    A Discrete Element Code for Diggability Analysis

    By Stephen Chung

    The quality of a blast design can be evaluated in many ways. It may involve fragmentation, muck profile, environmental effects in terms of vibration and the excavation of the blasted material. To assi

    Jan 1, 2008

  • ISEE
    Ammonium Nitrate Blasting Agents Quality Testing for Maximum Benefit

    By Philip H. Porter

    Ammonium nitrate blasting agents continue to be the work-horse of the explosives industry. The versatile, low-cost, anfo products, whether packaged, poured, or bulk, continue to produce superior resul

    Jan 1, 1984

  • ISEE
    Predicting the Envelope of Damage Resulting from the Detonation of a Confined Charge

    By Jason M. Ryan, T Michael LeBlanc, John H. Heilig

    "Drill trajectory deviation is a recurring problem in vertical retreat stoping operations. As a result of thisdeviation, 60 kilogram (165 millimetre diameter) and 103 kilogram (203 millimetre diameter

    Jan 1, 1996

  • ISEE
    The Benefits of Electronic Blasting Systems for Use in UG Mass Pillar Blast Design

    By Felix Torres

    CVRD is one of the largest mining companies in the world. Adoption of new technology and improving operational efficiency are top company priorities. Initiatives in these areas have driven continuous

    Jan 1, 2003

  • ISEE
    Implementation of Electronic Detonators at Barrick Goldstrike Mines, Inc

    By Roy McKinstry, Mark Rantapaa, Thomas Bolles

    In March of 2001 Barrick Goldstrike Mines, Inc. began evaluating the potential benefits of electronic detonators at the Betze Post open pit gold mine. The original evaluation focused on increased frag

    Jan 1, 2004

  • ISEE
    Analysis of Environmental Effects Induced by Cautious Blasting During the Excavation of Istanbul Subway Construction

    By Ali Kahriman, Abdulkadir Karadogan, Alper Celtikci, Ahmet Varol, Ertugrul Kaya, Turgay Ozat

    This paper presents analysis of environmental effects induced by cautious blasting during the construction of the Istanbul Subway 4 Levent - Ayazaga Darulsafaka Metro Tunnel Project carried out by the

    Jan 1, 2011

  • ISEE
    Pre-Blast Surveys and the Importance of Photographic Technique

    By James Ballard, Charles H. Dowding

    Recent Office of Surface Mining regulations have called for pre-blast surveys of residences within one-half mile of blasting. Unless lighting effects and the multiple origins of cracks are recognized,

    Jan 1, 1979

  • ISEE
    Defining and controlling the environmental impacts of blasting at a major opencast coal mine

    By D. Mason, W. J. Birch

    Blasting operations are arguably one of the most contentious areas of surface mining.Many operators carry out outine monitoring as required by Mineral Planning Authorities. However in so doing they on

    Jan 1, 2011

  • ISEE
    Digital Imaging Techniques for Blasting Process Evaluation in Field

    By Stephen H. Chung

    Direct visualization of rock movement during blasting is an important key to understanding the blasting process, as well as optimizing blast designs and explosives performance. To achieve this, a digi

    Jan 1, 1996

  • ISEE
    Probable Causes of Explosives System Malfunction in Blasting

    By B Mohanty, G Yamin

    A number of parameters, aside from blast design and pre-existing rock conditions, can change the performance of the explosives system in actual blasting practice. Sympathetic pressures caused by deton

    Jan 1, 2005

  • ISEE
    Diagnosing and Modifying Off-Site Blast Effects by Seismic Means - A Case Study

    By Stuart Brashear, Robert Brush, Ben Cook

    In early 1993, the Piney River quarry owned and operated by the Blue Ridge Stone Corporation of W W? Boxley received a series of complaints from the owners of a 130 year-old historic farmhouse that ha

    Jan 1, 1996

  • ISEE
    Application of Computer Blast Modeling to Oil Shale Mining

    By P J. Hommert, D S. Preece

    "Commercial development of the United States Oil Shale reserve will require substantial amounts of mining. In fact, even a modest 500,000 barrels per day industry requires a mining effort equivalent t

    Jan 1, 1989

  • ISEE
    Journal: Kaiser Plant Demolition / Smokestack Demolition at port of Tacoma, Washington

    By Walt Meglasson

    The Kaiser Aluminum Company Smelter, one of several in the Pacific Northwest, was built in 1942 and operated by the Olin Company during World War II and then purchased by Kaiser Aluminum after the war

    Jan 1, 2008

  • ISEE
    Reduced Explosive-Mass and Damaged Detonator Performance Tests

    By Michael S. Wieland

    Delay detonators that are damaged by cross-hole wave interactions degrade blasting work and raise the risk of incidents. Damaged detonators impose risk, because they can retain sensitive explosives th

    Jan 1, 1997

  • ISEE
    Utilising a Dual Belly Auger MPU to Manufacture Bulked Inhibited Explosives

    By Jason Rock, Rob Thompson, Lee Julian

    Reactive ground is ground that undergoes a spontaneous exothermic reaction after it comes into contact with nitrates. This is commonly caused by inert rock hosting sulphide minerals, such as pyrites t

  • ISEE
    Blast Fragmentation for Maximising the Sag Mill Throughput at Porgera Gold Mine

    By Alex Jankovich, Darren Thornton, Sarrna Kanchibotla, Cam Grundstrom

    The Porgera joint venture and Dyno Noble have commissioned a joint project to optimise the drill and blast operations to increase the overall profitability of the mine. One of the aims of this project

    Jan 1, 2001

  • ISEE
    Effect of Impact on Pre-Squibbed Fireworks

    By Paul Worsey, Yasutaka Dote

    The choreography of large fireworks displays dictates electric initiation for precise timing. It has been common practice to pre-squib products before transportation for reducing set up time. A number

    Jan 1, 2009

  • ISEE
    Controlled Blasting for Underground Mining

    The most common method for identifying the potential for blast damage is the peak particle velocity. But this can depend on many factors such as the type of blast, explosive, confinement, timing and t

    Jan 1, 1987

  • ISEE
    Summer Internship Project at an Underground Gold Mine

    By Tristan Worsey

    This work was performed during the summer of 2008 during the junior year of a BS in Mining Engineering. It was observed that the mine was having a problem with back break during the blasting of develo

    Jan 1, 2010

  • ISEE
    Cast Blasting in the Light of the Electronic Option

    By Winfried Rosenstock

    The development of electronic initiation systems has partially reached or will reach in a short period of time full reliability for general use without limitations. Unfortunately those systems meet wi