Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • ISEE
    Natural Cavities in Iron Ore Deposits in Brazilian Northern Region: Challenges and Strategies

    By Anderson Meireles, Leonardo Soares Chaves, Raul Carretero Hoz, Carlos Eduardo Soares Feliciano, Renato Jacome Costa

    The large iron deposits in the northern region of Brazil located in the Amazon Craton have in common the presence of natural cavities. These cavities primarily occur in the upper layer of the ore body

    Jan 21, 2025

  • ISEE
    Case Study Using 3-D Blast Modeling to Develop Design for Blasting in Close Proximity to Pit Pump

    By Stuart Brashear, Steven Bell, Donald Smith

    This Limestone site required the removal of a bench containing high quality rock located in close proximity to sump and pit pump. The sump and associated electrical box were below the bench that neede

    Jan 21, 2025

  • ISEE
    A Maximum Instantaneous Charge Map for Environmental Protection in Rock Blasting at the Serra Sul Mine (S11D)

    By Raúl Carretero de la Hoz, Leonardo Soares Chaves, João Paulo Soares Toneli, Francisco Felipe da Silva Dantas, Marcos Peres Lopes, Marcus Vinicius da Silva Gonçalves

    The mining activity results in environmental impact and thus requires the adoption of techniques to minimize its effects. The rock blasting process is required to break up and move the rock enabling t

    Jan 21, 2025

  • ISEE
    Front-End Loader Proof of Concept to assess the performance of an autonomous fragmentation analysis system.

    By Tyler Rockley, Carla Reyes

    Autonomous fragmentation measurement systems designed for shovels have been in operation for nearly two decades, however fragmentation systems capable of performing in the dynamic conditions of the fr

    Jan 21, 2025

  • ISEE
    Detection of the Initiation Sequence Using EMF at the Yanacocha Mine in Perú.

    By Romel B. Villanueva

    At the Yanacocha gold mine, in the Andes of northern Perú, the first instrumental tests were carried out in October 2019 to detect the initiation sequence of a production blast by detecting the EMF si

    Jan 21, 2025

  • ISEE
    Seismic study to understand the pre-splitting filter capacity

    By Julio Cesar Barbosa de Freitas, Rafael Gonçalves Araujo, Túlio Soares, Jair Koppe, Augusto Ferraz Ribeiro, Pedro Barreto Garcia

    This study thesis was motivated by the fact that it is of fundamental importance for open pit mining that the slopes initially have a geometry in accordance with what is proposed in the mining plannin

    Jan 21, 2025

  • ISEE
    Explosives Safety and Security

    By Joseph A. Meyers

    NYC has always been a high-profile target for both foreign and domestic terrorists. Explosives have always been the go-to tool for terrorists to bring about serious physical injury, death, and propert

    Jan 21, 2025

  • ISEE
    Paper or Electronic Records – Ways to Improve Blast Documentation and Recordkeeping

    By Travis A. Davidson, Ralph E. Burnham, Cathy Aimone-Martin, J. Kelly Ratliff

    Blasters face a long list of tasks to execute daily—from vehicle inspections to blast design and layout, hole loading and tie-in, securing the site, and finally, safely executing the blast. Good pract

    Jan 21, 2025

  • ISEE
    New Methodology for Excavation of High Drawbells With Pre-Loading.

    By Guillermo Lazcano Ríos, Jorge Parvez Aguirre, Alejandro G. Díaz Berríos, Felipe Rodriguez Alveal

    Codelco's Chuquicamata Underground Division (DCHS) faces issues due to collapses in its subsidence streets, which hinders the advancement of the subsidence front and leads to the loss of areas and res

    Jan 21, 2025

  • ISEE
    Electronic Detonator Timing Approaches for Surface Quarries and Metals Mines

    By Tristan Worsey, Nathan Rouse, Evan Thibaud

    Electronic detonators allow for variability and accuracy with blast delay selection and timing sequence. However, a single published guideline for selection of electronic timing delays is not availabl

    Jan 21, 2025

  • ISEE
    Evaluating Explosive Type and Water-Casing for Demolition Kicker Charges

    By Rachel L. Bauer, Catherine E. Johnson

    Explosive demolition involves first, the use of cutting charges to sever a column and second, kicker charges to move it out of alignment. Dynamite is the traditional explosive used in kicker charges a

    Jan 21, 2025

  • ISEE
    Control of the Flyrock and Vibrations for the Protection of Electrical Installations

    By Jorge Cárdenas, Piero Mejía, Diego Gamarra

    The present case study details the solution to a complex situation in a mining operation, involving the challenge of expanding the tailings storage facility in high-criticality areas adjacent to elect

    Jan 21, 2025

  • ISEE
    Use of Visualization Tools for Drill and Blast Activities

    By Carlos Alvarado, Hernan Narea, Jhon Silva, Bryan Townsend, Katherine Gil, Brayan Caceres, Felipe Pontanilla

    With the promising development of new technologies, automation in Drill and Blasting (D&B) is on the horizon. The data generated in all D&B activities, which is currently segregated, can be linked to

    Jan 21, 2025

  • ISEE
    Multivariate Scaling Approach for Laboratory Scaled Rock Blasting

    By Dr. Kyle Perry, Ryan Sibley

    Rock blasting is an inherently difficult field to quantify independent & dependent variables and the specifics of how the energy interacts with the material for a number of reasons. Independent variab

    Jan 21, 2025

  • ISEE
    Implementation of a Remote Blasting Engineering Center in Peru

    By Jorge Cárdenas, Luis Huaroc, Máximo Cari, Nestor Delgado

    In Peru, after four years of pandemic, some mining companies have chosen to install integrated operating centers in central offices where through network technology and video surveillance it allows th

    Jan 21, 2025

  • ISEE
    A Holistic Approach to Developing a Narrow Cutback at an Open Cut Copper Mine

    By Stephen Mansfield, Nathan West, El Khalil Seyed

    In October 2017, a multi-bench failure occurred in the east wall of the Guelb Moghrein copper and gold mine in Mauritania. The failure extended 100 m (328 ft) vertically and horizontally and resulted

    Jan 21, 2025

  • ISEE
    Optimizing Drill and Blast Parameters for Enhanced Fragmentation and Cost Efficiency in Open Pit Mines.

    By Shadrack Nuamah, Erik Westman, Bright Afum, Jesse Addy

    Rock fragmentation is the most critical aspect of hard rock production blasting due to its significant impact on drilling and blasting costs and the economics of subsequent loading, hauling, and crush

    Jan 21, 2025

  • ISEE
    Optimized Blasting Methods for TBM Launching Shaft Construction Beneath the Panama Canal: A Case Study

    By Jose Pineda, Abraham Lindo

    The Panama Metro System’s Network expansion involves excavating a launching shaft for a tunnel boring machine (TBM) to traverse beneath the Panama Canal. The blasting needed for this shaft constructio

    Jan 21, 2025

  • ISEE
    The Thermal Basis for Explosive Decomposition with Heat due to External heating or reactive ground

    By Alastair Torrance, Gary Cavanough

    Over the past two years a research project has been performed on reactive and hot ground. A key finding is that host materials including carbonates and coal are inhibitors to the reaction of sulphide

    Jan 21, 2025

  • ISEE
    Improved Drill and Blast Designs Free $3.6M of Ore for Surface Copper Mine Tacio Ferreira, Dyno Nobel

    By Tacio Ferreira

    A surface copper mine in the Western United States faced challenges in recovering rock and ore from final walls because of geotechnical constraints that require restrictions on methods for loading bla

    Jan 21, 2025