Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Appendix C. - Sample Data Deck For Head Loss Calculation Programs
By R. V. Ramani, R. Stefanko, G. W. Luxbacher
TEST DECK - ALTIMETER SURVEY WITHOUT ALTMETER TEMPERATURE CORRECTION 1 BAS 8: 22 1391 1391 53. 49.
Jan 1, 1977
-
Appendix D - Input Data And Computer Output: Simulation Of Methane Flowrate In A Mine Entry
By R. V. Ramani, A. S. C. Owili-eger
List of Numbers
Jan 1, 1974
-
Appendix D - Definitions Of Program Variables
By C. B. Manula, R. L. Sanford, R. A. Rivell
A - Contains the coordinate pair information for deriving the co¬efficients of the 3rd degree polynomial which approximates the loading station equation. C(N) - Coefficients for third degree approx
Jan 1, 1974
-
Appendix D - Development And Experimental Verification Of Acoustic Seal Checker Theory
By David A. Monaghan, Kenneth R. Maser, Adi R. Gurdar, D. Randolph Berry
APPENDIX D DEVELOPMENT AND EXPERIMENTAL VERIFICATION OF ACOUSTIC SEAL CHECKER THEORY 1. Introduction In Section 7 of the report the acoustic seal checker concept was described in a general m
Jan 1, 1973
-
Appendix D - Fire Retardants For Timber – D-1 - Most Effective Salts
By David Hoadley, Kenneth R. Maser, Ashok B. Boghani, James E. Billar, D. Randolph Berry, Mackenzie Burnett, Robert H. Trent
D. 1 Most Effective Salts A. Ammonium Phosphates Monammomium phosphate and diammonium phosphate (salts of ortho phosphoric acid) are superior to the triammonium salt in fire-resisting propertie
Jan 1, 1976
-
Appendix D - Methods For Controlling Respirable Coal Mine Dust From Overburden Drilling At Surface Coal Mines - D.l Engineering Controls
Engineering controls for overburden drilling include dry dust collection systems, wet dust suppression systems, and enclosed cabs [Zimmer and Lueck 1986; Volkwein et al. 1979]. Proper maintenance of t
Jan 1, 1997
-
Appendix D - Shuttle Car - Weighing Experiment
By Thomas V. Falkie, R. Venkataramani
Hand portable truck axle scales were purchased from the Martin¬Decker Company, Santa Ana, California, for weighing the rubber-tired mine shuttle cars. The scales consisted of two hydraulic load-pads,
Jan 1, 1972
-
Appendix D - USBM Method Program Output
By R. V. Ramani, R. Stefanko, G. W. Luxbacher
TEST DECK – ALTMETER SURVEY WITHOUT PLTTMETER TEMPERATURE CCRRECTION DATA INPUT
Jan 1, 1977
-
Appendix E - Equipment Used For Field Testing Of Mine Sealing System
By David A. Monaghan, Kenneth R. Maser, Adi R. Gurdar, D. Randolph Berry
APPENDIX E EQUIPMENT USED FOR FIELD TESTING OF MINE SEALING SYSTEM I. Drilling Operation - Equipment supplied by local drilling contractor 1. Mobile drill rig. 2. Flat bed truck, containing 2
Jan 1, 1973
-
Appendix E - Refuge Chamber Leakage Analysis
By David Hoadley, Kenneth R. Maser, Ashok B. Boghani, James E. Billar, D. Randolph Berry, Mackenzie Burnett, Robert H. Trent
APPENDIX E REFUGE CHAMBER LEAKAGE ANALYSIS Variables p 0 = pressure outside of chamber (psi) p = pressure inside of chamber (psi) i q = leakage flow rate (cfm) Q= total leakage (cu ft. ) V
Jan 1, 1976
-
Appendix E - Thermodynamics Method Program Output
By R. V. Ramani, R. Stefanko, G. W. Luxbacher
TEST DECK - AITIHETER SURVEY WITHOUT ALTIMETER TEUPERATURE CORRECTION DATA INPUT
Jan 1, 1977
-
Appendix F - Government Offices Contacted During Survey
By David Hoadley, Kenneth R. Maser, Ashok B. Boghani, James E. Billar, D. Randolph Berry, Mackenzie Burnett, Robert H. Trent
APPENDIX F GOVERNMENT OFFICES CONTACTED DURING SURVEY 1. MESA Inspection Offices North Central District Duluth, Minnesota South Central District Dallas, Texas Rolla Subdistrict Rolla,
Jan 1, 1976
-
-
Appendix F – Free Read Program For PSU/MVS
By R. V. Ramani, R. Stefanko, G. W. Luxbacher
THIS PROGRAM TRANSFORMS FREE FORHATED BRANCH DATA INTO A FORMAT SUITABLE FOR INPUT TO THE PENNSYLVANIA STATE UNIVERSITY MINE VENTILATION SIMULATOR (PSU/HVS 1. BRANCH RESISTANCES ARE ASSUMED TO H
Jan 1, 1977
-
Appendix G - Table Ix - Mine A
By David Hoadley, Kenneth R. Maser, Ashok B. Boghani, James E. Billar, D. Randolph Berry, Mackenzie Burnett, Robert H. Trent
APPENDIX G TABLE IX MINE A 1 General Total Employees 3000 Maximum No, of Men Underground/Shift 800 Shifts/Day 3 Type of Ore Copper Daily Production (TPD) 25,000 Mining Method Room and Pillar
Jan 1, 1976
-
Appendix G – Input Data fort initial Simulation
By R. V. Ramani, R. Stefanko, G. W. Luxbacher
1 9 THIS IS A DIGITAL COMPUTER SIMULATION OF THE VENTILATION SYSTEM OF A MINE LOCATED IN WASHINGTON COUNTY; PENNSYLVANIA. THE VENTILATION SURVEY ON WHICH THIS SIMULATION IS BASED WAS RUN FROM OCT. 27
Jan 1, 1977
-
Appendix H – Computer Output for Initial Simulation
By R. V. Ramani, R. Stefanko, G. W. Luxbacher
MINE VENTILATION NETWORK ANALYSIS
Jan 1, 1977
-
Appendix I - Cost Analysis System
By R. V. Ramani, V. T. Burgos, J. A. McClay
Introduction The Cost program was developed to provide the planning engineer with a tool to evaluate the cost implications of the technical mine design decisions. Direct costing methods are empl
Jan 1, 1975
-
Appendix I – Addition of Andrews Shafts – Input Data
By R. V. Ramani, R. Stefanko, G. W. Luxbacher
1 11 THIS IS A DIGITAL COMPUTER SIMULATION OF THE VENTILATION SYSTEM OF A MINE LOCATED IN WASHINGTON COUNTY, PENNSYLVANIA. THE VENTILATION SURVEY ON WHICH THIS SIMULATION IS BASED WAS RUN FROM OCT.
Jan 1, 1977
-
Appendix I – Computer Program Listing
By R. V. Ramani, C. B. Manula, A. Owili-Eger
• MINE VENTILATION NETWORK PROBLEM (NATURAL SPLITTING; FIXED • QUANTITY BRANCHES; METHANE SIMULATION; NETWORK TOPOLOGY REVISION; • ABSOLUTE PRESSURE) • NFIXB = NO. OF FIXED QUANTITY BRANCHES • DD(
Jan 1, 1975