Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • SME-ICGCM
    Microcirculation Theory Analysis Of Spontaneous Combustion Of Loosing Coal In The Top-Coal Caving Region Of Entry

    By Q. F. Wang

    Spontaneous combustion hazard of loose coal in the top-coal caving region of entry affects the safety of the entry and top- caving longwall face seriously. In this paper, by combining on- site tempera

    Jan 1, 2004

  • SME-ICGCM
    Microcomputer Simulation of Rock Blasting to Predict Fragmentation (e1b89d1b-bf88-4e3c-9f38-0d3739330b7a)

    By C. Dinis da Cama

    In order to reduce the complexity of mechanisms influencing rock- fragmentation by blasting a simulation approach is proposed, using the capabilities of micro-computer interactive graphics. Situat

    Jan 1, 1984

  • SME-ICGCM
    Microseismic Monitoring In The Sydney Coalfield

    By G. R. Corbett

    Between 1977 and 1984, No. 26 Colliery, at Glace Bay in the Sydney Coalfield, suffered from a series of 37 rock/gas outbursts. These events were characterized by the complete pulverization of a sandst

    Jan 1, 1994

  • SME-ICGCM
    Microseismic Monitoring of Mountain Bumps and Bounces: A Case Study

    By J. L. Condon

    The Bureau of Mines, through in-house and contract research, monitored mountain bump-prone areas of the Olga #2 Mine, near Welch, WV, using microseismic techniques for 15 months during 1985 and 1986.

    Jan 1, 1987

  • SME-ICGCM
    Mine Convergence When Using Mobile Roof Supports In Pillar Recovery

    By J. R. Stoltz

    To date, there has been limited formal research dealing with the use of Mobile Roof Supports (MRS) for pillar recovery. This paper, which is a portion of a larger project, presents convergence data fr

    Jan 1, 1999

  • SME-ICGCM
    Mine Design Considerations For Surface Subsidence Control

    By John L. Edwards

    The underground coal mines in the Lake Macquarie area of the Newcastle Coalfield, New South Wales, Australia are constrained by surface subsidence restrictions as low as 150 mm. The mining environment

    Jan 1, 1993

  • SME-ICGCM
    Mine Layout Deign for Coal Bump Control

    By Hamid Maleki

    A comprehensive study consisting of stress determinations, core logging, laboratory testing, and numerical analyses was conducted to investigate the cause and potential alternatives to the coal bump c

    Jan 1, 1987

  • SME-ICGCM
    Mine Panel Collapse - Two Case Studies

    By Hanjie Chen

    A mine panel collapse may occur when pillar sizes are too small or the surrounding rock strata (roof or floor) yields. After a small pillar fails, its loading is rapidly transferred to adjacent pillar

    Jan 1, 1999

  • SME-ICGCM
    Mine Pillar Stability Analysis Using Fem Methods - Two Case Studies

    By David H. Tang

    Massive pillar failures were observed at two underground coal mines. The results of stability analysis using traditional pillar design formulae did not agree with the underground observations. Finite

    Jan 1, 1990

  • SME-ICGCM
    Mine Planning For Longwall And Pillar Retreat Panels Subject To Seam Interaction Effects

    By Thomas L. Vandergrift

    Multiple-scam mining is becoming more common in the United States, especially in the East, where primary reserves arc being depleted, forcing mining companies to develop secondary seams, Although mine

    Jan 1, 2000

  • SME-ICGCM
    Mine Roof Geology Information System (MRGIS)

    By Syd Peng

    It is necessary to fully understand roof geological features in order to design a proper roof support system for underground coal mines. These geological features include: rock type, rock strength. ro

    Jan 1, 2003

  • SME-ICGCM
    Mine Seals ? A Rational Base for Design and Construction

    By Kot Unrug

    Mine seals are necessary in nearly every mine to isolate mined-out areas from the ventilation network. There is a large number of seals in active mines and that number continually increases as the de

    Jan 1, 2008

  • SME-ICGCM
    Mine Stability Evaluation From Microseismic Activity (5cc6a13d-fd4e-4c74-a7d1-2213b7f2a1da)

    By Brian R. A. Wood

    Any defect activity resulting from an applied stimulus on a structure will generate a stress wave which travels in the medium under the laws of acoustics, thus the name of acoustic emission (AE). AE t

    Jan 1, 1992

  • SME-ICGCM
    Mine Stability Mapping

    By Collin L. Stewart

    The high cost and limited flexibility of modern longwall systems has resulted in the need for mine engineers and geologists to predict possible adverse mining areas ahead of mining and to then design

    Jan 1, 2006

  • SME-ICGCM
    Mine Water Vs. Drinking Water?Technical Execution and Legal Relationship in Germany

    By Tobias U. Papst

    The German Ruhrgebiet is slowly transitioning into a post-mining state. It has been subjected to industrial-grade hard coal mining operations for more than 150 years. Due to a political decision, Germ

    Jan 1, 2014

  • SME-ICGCM
    Mine-Wide Monitoring Applications In Ground Control Research

    By David Conover

    Technological advancements in electronic sensors and mine-wide monitoring systems have improved remote monitoring and analysis of underground mining information. The effective use of . these systems f

    Jan 1, 1990

  • SME-ICGCM
    Mine-Wide Physical Property Trend Identification Using Portable Onsite Test Devices

    By Thomas L. Vandergrift

    The type and severity of coal mine entry failures are affected by the strength and stiffness properties of the roof, floor, end coal. Knowledge of the mine-wide trends of these properties Is valuable

    Jan 1, 1990

  • SME-ICGCM
    Mining Effects on Gas and Oil Wells Pad NV-35 Field Experiment Field Monitoring

    By Vincent A. Scovazzo

    "The most significant study on the effects of longwall mining on gas and oil well integrity was completed by a consortium of coal and shale gas industry participants. A field study was conducted in 20

    Jan 1, 2018

  • SME-ICGCM
    Mining Geotechnical Benchmarking

    By Vincent A. Scovazzo

    Benchmarking is a business management process that seeks improvement through the study and reapplication of practices conducted by industry leaders. This discussion presents objectives and organizatio

    Jan 1, 2000

  • SME-ICGCM
    Mining Method For Extracting An Eight Metre Coal Horizon Containing A Sandstone Layer

    By Freddie Hunter

    An underground mining method for extracting an eight metre (26') coal horizon, containing a sandstone layer. A decrease in the thickness of the rock strata between the number two and number th

    Jan 1, 2003