Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
An Empirical Study Of The Effects Of Mesh Selection Procedures On Efficiency Of Mine Ventilation Analysis MethodsBy J. M. Mutmansky
Introduction Since the Hardy Cross numerical algorithm was applied to the solution of mine ventilation networks, numerous developments have taken place in ventilation network analysis procedures. T
Jan 1, 1993
-
An Encounter with Boulders During Soft Ground Tunneling in Wayne County, Michigan: A Case HistoryBy Joseph B. Alberts, David D. DiPonio, Francis B. Manning
From 1996 to 2001, Wayne County and 13 suburban Detroit communities constructed the Downriver Regional Storage and Transport System (DRSTS) to improve area water quality, protect public health and all
Jan 1, 2003
-
An Endeavor In Community Public Relations, The Speakers Bureau Of The Tucson Subsection AIMEBy Ted H. Eyde
Improving the mineral industry's tarnished image describes in a nut- shell the reason why the Speakers Bureau of the Tucson Subsection of the AIME was formed. Let's go back in time about 3 y
Jan 1, 1975
-
An Energy Balance For The Second Underground Coal Gasification Experiment, Hanna, WyomingBy Dennis D. Fischer
The second underground coal gasification experiment conducted by ERDA's Laramie Energy Research Center at a site near Hanna, Wyoming, was completed on July 30, 1976. During the experiment product
Jan 1, 1977
-
An Energy‑T75 Size Reduction Model for Ball Mills - Mining, Metallurgy & Exploration (2023)By Caibin Wu, Chengfang Yuan, Jiaqi Tong, Zhilong Cheng, Ningning Liao, Chong Zeng
In a series of Julius Kruttschnitt size-dependent breakage models, the cumulative percentage passing 1/10 of the initial size is used as a fineness indicator for scientific research and the selection
Dec 22, 2022
-
An Engineer's View Of Underground Construction/Mining And The EnvironmentBy Eugene L. Foster
The engineering profession has traditionally devoted its efforts to understanding and modifying the Earth's environment in order to adapt it to man's needs. In appraising our overall perform
Jan 1, 1974
-
An Engineered Grouting System Developed for the Inter-Island Tunnel, Boston, MassachusettsBy David R. Klug, Chris Gause, Troy L. Page
The Inter-Island Tunnel is one of two undersea tunnels which are part of the Boston Harbor Clean-Up Program. The tunnel is 7.7 km (25,160 ft) long, bored to a 4.3 m (14 ft) diameter in the Cambridge A
Jan 1, 1999
-
An Engineering Approach To Mine Opening Design ? IntroductionBy Lawrence Adler
The design of an underground opening involves the coincidence of two highly complex and poorly specified components. First, the structural or mechanical characteristics of a geologic rock mass are not
Jan 1, 1968
-
An Engineering Approach To Monitoring The Performance Of Soft Ground Tunnels During ConstructionBy C. John Dunnicliff, Birger Schmidt
INTRODUCTION To be effective and useful, monitoring of tunnel construction must be carefully planned throughout all steps. A vital and frequently overlooked step is a clear definition of the specif
Jan 1, 1974
-
An Engineering Approach to Predict Subsidence Likelihood Over Abandoned Coal Mines in IllinoisBy Qing-Wang Hao
In this paper, the authors attempt to develop engineering based approaches for estimating safety factors against pillar and floor failures and predicting likelihood of subsidence events over abandoned
Jan 1, 1986
-
An Engineering Approach To Reduce The Cost Of Roof Support In A Coal Mine Experiencing Complex Ground Control ProblemsBy A. W. Khair
This paper presents an engineering approach to solve a complex ground control problem at reduced cost, allowing the mine to be operated safely and economically. The mine has experienced serious and co
Jan 1, 1990
-
An Engineering Cost Study: Cis Vs Ris With Aurix® 100By Michael J. Virnig, Murdoch W. MacKenzie, Michael R. Davis
The objective of this paper is to present preliminary capital and operating cost estimates (±25%) comparing conventional carbon-in-solution (CIS) with resin-insolution (RIS) using AuRIX® 100 for the
Jan 1, 1999
-
An Environmental Approach To Coal Refuse Disposal ? IntroductionBy Alex G. Sciulli
According to recent estimates, nearly 30 percent of the material from underground coal mining in the United States is rejected on the surface as waste. This accumulation of almost three billion tons o
Jan 1, 1983
-
An Environmental Audit ProgramBy Peter Keppler, Charles Jackson
WHY DO AN AUDIT? There is increased enforcement of environmental laws and regulations at State and Federal levels with attendant steep fines and even the possibility of jail sentences. We are al
Jan 1, 1991
-
An Environmental Impact Assessment Of Seafloor Mineral ExtractionBy Samantha Smith
Nautilus is completing the world's first environmental impact assessment (EIA) of seafloor mineral extraction and Nautilus has gained extensive experience conducting environmental studies in subs
Jan 1, 2008
-
An Environmentalist's Views On Underground ConstructionBy Joseph G. Carleton
INTRODUCTION The increasing concern for the environment may well present far more opportunities than problems for those involved in all phases of tunneling. All too frequently in the past, environm
Jan 1, 1974
-
An Environmentally Compatible Gold Project: The Perama Hill Case (N. Greece)By G. Falalakis
The Perama Hill gold project is an environmentally friendly project designed with the principle of zero discharge to the environment. The main issues of the proposed mine that are addressed in this pa
Jan 1, 2008
-
An Equipment Selection Application Using The AHP MethodBy M. Yavuz
Multiple Criteria Decision Making (MCDM) is one of the most considerable branches of Operation Research. MCDM refers to making decisions in the presence of multiple, usually conflicting, criteria. The
Jan 1, 2007
-
An Erector Transporter For The Installation And Removal Of Specialized Mining Equipment UndergroundBy J. H. LaVerne Palmer, W. (Bill) C. Cox, Lorant B. Geller
An erector transporter (ET) has been designed and built to lift, carry and erect heavy machinery components, in particular the components of a 7.6 m diameter tunnel boring machine (TBM), within the ac
Jan 1, 1985
-
An Evaluation Model Of Landforms Visual ValueBy A. Tsouchlaraki
The physical relief is a variable of utmost significance in the course of the analysis, evaluation, design and management of the visual environment. In this sense, there are cases where it would be de
Jan 1, 2005