Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • ISEE
    Prediction of Ground Vibrations Using Neural Network in a Peruvian Mine

    By Pavel A. Torres, Darwin Torres, Sandro Huaman

    Given the limited efficiency of blast-induced ground vibrations prediction empirical models, due to the complex geological system from a Peruvian mine. An artificial neural network was built in order

    Feb 1, 2020

  • ISEE
    On Board Excavator Dilution Detector

    By Benjamin Cebrian

    The new technology presented in this paper is a patented system that is installed on board excavators (backhoe or front shovel types). Several control points are set along ore/waste contacts and their

    Feb 1, 2020

  • ISEE
    Table Of Contents 2020 General Proceedings

    By NA NA

    Copyright © 2020 International Society of Explosives Engineers

    Feb 1, 2020

  • ISEE
    Using Digital Electronic Detonator of Blasting LS and LDT Buildings

    By Zheng Deming, Li Hongwei, Lei Zhan, Dai Chunyang

    This paper introduces the application of a digital electronic detonator in the demolition blasting of largescale (LS) and long delay time (LDT) frame-shear structure buildings. The whole building to b

    Jan 1, 2019

  • ISEE
    High-Order Numerical Methods and Reaction Rate Law for Non-Ideal Detonation Modeling

    By Eduardo Lozano, Vilem Petr

    This study demonstrates the ability of high-order, shock-capturing methods to simulate detonation wave propagation in right circular cylinders of non-ideal explosives. 2-D axisymmetric, reactive Euler

    Jan 1, 2019

  • ISEE
    Delineating Extent of Cracks in Post-Blast Rock Surface Using GPR – A Case Study

    By Sayantan Chakraborty, Kaushik Dey, SaKaushik Dey tyabrata Behera

    Drilling and blasting is a popular excavation technique in the drift of underground mine. Faster completion of drift reduces the gestation period and thus longer blast pulls are attempted with longer

    Jan 1, 2019

  • ISEE
    Using Artificial Intelligence and 3D Imaging for Real-time Fragmentation Analysis on Conveyor Belts

    By Ronald Ticona, Anaani Huaman, Andrea Lucero

    Mine-to-mill optimization begins with a clear understanding and ongoing assessment of blasting, crushing, and grinding operations. Modification of blasting practices to optimize feed size can increas

    Jan 1, 2019

  • ISEE
    New Development of Gassed Emulsion Explosive for Cost Optimization and Environmental Control

    By Yessica Idrogo, Omar Gómez, Francisco Pérez, Eduardo Yrigoyen

    Rock blasting is one of the most important operations in the mining cycle value chain, requiring optimized explosives mixtures to get good results. A new and better strategy, and that which is discuss

    Jan 1, 2019

  • ISEE
    Epic Blast of 275 US Ton (250 tonnes) Sets Benchmark in Opencast Mining Arena in Environmental Sensitive Area With Desired Fragmentation and Muck Profile.

    By Tapas Kumar Mukherjee, Sujit Kumar, Sanjay Kumar Singh

    This paper dwells on the epic blast conducted at Tata Steel’s captive coal mine in India and the insights drawn from it. Optimal blast design parameters had to be ascertained for operating benches (6.

    Jan 1, 2019

  • ISEE
    Vertical Attenuation of Blast Vibrations

    By Catherine T. Aimone-Martin, Brent Meins

    Blast vibration monitoring for buried pipelines is typically conducted at the ground surface with a shallowly buried geophone. In many jurisdictions across the U.S., blast-related vibration limits se

    Jan 1, 2019

  • ISEE
    OPEX Improvement From Migrating to GPS Guidance and Digital Drill Patterns

    By Jose A. Sanchidrián, Ricardo Castedo, Pablo Segarra, Juan Navarro

    A study conducted at a mine site that used traditional field surveying and physical hole spot markings bench marked their combined drill and blast performance. The analysis of the operational expendit

    Jan 1, 2019

  • ISEE
    Presplit Assessment by Signature Hole Blast Vibration with Accelerometer Measurement

    By Remi Proulx, Ruilin Yang

    The effectiveness of presplit in soft or fractured ground is hard to visualize or quantify. There have been many attempts by the blasting community to measure and quantify the effectiveness of prespli

    Jan 1, 2019

  • ISEE
    Seed Wave Modeling to Natural Caves Protection in Mining Operations

    By Alejandro Rosario, Ricardo González

    The restrictions imposed by the Brazilian environmental legislation regarding natural caves lead to a block of substantial amount of mineral reserves. Mining activities can released caves, as long as

    Jan 1, 2019

  • ISEE
    Are Electronic Initiation Systems the Unique Answer to Solve Blasting Issues?

    By Jesus A. Pascual de Blas

    After 30 years of development and introduction, electronic initiation systems are now well established in blasting applications, both mining, quarrying and civil works. In terms of blast technology, i

    Jan 1, 2019

  • ISEE
    Debris Collection Efforts Following a Large-scale AN Detonation

    By P. E. Hoffman, Joshua Ph. D.

    The Institute of Makers of Explosives (IME) led a post-detonation debris collection project in conjunction with a large AN railcar detonation conducted by the Department of Homeland SecurityTransporta

    Jan 1, 2019

  • ISEE
    The Use of Blast Modeling Software for Educational Purposes

    By Andrea Brickey, Ethan Marcoux

    The South Dakota School of Mines and Technology (SD Mines), located in Rapid City, South Dakota, is one of only a few universities in the United States that offer a Bachelor of Science in Mining Engin

    Jan 1, 2019

  • ISEE
    E7B Sector Drilling and Blasting Challenges and Learnings

    By Robert Jacob Cefalo, Rio Tinto Kennecott

    At the end of 2016, the Mine started a new ore phase in the section of the pit located on the East Wall. The East Wall geological structures required controlled blasting for peak particle velocity (PP

    Jan 1, 2019

  • ISEE
    Detonator Safety Relation to Measurement Errors

    By James G. Stuart, Tassilo N. Baur

    We will discuss the kind of procedure that we use to predict the no-fire (for safety) and all-fire (for reliability) current levels for any given type electric detonator. The basic idea is to expose s

    Jan 1, 2019

  • ISEE
    Drill and Blast Digitalization

    By Ricardo Dr. Chavez, Mathieu Lachamp, Rob Dr. Farnfield

    Pueblo Viejo is an open pit gold mine in the Dominican Republic which is always looking forward to implement the newest technology in the industry to improve all processes. Focusing on one of the pill

    Jan 1, 2019

  • ISEE
    Borehole Deviation Control Using Electronics: An Euler’s Approach

    By Francisco Sena Leite, Pedro Brito, Gean Frank, PhD Soeiro de Carvalho, Jose, Vinicius Miranda

    The consequences of rock blasting with explosives are directly related to the accuracy of drilling and, because they have an effect on fragmentation and ground level, they should be controlled to ensu

    Jan 1, 2019