    Case History: Estimating Ground Vibrations Caused By Pile Driving

    By Tracy Brettmann

    A new method for estimating ground vibrations caused by pile driving was developed as a result of a vibration monitoring program performed for a large pile driving project. The method is accurate, rat

    Jan 1, 1999

  • DFI
    Case History: Innovative Load Test Program Optimizes Pile Capacity In Challenging Ground Conditions

    By Emad Farouz

    This paper presents a case history of a successful construction-phase pile load test program that optimized the pile design in challenging ground conditions at the Great Neck Wastewater Treatment Plan

  • DFI
    Case History: Innovative Load Test Program Optimizes Pile Capacity in Challenging Ground Conditions

    By Emad Farouz, Francis A. Abreu

    "This paper presents a case history of a successful construction-phase pile load test program that optimized the pile design in challenging ground conditions at the Great Neck Wastewater Treatment Pla

    Jan 1, 2017

  • DFI
    Case History: Large Diameter Micropiles for the Highway 53 Relocation Project

    By Nathan W. Iverson, David S. Graham, Paul J. Axtell

    "The Highway 53 relocation project in Virginia, Minnesota, involves construction of a very tall bridge across a currently inactive iron ore mine pit. The inactive pit is partially flooded and serves a

    Jan 1, 2017

  • DFI
    Case History: Use Of Rock-Socketed Augered Cast-In-Place Piles

    By Tracy Brettmann

    The use of rock-socketed Augered Cast-In-Place (ACIP) piles is new to the Austin and central Texas region. This case history describes the design methodology, load test results, quality control proced

    Jan 1, 1998

  • DFI
    Case Studies Demonstrating The Effectiveness Of Vibroreplacement Stone Columns In Variable Soil Types

    By Lee R. Buhagiar

    As a result of the increased seismic risk and the highly variable geology of Christchurch, finding costeffective foundation solutions has been a challenge for the Canterbury rebuild. The soil profile

    Nov 1, 2022

  • DFI
    Case Studies In Mission Bay, San Francisco: Deep Foundations In Challenging Soil Conditions

    By Lori A. Simpson

    Mission Bay is a 300-acre reclaimed site in San Francisco, California, that is currently being redeveloped. Plans include new neighborhoods, parks, a new University of California, San Francisco, rese

    Jan 1, 2006

  • DFI
    Case Studies Of Driven Tubular Steel Piles In Soils And Basalt On Woolgoolga To Ballina Pacific Highway Upgrade

    By Henry Zhang

    This paper presents two case studies of large diameter driven tubular steel piles for the ongoing Woolgoolga to Ballina Pacific Highway upgrade (W2B). This project forms part of Australia’s largest re

    Nov 1, 2022

  • DFI
    Case Studies/case Histories In Geotechnical Engineerin: Enhancing The Practice In An Interactive Learning Environment

    By Waddah Akili

    This paper describes the steps taken in planning, developing, and executing a case study/ case history course in geotechnical/ foundation engineering at an international university. The paper sheds li

  • DFI
    Case Study of Deep Mix Pile Supported Diaphragm Wall for a Stilling Basin Structure in Malaysia

    By Chandrasegaran, Tamilmani

    "This paper describes a case study of a retaining wall structure using a diaphragm wall to construct a stilling basin at Tanjung Bin T4 power plant in Johor Bahru, Malaysia. The stilling basin is part

    Jan 1, 2015

  • DFI
    Case Study Of Three Bidirectional Static Load Tests For Bored Piles At Sabana Costa Rica

    By Mauricio Coto

    Three bidirectional static load tests (BDSLT) were executed on bored concrete piles, as part of the permanent foundations for two buildings sites located at the Sabana, San Jose, Costa Rica, separated

  • DFI
    Case Study on the Frederick Douglass Memorial Bridge and the use of Large Diameter Open End Steel Pipe Piles, Washington, DC

    By Karl A. Higgins, Michael D. Venezia

    The South Capitol Street Corridor Project is one of the District Department of Transportation’s (DDOT) largest projects, and is currently under construction. This case study will focus on the design o

    Jan 1, 2019

  • DFI
    Case Study: Natomas Levee Improvement Program Cutoff Walls

    By Matthew D. Marks

    The Sacramento Area Flood Control Agency initiated the Natomas Levee Improvement Program in 2006 which would bring the entire 42 mile Natomas Basin perimeter levee system into compliance with applicab

  • DFI
    Case Study: Design, Installation And Quality Assurance Testing Of High Capacity Socketed Piles In A Complex Geologic Environment

    By Thomas M. Caruso

    Construction of a new ship dock at a major Philadelphia area refinery required geotechnical design and field consultation. The new dock, which consists of a system of mooring dolphins and platforms,

    Jan 1, 2008

  • DFI
    Case Study: Feather River West Levee Program Cutoff Walls

    By Kyle R. Lackner, Jared P. Williams

    "The Sutter Butte Flood Control Agency initiated the Feather River West Levee (FRWL) Program in 2010 to bring 35 miles of levee along the Feather River into compliance with applicable Federal and Stat

    Jan 1, 2016

  • DFI
    Case Study: Innovative Soil Nail Stabilization Of A 100 Foot High Urban Slope

    By Mike Fabius

    The Lakehead Region Conservation Authority is responsible for slopes along the Kaministiquia River, one of the largest tributaries to Lake Superior in Canada. After arresting toe erosion for a mile o

    Jan 1, 2006

  • DFI
    Case Study: Large Diameter Helical Pile Foundation for High Voltage Transmission Towers in Soft Glacial Deposits

    By John Dunn, Matt Hawley, Kashif Butt, Nicholas Gura

    "This paper presents the results of a static load testing program completed on helical pile foundations for the replacement of high voltage transmission line tower structures. The foundations were par

    Jan 1, 2017

  • DFI
    Case Study: Load Transfer Analysis on an Instrumented Augercast Pile Using EDC Strain Gauges and Geokon Rebar Strainmeters

    By Sastry Putcha, Santosh Mummaneni, Swamy Avasarala, Vamshi Vemula

    "This paper presents the results from a case study on the comparison of two strain acquisition instrumentation technologies, Geokon rebar strainmeters and Embedded Data Collectors (EDC) for the DC Wat

    Jan 1, 1900

  • DFI
    Case Study: MGM Casinonational Harbor, Washington, DC Displacement Cast-In-Place Piles in Coastal Plain Soils

    By Karl A. H iggins, James P. Racine

    "Displacement Cast-in-Place (DCIP) piles are not a common deep foundation type in the Washington, DC Metro Area market. As a result, less regional data is available for these foundations compared to o

    Jan 1, 2017

  • DFI
    Case Study: Natomas Levee Improvement Program Cutoff Walls

    By Matthew D. Marks

    "The Sacramento Area Flood Control Agency initiated the Natomas Levee Improvement Program in 2006 which would bring the entire 42 mile Natomas Basin perimeter levee system into compliance with applica

    Jan 1, 2017