Calibration Techniques for Discrete Element Method Analysis in Soft Ground TBM Applications - RETC2021
By Glenn Mongillo
Discrete Element Method (DEM) software has been successfully used to simulate various machine/soil interactions and provide insight for industries such as mining and bulk material processing. This pap
Jun 13, 2021
-
Contracting Practices for Underground Freight Transportation Projects: A Look at Cargo Sous Terrain - RETC2021
By Jürg Künzle
The use of the underground space has been a recurring issue in human history, whereas the reasons for building subsurface structures have changed over time. In the decades to come, the world will be m
Jun 13, 2021
-
Quantification of Tangible and Intangible Benefits of Digitalization in Tunnel Construction - RETC2021
By Angus Maxwell, Jacob Grasmick
As the tunneling industry continues to adopt Tunnel 4.0, digital twins of the tunnel construction site are becoming standard requirements for tunneling projects. However, the benefits of these remain
Jun 13, 2021
-
Cutterhead Inspection and Maintenance on the Coxwell Bypass Tunnel Project in Toronto, ON - NAT2022
By William Hodder, Ehsan Alavi, Muhib Hussain
Disc Cutter Wear is influenced by several geological and technical factors and excessive wear can have a major impact on the excavation efficiency of Tunnel Boring Machines (TBM). Disc cutter replacem
Dec 1, 2022
-
Amtrak East River Tunnels Structural Repairs and Reconstructions - NAT2022
By Daniel McNamee, Wern-ping N. Chen
The Amtrak East River Tunnels include four tunnels, Line 1 to Line 4, which extend from New York Penn Station in Manhattan, under the East River to Sunnyside Yard in Long Island City. Since fall 2015,
Dec 1, 2022
-
Tunnel Rehabilitation Through Historic Landslides in Laguna Beach - NAT2022
By Trenton Cohen, Joseph McDivitt, Shimi Tzobery, Joseph Sinacori, Scott Zylstra
The 2-mile Beach Interceptor Sewer Tunnel was constructed in 1954 to then-current mining and construction standards. Due to its lifespan and deteriorating condition it is now being stabilized and reha
Dec 1, 2022
-
Design and Construction Challenges at the Potomac River Tunnel in Washington DC - RETC 2021
By Moussa Wone, Martino Scialpi, Colin LaVassar, Carlton Ray
The Potomac River Tunnel (PRT) is the next major phase of the DC Clean Rivers Program. The design-build PRT project includes a 5.5-mile-long, 18-foot-internaldiameter tunnel, seven shafts, and two und
Jun 13, 2021
-
Tunneling Under Highway 401: Construction of Large Diameter Pre-Support Pipe Canopy - RETC2021
By Tyler Lahti, Peter Borgacci, Mary Jane Ferraro, Prakash Nadesparan
Toronto Tunnel Partners (TTP), under contract to Metrolinx/IO, is constructing new twin rail tunnels under the Highway 401 & 409 interchange to accommodate additional tracks to support the GO Expansio
Jun 13, 2021
-
Evaluating the Impact of DSC’s on TBM Performance in Devonian Dolomite - NAT2022
By Greg Colzani, Emily Thompson
The 3RPORT Project, includes a 5-mile tunnel excavated by a 19-foot diameter slurry Tunnel Boring Machine below the city of Fort Wayne, IN. The Geotechnical Baseline Report (GBR) indicated vuggy to ma
Dec 1, 2022
-
High-Speed 3D Tunnel Inspection in Subway Tunnels— Case Study San Francisco BART - RETC2021
By Thomas Pea, Heiner Kontrus, Jérôme Steinkühler
In tunnel condition assessment, the trend is towards comprehensive 3D measurement combined with high quality image texture to document and quantify damages to the tunnel surface and to create a cohesi
Jun 13, 2021
-
The Effect of TBM Diameter on Ring Installation Time - RETC2021
By Jamal Rostami, Tala Tahernia
TBM utilization rate is a component of machine performance prediction and critical for developing a reliable estimate of the construction completion time and cost of the tunnel. Estimation of the util
Jun 13, 2021
-
How Correct are Geostatistical Models in Predicting Soil Transitions? - NAT2022
By Hongjie Yu, Mike Mooney
Transitions between geological/geotechnical soil units have a critical impact on the operation and performance of a tunnel boring machine (TBM). Geostatistics-based probabilistic modeling is used to q
Dec 1, 2022
-
Design and Construction of Load Transfer System to Replace Existing 39th Street Bridge Piers with New Integral on the Track B/C Approach Structure for the East Side Access Project - RETC2021
By Julio C. Martinez, Jeffrey L. Rice, Hayden Weschler
This paper details the extensive underpinning required to hold up the 39th street Bridge while demolishing its massive support piers and building a 30ft deep Cut/ Cover RR tunnel beneath it. The under
Jun 13, 2021
-
The Variable Density TBM—Current Level of Development - RETC2021
By Werner Burger
After its first introduction in 2013, Variable Density TBMs have increased their application significantly in mechanized closed mode tunneling. Throughout a variety of successfully completed and ongoi
Jun 13, 2021
-
Can We Mine Yet? Criteria for Grouting Completion in Tunnel Headings - NAT2022
By Adam Bedell, Jack Raymer, Brad Crenshaw
Tunnel contracts often include provisions for pre-excavation probing and grouting for areas ahead of the tunnel heading. If grouting triggers are met, tunneling stops, and grouting is performed. There
Dec 1, 2022
-
Utilizing “Big Tex” for the Dallas Mill Creek Drainage Relief Tunnel - RETC2021
By Paul J. Smith, Eudomar A. Silva, Quang D. Tran, J. Milton Brooks
The Dallas Mill Creek Drainage Relief Tunnel is an 8.04 km (5 mile) tunnel that will provide 100-year flood protection for impacted neighborhoods in the east Dallas area. “Big Tex” is a main beam grip
Jun 13, 2021
-
Implementing BIM Underground on Progressive Design-Build Atlanta Plane Train West Extension Project - NAT2022
By Jeff Fontana, Daniel Ebin, Eric Westergren, William Currier
The PMott MacDonaldlane Train Tunnel West Extension (PTTWE) Project at HartsfieldJackson Atlanta International Airport includes the extension of the existing automated people mover system and terminal
Dec 1, 2022
-
Real Challenges of Digging a Shaft in Free Phase Oil and Hydrocarbons - RETC2021
By Ehsan Alavi, Sanjeer Yogendran, Savreet Singh
The Don River & Central Waterfront Coxwell Sanitary Bypass Tunnel Project in Toronto extends approximately 10.5 km from Ashbridges Bay Treatment Plant west under Lake Shore Boulevard, north under Bayv
Jun 13, 2021
-
Construction of Ottawa’s Combined Sewage Storage Tunnel (CSST) - RETC2021
By Alejandro Sanz Garrote, Juergen Laubbichler, Fernando Triana Gracian, Paz Navarro Gancedo-Rodriguez, Andreas Feiersinger
The Combined Sewage Storage Tunnel (CSST) is part of the Ottawa River Action Plan and will greatly reduce the frequency of sewage overflows into the Ottawa River during storms. The project consists of
Jun 13, 2021
-
Design Development of the Brushy Creek Regional Utility Authority Phase 2 Raw Water Delivery System Project - RETC2021
By Aaron Archer, James Parkes
This paper presents design considerations for the major underground elements of the pending BCRUA Phase 2 Raw Water Delivery System Project. These elements include two Lake Taps; an 8,800 LF, minimum
Jun 13, 2021