Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Tunnel Vision: Planning a Resilient 21st Century Wastewater System for Houston - RETC2021
By Brian Gettinger, Jared Barber, Richard Weatherly, Shannon Dunne, Jeff Masek, Chuck Wolf, Fazle Rabbi, Jack Canfield
During Hurricane Harvey over 60% of the 39 WWTPs, including the low-lying 25 MGD Sims North WWTP, and one third of the 382 lift stations owned and operated by the City of Houston were flooded resultin
Jun 13, 2021
-
Design and Construction Challenges for the North Temple Tunnel - NAT2022
By Todd Kilduff, Michael Tinney
The North Temple Tunnel pedestrian underpass in Salt Lake City, UT was built using a pipe canopy method that met significant challenges in potentially running ground conditions. Kilduff Underground En
Dec 1, 2022
-
Lesson Learned During the EPB TBM Launch Using Umbilical and Muck Pump - RETC2021
By D. Nebbia, R. Aliberti, F. Solesin
The launch of a Tunnel Boring Machine (TBM) is one of the most challenging activity parts of the construction of a tunnel. Challenges are coming from limited space available, learning curve, concurren
Jun 13, 2021
-
INVESTIGATING RELATIONSHIPS BETWEEN METHANE EMISSIONS AND ATMOSPHERIC DATA IN UNDERGROUND COAL MINES TO DEVELOP A FORECASTING MODEL - SME Annual Meeting
By K. Luxbacher, D. T. Hristopulos, S. Schafrik, J. Diaz, Z. Agioutantis
Big data is generated from both surface and underground mining operations. Such data contain a wealth of information concerning safety and health in the workplace and production parameters. This paper
Mar 2, 2022
-
Soil Conditioning for Potomac Group Soils in Washington DC - NAT2022
By R. Aliberti, E. Comis, M. Wone
DC Water’s Clean Rivers (DCCR) program involves the construction of approximately 29 km (18 mi) of CSO tunnels in Potomac Group soils in the Washington DC area. Soils include an upper predominantly ov
Dec 1, 2022
-
NEBT Project: The Application of Artificial Intelligence (AI) to Improve TBM Operations - RETC2021
By Rajat Gangrade, Haotian Zheng, Jarrett Smith, Daniele Nebbia, Mike Mooney
The application of artificial intelligence (AI) to improve tunnel boring machine (TBM) operations requires a significant amount of information to train robust performance prediction models, e.g., for
Jun 13, 2021
-
Hard Rock Tunnel Boring in Challenging Conditions at the Jefferson Barracks Tunnel - NAT2022
By Doug Harding
The Metropolitan St. Louis Water District’s Project Clear is a 28-year program targeting wastewater capacity throughout St. Louis, MO. The extensive program includes the Jefferson Barracks Tunnel, run
Dec 1, 2022
-
The Use of Low-Density Cellular Concrete (LDCC) in Annular Fill Applications: Kaneohe-Kailua Sewer Tunnel Case Study - RETC2021
By Don Painter, Nico Sutmoller, Lori M. K. Kahikina, Brian Dorwart
This paper will address the feasibility of using low-density cellular concrete (LDCC) for an annular fill application where project conditions required pumping the LDCC material for distances of up to
Jun 13, 2021
-
Tunneling in Abrasive Alluvial Material Above the Water Table Using a MTBM and an EPBTBM - RETC2021
By D. Lynn, D. Arthur
Infrastructures continue to age and drinking water supplies are becoming scarce in the San Fernando Valley of Los Angeles, California. Frontier-Kemper Constructors, Inc. (FKCI) was engaged by the Los
Jun 13, 2021
-
Precision Drilling for the Pardee Chemical Feed Shaft Project - NAT2022
By Emily Sing, Ashim Gajurel, Thomas Pennington, William Brown
The Pardee Chemical Feed Shaft Project involves construction of two new chemical feed shafts to improve raw water treatment capabilities at the East Bay Municipal Utility District’s (EBMUD) Pardee Res
Dec 1, 2022
-
Environmentally Friendly Soil Conditioning for EPB TBM: The State of Environmental Considerations in North America and Around the World - NAT2022
By T. Murt, C. Oñate
In recent years, environmental considerations have played a prominent role in underground construction projects. The management and disposal of the muck produced by an EPB TBM is an important aspect o
Dec 1, 2022
-
Effect of Machine and Operational Parameters on Utilization Factor -NAT2022
By Omid Frough, Hossein Changani
Application of Tunnel Boring Machines (TBMs) is one of the main solutions to achieve a safe and high-performance method of construction in hard rock and soft ground tunneling. In order to adequately a
Dec 1, 2022
-
Design of Large Underground Near Detector Cavern for Fermilab in Batavia, Illinois - RETC2021
By David Mast, Irwan Halim, Seung Han Kim
Fermilab is constructing a large underground cavern in Limestone to house scientific equipment. The cavern will have a complex L-shaped geometry and about 215-foot depth with relatively shallow rock c
Jun 13, 2021
-
Built to Last? A UK Initiative to Manage Tunnel Infrastructure - NAT2022
By Martin Knights
The UK Industry is preparing a new guide on Tunnel Asset Management that reflects current industry advances, in developed technological innovation and evolving tunnel asset owner requirements. This wi
Dec 1, 2022
-
CMAR Delivery Targets Effective Management of Risks in Achieving Water Supply Objectives - RETC2021
By Cary Hirner, Sarah Lothman, Chris Mueller, Savita Schlesinger, Mike Hanna, Ian Fitz-James
Loudoun Water is currently implementing a quarry to reservoir conversion that will improve water supply reliability in periods of drought and flexibility in water supply operations when turbidity in i
Jun 13, 2021
-
The Northeast Boundary Tunnel—A TBM Performance Review - NAT2022
By Elisa Comis, Jeffrey Peterson, Yama Ebrahimi
Construction of the Northeast Boundary Tunnel (NEBT), the last leg of the Anacostia River Tunnel System on DC Water’s Clean Rivers Project, started in September 2018 and was completed in April 2021. T
Dec 1, 2022
-
Toledo Waterways Initiative—Completion of an 18-Year LTCP Program - RETC2021
By Leo Gentile, David Selhorst
The $528 million Toledo Waterways Initiative (TWI) was implemented by the City of Toledo in 2002 and completed in August 2020. Toledo is one of many US cities required to implement a Long-Term Control
Jun 13, 2021
-
Slurry Wall Construction in Coarse-Grained Soils - NAT2022
By J. Andrew McGlenn, Greg Emslie, Murray Gant
The Second Narrows Water Supply Tunnel will ensure system reliability in the event of a major earthquake and increase the Greater Vancouver Water District’s capacity to meet a growing population’s lon
Dec 1, 2022
-
Upgrading Mount Royal Tunnel to Latest Standards - RETC2021
By Verya Nasri, Behrouz Esmaeilkhanian, Mohammad Motallebi
The Mount Royal Tunnel (MRT) is a 100-year-old railway tunnel located in Montreal, Canada. The tunnel is approximately 5 km long, 8.7 m wide and 5.5 m high, with a constant 0.6% grade. This existing t
Jun 13, 2021
-
Analysis and Design of Tunnel Lining Through a Potentially Displaceable Fault - NAT2022
By Theodore Feldsher, Seung Han Kim, Mourad Attalla, John Roadifer, Chu-Chieh Jay Lin
Lifelines in seismic regions of the world seldom can escape crossing active faults. Cities in California have been mitigating this risk by constructing improved fault crossings. This paper discusses t
Dec 1, 2022