Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Double Deck Blasting for Rapid Tunnel Advance in Hong Kong
By Rohan Stevens, Katsuhiro Kameyama, Osamu Iwata, Jinming Liao
In densely populated cities such as Hong Kong, where unoccupied space is becoming more valuable as the population grows, city planners are more often looking to underground space to meet the increasin
Jan 1, 2013
-
Downstream Benefits of Optimized Drilling
By Kevin Landey, Eric Gerst
Expanding blast patterns to near the limit of an explosives’ ability to do the necessary amount of work is a common practice to reduce drilling and blasting costs. Choosing less expensive explosives s
Jan 1, 2018
-
Drawbacks of Blast Vibration Regulations
By Mark Svinkin
The purpose of this paper is to present an overview of recommended existing criteria of ground vibrations generated by blasting. It is shown that these criteria have limited liability because they wer
Jan 1, 2003
-
Dri-Gel Explosives
By Mike Zimmermann
With the steady decline in the production of dynamites throughout the world, a gap appeared in the market which could only be adequately filled by rigid paper packaged explosives. To fill this need, t
Jan 1, 1998
-
Drill & Blast Optimization in India an Economic & Environmental Review
By C. Navalkar
Systematic drilling & blasting techniques are currently being viewed in the mining & construction industry as a correct 8z scientific approach for optimization process in rock excavation, as drill & b
Jan 1, 2001
-
Drill Accuracy
By Jerald E. Harris
"Often taken for granted, drill accuracy plays a major role in the relative success or failure of a blast.Expensive technological advances in equipment capabilities, drilling tools, communications, ex
Jan 1, 1999
-
Drill and Blast Digitalization
By Ricardo Dr. Chavez, Mathieu Lachamp, Rob Dr. Farnfield
Pueblo Viejo is an open pit gold mine in the Dominican Republic which is always looking forward to implement the newest technology in the industry to improve all processes. Focusing on one of the pill
Jan 1, 2019
-
Drill and Blast Improvement Project Using Photogrammetry, GPS and Drill Navigation Systems
By Tamara Wiseman, David Stewart
"A Quarry located in Georgia is a green-field site established in 2011. The quarry lies in the eastern part of the Georgia Piedmont area. It is within a distinctive, northeast-trending belt of relativ
Jan 1, 2017
-
Drill and Blast Instrumentation for Troubleshooting Underground Up-Hole Stoping
By Braden Lusk, Tristan Worsey, Nathan Rouse, Kyle Hall
Loading explosives up hole has challenges that are typically not seen in down hole explosive loading. Most explosives applications are not up hole. Lack of experience and technology can cause signific
Jan 1, 2018
-
Drill and Blast Optimization at the Sparkhule Limestone Quarry
By Paul L. Matrin
This paper will discuss the recent and on-going drill and blast optimization measures at the Sparkhule Limestone Quarry, which have resulted in a 44% reduction of drill and blast unit costs per ton of
Jan 1, 2004
-
Drill and Blast Trial Planning During Drill-Mill Optimization Project
By Tristan Worsey, John Henchion, Nathan Rouse, Yannick Lauras
"This paper presents an approach used to plan and evaluate drill and blast trials for a mine that currently mechanically excavates in-situ rock. The document presents the approach used to plan the tri
Jan 1, 2017
-
Drill Monitoring & Navigation Systmes at BHP Billiton's Navajo Mine
By John Vynne
BHP’s Navajo coal mine installed drill monitoring and high precision navigation systems on their three overburden drills during 2002 and 2003. Details of the DrillNav system hardware and reporting sys
Jan 1, 2007
-
Drill Monitoring and GPS Developments and their Impact on the Drill to Mill Process
By John Vynne
Too often, a mine’s operations, including drilling, blasting, loading, hauling, crushing, processing, etc., are considered independent steps, rather then a continuous process. In fact, these are inter
Jan 1, 2001
-
Drill Monitoring and GPS Developments and their Impact on the Drill to Mill Process
By John Vynne
Too often, a mine’s operations, including drilling, blasting, loading, hauling, crushing, processing, etc., are considered independent steps, rather then a continuous process. In fact, these are inter
Jan 1, 2000
-
Drill Monitoring Systems and the Integration with Drill and Blast Software
By John Vynne, John Hutchings
There have been a number of recent technological advances in instrumentation for blasthole drills, and more specifically in drill monitoring and HPGPS guidance systems. Likewise, great strides have be
Jan 1, 2011
-
Drill/Blast Hands-On Teaching
By D Reid Watson
A unique blend of theory and hands-on teaching of blast hole drilling and explosives technology is being provided at a Canadian Community College. Students graduate at an apprentice level quite capabl
Jan 1, 1987
-
Drilling & Blasting of a Small Diameter Shaft Next to Historic Structure
By Corry Goumans, Ron J. Elliot
This paper discusses the challenges encountered in drilling and blasting of a small diameter shaft underneath a parking garage in historic Gastown, Vancouver, BC. This project involved drilling in a r
Jan 1, 2004
-
Drilling and Blasting a Complex Underground Ore Block
By Paul V. Sterk, James Wieser
Mining in underground situations requires constant change due to changing ore bodies and economics. The Homestake Mine in its 122 years of existence has gone through numerous changes due to these fact
Jan 1, 1999
-
Drilling and Blasting in Environmentally Sensitive Areas
By William Clark, Rick Taylor
"Ajax Contracting was awarded the project to drill, blast and crush 100,000 tons of quarryrock for the Forest Service In Elk City, Idaho, during the summer of 1992. This projecttakes place in an area
Jan 1, 1993
-
Drilling and Blasting in Hot and Reactive Ground Conditions at Barrick Goldstrike's Meikle Mine
By D. Scott Scovira, Remi Proulx
The Meikle Mine is a high grade, underground gold mine utilizing primary-secondary longhole open stoping with delayed backfill to produce 3000 stpd of ore. Hot and reactive ground conditions were enco
Jan 1, 2000