Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • SME
    3. Case Study In Open-Pit Limit Analysis ? Introduction

    By J. T. Crawford

    Computer techniques for open-pit limit analysis were introduced into Kennecott Copper Corp. (KCC) during the early 1960's. The first computerized approach used block matrix mineral and economic m

    Jan 1, 1979

  • SME
    3. Computer-Assisted Mineralization Modeling at Kennecott Copper Corporation ? Introduction

    By R. K. Davey

    Before the introduction of computerized procedures, mineralization modeling (compilation of level maps), ultimate pit studies, ore reserve compilations, and long-range mine planning all were performed

    Jan 1, 1979

  • SME
    3. Materials Management ? Introduction

    By D. P. Plute

    The mechanization of the materials management function must contribute to the overall goal of optimization of profits. A computerized system contributes to the profitability of the company by saving m

    Jan 1, 1979

  • SME
    3. Mine Environmental Monitoring and Control ? Introduction

    By Malcolm J. McPherson

    Observations of environmental parameters in mines have traditionally been made by means of hand-held instruments, these being employed as a basis to ensure that atmospheric conditions in the mine rema

    Jan 1, 1979

  • SME
    3. Models for Prospect Evaluation of Skarn Deposits

    By Victor F. Hollister

    Skam deposits considered as porphyry copper deposits have been classified into three basic prospecting models: (I) the skam deposit associated with a mineralized intrusive (Pima-Mission), (2) the depo

    Jan 1, 1991

  • SME
    3. Open-Pit Long-Range Mine Planning Using O.R.E. ? Introduction

    By David E. Sims

    Asarco has been using computer-aided open-pit mine design since 1966. The in-house developed program package includes drill-hole analysis programs, interpolation routines, and three-dimensional open-p

    Jan 1, 1979

  • SME
    3. Pelletization and Sintering ? Introduction

    By K. V. S. Sastry

    Pelletization, sintering, and pressure compaction are the most common methods used to agglomerate ore concentrates. Over the last 20 years agglomeration has grown enormously in popularity and has beco

    Jan 1, 1979

  • SME
    3. Planning of Underground Materials-Handling Systems ? Introduction

    By L. H. E. Weyher

    A mine is essentially a vast materials-handling system. All other systems found in the mine exist to one degree or another to support the materials-handling functions, from the cutting at the face to

    Jan 1, 1979

  • SME
    3. Process Optimization

    By A. L. Mular

    Optimization has been defined as the procedure of locating the best of something or the best way of doing something (Mular, 1971). Several texts (Himmelblau, 1972; Ray and Szekeley, 1973; Box and Drap

    Jan 1, 1979

  • SME
    3. Production Grade Control - A Case Study on Data Base Development ? History

    By Barton Kelby Cross

    In the early 1960's the feasibility of mathematical modeling was demonstrated in Northern Rhodesia and southwestern United States, where techniques were developed to use these models in a new app

    Jan 1, 1979

  • SME
    3. Sample Preparation - Problem Definition

    By Pierre M. Gy

    The final purpose of exploration is to esti- mate the grade and tonnage of the various qualities of ore contained in a given mineral deposit. This estimation cannot be directly carried out on the whol

    Jan 1, 1979

  • SME
    3. Software Technology for Geophysical Systems ? Introduction

    By R. C. Fox

    The geophysical aspect of reconnaissance marks the beginning of extensive computer applications supporting development of a mine. Although there are some storage and retrieval applications in geology,

    Jan 1, 1979

  • SME
    3. Underground Coal Mine Production Reporting Developments at the Bethlehem Mines Corporation ? Introduction

    By L. H. E. Weyher

    The Bethlehem Mines Corp. is a captive mining subsidiary of Bethlehem Steel Corp. Its coal production is tied to the demands for and production of steel, a situation that has to balance between the fo

    Jan 1, 1979

  • SME
    3. Use of a Ground-Water Model in Planning for Oil-Shale Mining

    By J. S. Long

    A finite-difference model using a digital computer was constructed to assist in the water management of a proposed oil-shale mining operation in the Piceance Basin in Colorado. The presence of ground

    Jan 1, 1979

  • SME
    3.1 Introductory Review ? Introduction

    When exploration shows a mineral deposit to be of importance, the subsequent work of defining the limits or boundaries of the ore body and preparing it for the extraction of the mineral is termed deve

    Jan 1, 1979

  • SME
    3.2 Ore-Body Modeling - 1. Technical Overview ? Introduction

    By B. T. Stanley

    The basic geological data, derived from boreholes, exploratory test pits, drivages, and mine development, include information on parameters such as ore thicknesses, grades, depths below surface, struc

    Jan 1, 1979

  • SME
    3.3 Open-Pit Limits Analysis - 1. Technical Overview

    By Y. C. Kim

    One aspect of long-range mine planning in an open-pit mine is first to define the ultimate pit limit, i.e., the projected size and shape of the pit at the end of its life. This chapter is concerned wi

    Jan 1, 1979

  • SME
    3.4 Long-Range Mine Planning - Mining Sequence - 1. Technical Overview

    By R. K. Davey

    Subsequent to the determination of an ultimate pit and ore reserves for metallic and nonmetallic deposits, it is necessary to develop the most profitable long-range mining sequence for the deposit. Lo

    Jan 1, 1979

  • SME
    3.5 Engineering and Environmental Aspects of Surface Mine Design - 1. Technical Overview

    By David J. Hammel

    This chapter will summarize some of the important applications in the geotechnical (pit slope, spoil pile and tailings stability, and hydrology), the environmental (including reclamation), and equipme

    Jan 1, 1979

  • SME
    3.6 Underground Long-Range Planning and Design - 1. Technical Overview - Introduction

    By S. C. Suboleski

    Underground long-range planning and mine design is an iterative process beginning with a specified production level, quality criteria, and geology of the deposit. Given these factors, face equipment i

    Jan 1, 1979