    Deep Water Blasting on the River Nile in Southern Egypt

    By Rob Grant, Manuel Lopez Cano, Mike Briggs, Ken Fletcher

    The scorched desert sands and life giving waters of the River Nile in Egypt have been the back drop to awe inspiring engineering feats for over 4,700 years. The latest engineering marvel to grace the

    Jan 1, 2004

  • ISEE
    Deep water excavation with shaped charges: a case history in Lake Mead, Boulder City, Nevada, USA

    By Roberto Folchi, Hans Wallin

    Lake Mead, the largest man-made reservoir in the United States, is located about 30 miles southeast of Las Vegas, Nevada. For the construction of Lake Mead third water intake, which is entirely placed

    Jan 1, 2012

  • ISEE
    Deep-hole Controlled Blasting in Reconstruction Railway Cutting

    By He Guangyi

    During rock blasting in extending deep cutting from Jiu Li Mountain to Dong Zhuang Village in Jiao Zhi Railway line, we have drilled deep hole with large scale diving drilling machine and successfully

    Jan 1, 1997

  • ISEE
    Defending a Blasting Case at Trial ROSAS v.AZTEC HOMES

    By Sean Cahill

    The Blasting In the summer of 1999, a Southern California drilling and blasting company conducted blasting as part of the grading operations at the Highlands Ranch development in San Diego, California

    Jan 1, 2003

  • ISEE
    Defining and controlling the environmental impacts of blasting at a major opencast coal mine

    By D. Mason, W. J. Birch

    Blasting operations are arguably one of the most contentious areas of surface mining.Many operators carry out outine monitoring as required by Mineral Planning Authorities. However in so doing they on

    Jan 1, 2011

  • ISEE
    Defining Detonation Energy Fro Practical Blasting

    By Claude Cunningham

    Simple bulk energy rating of explosives obscures the realities of how these deliver their energy, and diverts attention from the key question of controlling blasting results. Explosive performance is

    Jan 1, 2002

  • ISEE
    Deformation of An Explosively Driven Flat Metallic Flyer During Projection

    By Seokbin Lim

    In the design of explosives devices, an understanding of the behavior of explosively propelled matter is one of the most important steps in maximize the performance of these devices. For instance, an

    Jan 1, 2010

  • ISEE
    Degree of Rock Fragmenjation Under High Strain Rates

    By U. Prasad

    This paper summarizes the investigation carried out on a wide range of rock types, subjected to high velocity impact to simulate explosive action. A Split- Hopkinson Bar apparatus was used to generate

    Jan 1, 2001

  • ISEE
    Delay Blasting Cap Corrosion of the Nonel by Acid Water

    By Noelia Valencia, Carlos Agreda, Jean Arenales, Juan Llerena

    "In this technical paper is reported the several tests and the preliminary results that has been obtained so far. It must be emphasized that this investigation was started several months ago.On the ot

    Jan 1, 2016

  • ISEE
    Delay Timing and Vibration Characteristics at Low-Frequency Mine Sites

    By D E. Siskind

    The Bureau of Mines performed a comparative study of nine sites at eight surface coal mines to determine if the presence of near-surfaced underground abandoned workings resulted in the generation of a

    Jan 1, 1990

  • ISEE
    Delicate Demolition - Bizarre Tragedy Leads to Record-Setting Blast in Canada

    By Brent Blanchard

    An emergency demolition project related to a bizarre plane crash has reportedly set a new world record for the tallest structure ever explosively demolished. On Sunday, April 22, 2001, 38-year old Gil

    Jan 1, 2002

  • ISEE
    Delineating Extent of Cracks in Post-Blast Rock Surface Using GPR – A Case Study

    By Sayantan Chakraborty, Kaushik Dey, SaKaushik Dey tyabrata Behera

    Drilling and blasting is a popular excavation technique in the drift of underground mine. Faster completion of drift reduces the gestation period and thus longer blast pulls are attempted with longer

    Jan 1, 2019

  • ISEE
    Deltadet System from Delta Cap

    By Kevin Dunfield

    The Deltadet System is composed of: The Deltadet II electronic Detonator. A Field Terminal to create, modify or simply execute an existing blasting sequence. The radio remote controlled option is comp

    Jan 1, 2004

  • ISEE
    Demolition Blast of Heavily Reinforced Concrete Slab on Impermeable Layer

    By Ye Yuan, Jaak Daemen, Shaguo Yuan

    ABSTRACT: A 400m2 (480 yd2) heavily reinforced high-strength concrete slab 800mm (31 inch) thick had to be demolished. Underneath it was a 300mm (12 inch) thick underlying structure consisting of thre

    Jan 1, 2010

  • ISEE
    Demolition by Controlled Blasting of a Building in Cadiz (Spain)

    In this work, is being described the developing of the study for the demolition by controlled blasting project of a building of reinforced concrete, in the center of a spanish city. Synthetically, it

    Jan 1, 1977

  • ISEE
    Demolition of a Storehouse by the Blasting and the Simulation of the Demolition by DDA Method

    By Kunihisa Katsuyama, Yuji Ogata, Yuji Wada

    The one free surface blasting of a concrete block was simulated by Discontinuous Deformation Analysis(DDA) method. Comparing the simulated results with the concrete block blasting experiment, the crac

    Jan 1, 1996

  • ISEE
    Demolition of Churchill House in Belfast, Ireland

    By Dick Green

    During the recent troubles in Northern Ireland due to terrorist activities, there have been many buildings demolished or damaged by improvised explosives. This article explains about the Demolition of

    Jan 1, 2006

  • ISEE
    Demolition of Old Bridge Piers ByBlasting

    By S. Mandal, R. Singh

    The demolition of structures with explosive though most rapid, safe and efficient requires planned blast design parameters with respect to geometric and strength properties of the structure to be demo

    Jan 1, 2001

  • ISEE
    Demolition of Reinforced Concrete Bridges during Reconstruction of the Motorway Zagreb-Krapina

    By Goran Cirkovic, Zvonimir Ester, Josip Krsnik

    During the reconstruction of the motorway Zagreb-Krapina three reinforced concrete bridges were demolished, for their width was not adequate for the new motorway. Demolition of the three bridges was c

    Jan 1, 1997

  • ISEE
    Demolition of the ADMP-1 Jackup Platform for Aramco in the Arabain Gulf

    By J S. Brower

    Disposing of the AMDP-1, Jackup drilling rig in the Arabian Gulf.

    Jan 1, 1978