the effect of confining gas pressure on tens

    Jan 1, 1996

  • SME-ICGCM
    The Effect Of Hazardous Geologic Structures On Gateroad Stability

    By Frank E. Chase

    Geologic structures have been responsible for numerous underground accidents and fatalities, and are a constant-source of down time. During - longwall mining, ground control problems associated with g

    Jan 1, 1990

  • SME-ICGCM
    The Effect of Immediate Strata on Pillar Behavior in Retreat Pillaring-- A Case Study

    By A. W. Khair

    This paper deals with the analysis of pillar failure in a room and pillar mining operation of a deep underground coal mine. The incident here involved the failure of more than 100 pillars. The mechan

    Jan 1, 1986

  • SME-ICGCM
    The Effect of Standing Support Stiffness on Primary and Secondary Bolting Systems (956b0a5f-7133-4b32-8a8e-517785f1d52a)

    By Stephen Tadolini

    Standing crib supports have been applied in underground mining programs to resist large roof movements and sustain high¬loads. The strength and deformation capability of these systems has been documen

    Jan 1, 2003

  • SME-ICGCM
    The Effectiveness Of Interpanel Pillars In The Control Of Surface Subsidence (ef7cc44b-3192-4f5f-a75c-62563d519797)

    By Laxminarayan Holla

    There exist many formulae for designing coal pillars. However, when applied to a given set of mining parameters, they lead to different pillar sizes and factors of safety. From the subsidence point of

    Jan 1, 1992