    Production And Testing Of 600 Reinforced-Concrete Piles For The Central Bank Of Iraq

    By H. Meseck

    The new building of the Central Bank of Iraq in Baghdad was footed in difficult underground conditions on more than 600 reinforced concrete driven piles, with cross-sectional diameters of 45 x 45 cm a

    Jan 1, 1989

  • DFI
    Evaluation For Stone-Column Composite Foundation In Rayleigh Wave Method

    By Zhang Baoshan

    In this paper, the forced features and dynamic behaviors of stone-column composite foundation are concisely related. The characteristics of Rayleigh wave method is summarised. This method is proposed

    Jan 1, 1991

  • DFI
    Experience Gained At The Application Of Atlas Piles In Poland

    By Kazimierz Gwizdala

    In recent years, in Poland the ATLAS piles have been successfully applied for some constructions near Gdansk. The piles have been used as foundations for housing and another areas of civil engineering

    Jan 1, 2006

  • DFI
    Deep Caisson Foundations In China ? Synopsis

    By C. Y. Liu

    This paper principally deals with the application of caisson foundation in the Chinese bridge building industry, the different types of caisson foundation adopted, and their spheres of application. Ca

    Jan 1, 2010

  • DFI
    A Case Study Of A Vibratory Pile Installation Monitoring Of A Precast Prestressed Concrete Pile

    By K. Viking

    It's well known that conventional impact hammers, usually are the method to use in order to drive precast prestressed concrete piles. However sometimes the vibratory technique might be considered

    Jan 1, 2004

  • DFI
    Construction Of A Deep Basement On A Sloping Site In Glasgow: The Aurora Project

    By H. Boghosian

    This paper presents the design and construction of a deep basement in a steeply sloping site in glacial till in Glasgow city centre. Existing foundations, adjacent structures and services, in tandem w

    Jan 1, 2006

  • DFI
    Technical Visit

    By the courtesy of Metropolitana Milanese (Milan Underground), roost of the delegates visited on April 12, 1991 the tunnel of "PORTA VENEZIA" STATION of MILANO RAILWAY LINK. The "PORTA VENEZIA" ST

    Jan 1, 1994

  • DFI
    Drilled Pile Design and Installation Challenges in an Urban Environment

    By Satyajit Vaidya, Rudolph Frizzi, Luis Berroteran

    This paper presents design and construction challenges associated with a high-capacity rock-socketed drilled pile foundation system for a 60-story building recently constructed in an urban environment

    Jan 1, 2018

  • DFI
    Negative Drag - A Practical Example - Synopsis

    By A. Verghese Chummar

    The paper presents a field study where the effect of negative drag caused the failure of a pile foundation system. Utilising the field observations the probable negative drag that acted on the piles i

    Jan 1, 1996

  • DFI
    Incorporating Set-Up Into Reliability-Based Design Of Driven Piles In Sandy Soils

    By Luo Yang

    It has been known that after initial pile driving, pile capacity gain over time (set-up) could constitute a significant portion of the total pile capacity. In the past, there has been very little guid

    Jan 1, 2006

  • DFI
    Execution of Diaphragm and Cut-Off-Walls in Rock – Applications, Performance and Limits

    By Albert Neumann, Franz-Werner Gerressen, Giancarlo Santarelli

    "Diaphragm walls are known as underground structural elements commonly used for retention systems and permanent foundation walls or elements. In addition they are also quite often used as deep groundw

    Jan 1, 2016

  • DFI
    Uplift Capacity Of Drilled Piers In Clay - Synopsis

    By Braja M. Das

    Laboratory model test results for the ultimate uplift capacity of square and circular foundations in saturated clay (ø=0) have been presented. The results of the present model tests for square foundat

    Jan 1, 1987

  • DFI
    A Comparison Of Open Drilled Shafts To Temporarily Cased Drilled Shafts In Clay Soil

    By W. Tom Witherspoon

    Many Engineers are skeptical and cautious about skin friction factors for the portion of drilled piers where temporary casing is used. This has led Texas engineers in many cases to eliminate skin fric

    Jan 1, 2009

  • DFI
    Augered Cast-In-Place Piles: Regional Project Profiles - Community Osteopathic Hospital Harrisburg, Pa

    GENERAL CONTRACTOR: ALEXANDER CONSTRUCTORS, INC. STRUCTURAL ENGINEER: CAGLEY & ASSOCIATES, INC. GEOTECHNICAL ENGINEER: F.T. KITLINSKI & ASSOCIATES, INC. PILE FOUNDATION CONTRACTOR: L.G. BA

    Jan 1, 2001

  • DFI
    Supported Excavation Movement Causing Lateral Displacement and Cracks in Drilled Shafts - Lessons Learned from a Case Study in Chicago

    By Eric R. Borys, Amaneh E. Kenarsari, Brett Gitskin

    This case study discusses impacts of excessive Earth Retention System (ERS) lateral movement at a project in city of Chicago. The ERS (cantilevered sheeting) moved inward towards the excavation and ca

    Jan 1, 2018

  • DFI
    Sunrise Powerlink: An Innovation in Foundation Design

    By Steve Davidow, Nick Salisbury

    "The Sunrise Powerlink project received numerous industry awards for excellence. The DFI C. William Bermingham Innovation Award recognized the innovative use of prefabricated steel micropile caps to i

    Jan 1, 2014

  • DFI
    Aseismic and Anti-Tsunami Upgrades of Existing Coastal Levees and Seawalls in High Risk Regions

    By Takefumi Takuma, Hiroyuki Nishimura, Shigeru Kambe

    "Japan’s Great Tohoku Earthquake and the immediately following tsunami of March 11, 2011 killed more than fifteen thousand people and destroyed numerous buildings and infrastructures in the northeaste

    Jan 1, 2017

  • DFI
    A Study Of Failure Mechanism And Uplifting Capacity Of Tension Pile Foundation ? Synopsis

    By K. J. Yang

    Based on investigations and model tests combined with pile foundation on Code compilation of drydocks, we present this report to give informations against uplift pressure of piles beneath floor of dry

    Jan 1, 2010

  • DFI
    Case Histories of Arch Action Low Improvement Ratio Cement Column Method (ALiCC Method)

    By Jun Ohbayashi, Yoshiyuki Yagiura, Hiroaki Miyatake, Masuo Kondoh, Naotoshi Shinkawa

    "Reducing the improvement ratio of ground improvement is an extremely efficient way to reduce the construction cost and construction period of mitigation measures for soft ground. The Arch Action Low

    Jan 1, 2015

  • DFI
    Large Diameter Drilling Operations Of Multi Head Down The Hole Hammer Drill Through Boulders And Granite - Mach Drilling System And Some Construction Examples

    By J. Nakayama

    Construction of foundation piles or diaphragm walls through rocky or boulder containing formations has been long-standing difficulty. It has been widely understood that the down-the-hole hammer is t

    Jan 1, 1989