Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
An Alternative for More Productive Rib Bolting in Underground Mining Applications
By Joe E. Bryan, John P. McDonnell
"Underground mine rib stability is an ongoing safety issue in all mining applications. Rib-related accidents present at least as many problems as roof-related ground control. Underground coal mine rib
Jan 1, 2015
-
An Alternative for More Productive Rib Bolting in Underground Mining Applications
By Joe E. Bryan, John P. McDonnell
"Underground mine rib stability is an ongoing safety issue in all mining applications. Rib-related accidents present at least as many problems as roof-related ground control. Underground coal mine rib
Jan 1, 2015
-
An Alternative To A Manual Torque Check On Roof Bolts
By Joseph A. Cybulski
In response to the mining of reserves with increasingly adverse round conditions and the roof support recommendations of current rock mechanics theories, roof support systems have continued to improve
Jan 1, 1990
-
An Analysis Of Longwall Shield Cycle Effectiveness By Polycorder Monitoring
By Greg Hendon
Various methods have been used to evaluate the effectiveness of shields in place. The most common method used is static recording of leg pressures by visually examining pressure gauges. In an effort t
Jan 1, 1990
-
An Analysis of Rock Failure Around a Deep Longwall Using Microseismics
By Keith Heasley
In this paper, a state-of-the-art, three-dimensional, full waveform, microseismic system was used to analyze the rock failure around a deep (> 750 in (2500 ft) of cover) bump-prone longwall panel. The
Jan 1, 2001
-
An analysis of roof-pillar-weak floor interaction in partial extraction room-and-pillar mining
By W. M. Pytel
The applicability of the beam theory in analysis of roof- pillar-weak floor interaction in partial extraction room-and-pillar mining is presented. The mine structure is modeled as an equivalent multi-
Jan 1, 1989
-
An Analytical Approach For The Estimation Of Pillar Strength
A procedure fm the estimation of pilla1 strength is presented where the design of underground coal pillars is emphasized. An analytical approach has been developed, proposing that the effect of end co
Jan 1, 1990
-
An Analytical Approach to Determine Stress Distribution in Longwall Chain Pillars
By James M. Kramer
This paper introduces an analytical approach for the determination of the vertical stress in the chain pillar system between two adjacent longwall panels. The development of this approach is based on
Jan 1, 1998
-
An Application Of Energy Release Rate
By Morgan M. Sears
In recent years, one large mine collapse and numerous smaller bump events have resulted in a renewed interest in coal bump research. With numerical modeling, the Energy Release Rate (ERR) calculation
Jan 1, 2009
-
An Application Of Fem Back Analysis Method To Mine Roadway
Knowledge of initial ground pressures or in-situ stresses and mechanical properties and geological conditions is of great importance in drivage and maintenance of a mine roadway. Field measurements
Jan 1, 1990
-
An Application Of Tree Classification Method In Analysis Of Longwall Shield Stability
By Yong-Ming Jiang
Longwall mining systems are extremely complex and expensive and require great caution for reliable and efficient operation. In many cases, ground control problems are the primary concern in longwall m
Jan 1, 1993
-
An Applications Approach To Barrier Pillar Design For Improved Resource Recovery
By John R. Koehler
Available barrier pillar design methods do not adequately account for overburden caving characteristics, the timing and magnitude of associated load transfers, the occurrence of unusual geologic featu
Jan 1, 1989
-
An Approach To Identifying Geological Properties From Roof Bolter Drilling Parameters
By Gerald I. Finfinger
Identifying the properties of overlying rocks in underground mining operations is important to ensure the appropriate roof support design is used to maintain stability of the mine entries. Recently J.
Jan 1, 2000
-
An Approach to Predict Rock Mass Deformations in Three Dimensions for a Part of an Open Pit Mine and Comparison with Field Deformation Monitoring Data
By Pinnaduwa H. S. W. Kulatilake, Biao Shu
The intact rock properties and discontinuity properties for both Devonian Rodeo Creek (DRC) and Devonian Papovich (DP) rock formations that exist in the selected open-pit mine were determined from tes
Jan 1, 2015
-
An Area Calculation of the ARBS Support Intensity
By Ihsan B. Tulu, Keith A. Heasley, Aanand Nandula
"The objective of this paper is to present the development of a software tool that will assist in an area calculation of the Analysis of Roof Bolting Systems (ARBS) support intensity while incorporati
Jan 1, 2018
-
An Assessment of Coal Pillar System Stability Criteria Based on a Mechanistic Evaluation of the Interaction between Coal Pillars and the Overburden
By Guy Reed, Russell Frith, Kent Mctyer
"Coal pillar design has historically been based on assigning a design factor of safety (FoS) or stability factor (SF) to coal pillars according to their estimated strength and the assumed overburden l
Jan 1, 2016
-
An Assessment Of Rockbolting In Geologically Disturbed Mine Roadways
By Erdal Akyol
The rockbolting method of support is employed widely in several countries in different of mines. Hard rock mines use this method extensively. Soft rock mines, such as coal mines, have employed standin
Jan 1, 1992
-
An Engineering Analysis Of "Squeeze" Failure Of Pillars In The Pittsburgh Coal Bed
By George Mishra
In mid-1979, J&L Steel Corporation experienced rapid failure of pillars after only two weeks' operation with a combination of full retreat and partial mining in the 154 Road Section of its Nemaco
Jan 1, 1981
-
An Evaluation Of Strata Behavior And Tailgate Support Performance At Eagle Nest Mine
By T. P. Mucho
Strata behavior and support performance were evaluated in a longwall tailgate test area at the Eagle Nest Mine near Van, WV. The mine operates in the Eagle coalbed which ranges in height from 4 to 6 f
Jan 1, 1996
-
An Examination Of Energy Calculations Applied To Coal Bump Prediction
By Keith A. Heasley
Pillar recovery in deep coal mines with competent roof and floor can concentrate stresses and generate hazardous bumps. Actual calculation of the geologic strain energy released in association with th
Jan 1, 1990