Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Porphyry Copper Deposits -- A Computer Analysis Of Significance Of Geological Parameters - Introduction
By Marvin P. Barnes
An attempt has been made to compile and code geologic data relating to twenty of the major porphyry copper districts of North America in such a manner as to permit the use of modern electronic digital
Jan 1, 1970
-
Porphyry Copper Deposits Associated With The Needle Creek Igneous Center, Southern Absaroka Mountains, Wyoming
By Frederick S. Fisher
Three spatially separate porphyry copper/molybdenum deposits are associated with the Tertiary Needle Creek igneous center in the southern Absaroka Mountains, Wyoming. In all three deposits a central z
Jan 1, 2013
-
Porphyry Copper Mineralization At The Tapadaa Prospect, Northern Sulawesi, Indonesia ? Introduction
By Garry G. Lowder
The regional geologic setting is essentially a volcanic island arc built upon an oceanic basement, consisting of basalt and minor pelagic sediments (the Tinombo Formation of Eocene - lower Miocene age
Jan 1, 1976
-
Porphyry Copper-Gold Deposits of the Southwest Pacific
By R. L. Andrew
The southwest Pacific has produced at least four of the world’s premier porphyry copper-gold deposits, and the current level of exploration is likely to produce even more. An appreciable amount of gol
Jan 1, 1995
-
Porphyry Copper-Molybdenum Deposits Of The Pacific Northwest ? Introduction
By Cyrus W. Field
The Pacific Northwest as defined in this review comprises an exceedingly large and geologically complex terrain that occupies the 'Western Cordillera mobile tectonic belt. This metallogenic provi
Jan 1, 1973
-
Port Authority Of Alleghany County North Shore Connector Project Tunnels And Station Shell Case History Contracts 003 And 006
By Paul Zick
The Port Authority of Allegheny County North Shore Connector (NSC) Project involves TBM excavation of twin 690 m (2,240 lf) precast segment lined light rail tunnels through soil and rock under the All
-
Port Inland Operations
By J. E. Brownhill
This paper does not deal with the typical start-up issues of equipment, production capacity or work force. This is a description of the challenges faced and the changes made by the project team to bri
Jan 1, 1994
-
Port Mann Main Water Supply Tunnel—Ground Freezing the TBM Face under the Fraser River
By Brian McInnes, Joseph A. Sopko, Behzad Khorshidi
"The Port Mann Main Water Supply Tunnel involves a 1km long tunnel beneath the Fraser River from Surrey to Coquitlam, BC. At depths of up to 60 m below ground, the earth pressure reached 6 bar. The tu
Jan 1, 2016
-
Port of Miami Tunnel Study: Bored or Immersed Tubes?
By Eldon L. Abbott, Rebecca K. Bolan
The Florida Department of Transportation, Florida’s Turnpike Enterprise is studying the feasibility of a 1128 meter (3,700 foot) vehicular tunnel to provide direct access for Port of Miami traffic to/
Jan 1, 2005
-
Port Of Miami Tunnel Tender Design And Update
By Wern-ping (Nick) Chen
The Florida Department of Transportation District 6 (FDOT D6) began a study in 1987 for a master plan to improve the traffic circulation and congestions between the Port of Miami (POM) and downtown Mi
Jan 1, 2009
-
Port of Miami Tunnel Update?A View From Design Builder?s Engineer
By Wern-ping Chen
Technical and non-technical challenges exist in each mega infrastructure project. It?s no exception to the first US underground PPP Port of Miami Tunnel (POMT) project in Miami, FL. The POMT will conn
-
Portable 42" Gyratory Crusher ? Introduction
By V. W. Smith
For the past 50 years, the primary crushing of stone at the Dolase Bros. Co. Richards Spur Quarry. 13 miles north of Lawton, Oklahoma, has been accomplished by a Traylor 42-inch gyratory crusher. The
Jan 1, 1986
-
Portable Crushing Update: Duval Corporation After Two Years - Introduction
By Cal D. Iles
Decreasing ore grades and increasing labor and material costs have seriously eroded the economic vitality of many mining operations. Coupled with global economic stagnation and recession in the early
Jan 1, 1985
-
Portable instruments for measuring tailpipe diesel particulate in underground mines
By J. Noll
There is a need for direct tailpipe sampling of diesel vehicles in mines in order to determine the effects of an emissions-based maintenance program, evaluate control technologies such as diesel parti
Oct 1, 2013
-
Portable Refuge Alternatives Temperature and Humidity Tests
By L. Yan, D. Yantek
Federal regulations require refuge alternatives in underground coal mines to sustain life for 96 h while maintaining an apparent temperature below 35 °C (95 °F). Research by the U.S. National Institut
Jan 10, 2018
-
Portable Rock Strength Tester And Economic Benefits Of Rapid Testing
By Z. J. Hladysz
The Hladysz Rock Tester was developed at the South Dakota School of Mines as a portable rock strength tester. The hand held device is placed against a rock surface and struck by a hammer. The impacted
Jan 1, 1984
-
Portable X-Ray Spectograph In Geochemical Exploration
By Harlan N. Barton
A commercially available portable X-ray spectrograph, lightweight and of rugged construction for vehicle or field camp use, was used for the determination of Ba, Cu, Fe, Mn, Pb, Rb, Sr, and Zn in stre
Jan 1, 1980
-
Porters Creek Clay, Geology, Processing, And Marketing Of A Unique Mineral Assemblage
By Dennis C. Parker
The Porters Creek clay is mined for its absorbent properties. The formation is part of the Upper Mississippi embayment and is recognized in Alabama, Mississippi, Tennessee, Kentucky, Illinois, and sou
Jan 1, 1979
-
Portland Cement
By T. K. McCranie, A. H. Tousley, A. H. Kackman, L. R. Gregory, A. Jr. McElrath, R. J. Krekel
In Roman and earlier civilizations the term cement was applied only to mixtures of lime, pozzolana, sand, water, etc., used as a mortar to bind larger stones. Today, portland cement, the subject of th
Jan 1, 1985
-
Portland, Oregon’s Alternative Contract Approach to Tackle a Complex Underground Project
By Glenn Boyce, Paul Gribbon, Gary Irwin, Greg Colzani, Jim McDonald
This paper discusses the process utilized by the City of Portland Oregon’s Bureau of Environmental Services (BES) to procure and compensate Impregilo-SA Healy (I/H)for the West Side Willamette River C
Jan 1, 2003