    Buttressing Berms for Stability of Cantilever Sheet Piles – Limit Equilibrium and Finite Element Approaches

    By Ali Ebrahimi, Meena L. Viswanath, John F. Beech, Mustafa B. Erten, Ming Zhu

    "Excessive deformation of a cantilever sheetpile wall can occur due to dredging, excavation, backfilling, or long-term creep behavior of soil. A buttressing berm constructed in front of the wall can b

    Jan 1, 2016

  • DFI
    Caisson Design And Construction Challenges On The New Tiger Stadium Project - Summary

    By Fritz J. Klingler

    From site demolition, to design, to construction, Detroit's new Tiger Stadium project is required to be completed within a short 2 ½ years from award of the design-build contract. Such extreme sc

    Jan 1, 1999

  • DFI
    Caisson Design And Construction, Upstream Guide Wall, Locks And Dam No. 26

    By E. C. Demsky

    This paper describes the large diameter caisson foundation for the upstream guidewall at the Lock and Dam No. 26 (Replacement) Project. The guidewall is supported on two rows of 1.8-m diameter concret

    Jan 1, 1989

  • DFI
    Caisson Foundation For High Speed Paper Machine ? 1 ? Introduction

    By Anthony H. Tawil

    Modern, high-speed machines used in the manufacture of paper require foundations with stringent settlement constraints. To fulfill this requirement, caisson piles, extending into bedrock, were selecte

    Jan 1, 1987

  • DFI
    Caisson Foundations For Mississippi River Bridges In The New Orleans Area

    By William B. Conway

    This paper will describe the large caisson pier foundations for four of the bridges crossing the Mississippi River in the New Orleans area; and will discuss some of the unusual problems encountered du

    Jan 1, 2013

  • DFI
    Caisson Foundations For Mississippi River Bridges In The New Orleans Area (2e66a216-6dc8-4479-804e-25f5836f407e)

    By William B. Conway

    This paper will describe the large caisson pier foundations for four of the bridges crossing the Mississippi River in the New Orleans area; and will discuss some of the unusual problems encountered du

    May 11, 2007

  • DFI
    Calibration of the Gates Pile Driving Equation for LRFD in Louisiana

    By Glenn J. Rix, Eduardo Tavera, Raphael Siebenmann, Zhongjie Zhang, Robert C. Bachus, Jongwon Jung

    "The Louisiana Department of Transportation and Development (LADOTD) uses a variation of the FHWA-modified Gates equation to verify the nominal pile bearing resistance, typically on smaller projects w

    Jan 1, 2017

  • DFI
    Caltrans Bridge Seismic Design/Retrofit Criteria ? Synopsis

    By Brian Maroney

    In this paper an overview of the California Department of Transportation's (CALTRANS) bridge design criteria is presented. Special emphasis is focused upon seismic design and retrofit criteria. T

    Jan 1, 1993

  • DFI
  • DFI
    Cannonsville Dam Emergency Borehole Response

    By John Vickers, William H. Hover, Paul C. Schmall

    "Any sudden subsurface issue that threatens the stability of existing buildings or infrastructure is cause for immediate investigation and prompt remedial action. Nowhere is this more true than the n

    Jan 1, 2016

  • DFI
    Capacity Of Driven Piles In Sand

    By Mohab Sabry

    Pile foundations are used extensively around the world to support both inland and offshore structures, including important structures such as nuclear plants and oil drilling platforms. The limit of th

    Jan 1, 2006

  • DFI
    Capacity of Hydraulically Jacked Piles

    By Howard A. Perko, Melinda J. Hummel

    "Hydraulically jacked piles, herein referred to as jacked piles, are commonly used for underpinning existing structures to arrest settlement or augment an existing foundation for higher loads. They co

    Jan 1, 2017

  • DFI
    Capacity Of Large Diameter Bored Piles Determind By Stress-Wave Theory ? Synopsis

    By S. X. Liang

    In China, the bearing capacity predictions of the pile with Stress-Wave Theory have been developed rapidly in recent years. This paper recommended a DZH-3 Pile Driving Analyzer and its relevant comput

    Jan 1, 2010

  • DFI
    Capacity Of Piles And Settlement Of Pile Foundations

    By M. Mets

    Pile foundations have been used in Estonia since the beginning of 1960's. To evaluate the capacity of piles nearly 2,500 pile tests and 1,800 pile loading tests Have been carried out. The pile fo

    Jan 1, 2000

  • DFI
    Capacity Of Slender Steel Piles

    By J. Wennerstrand

    Slender steel piles have found an increased use in Sweden in resent years. These piles are often driven throw soft normally consolidated clay to refusal in till or at the rock surface. In contrast to

    Jan 1, 1989

  • DFI
    Capacity Prediction Vs. Performance Of Driven Pre-Cast Pre-Stressed Concrete Piles In Chesapeake, Virginia

    By Emad Farouz

    This paper compares the predicted axial capacity of driven Pre-cast Pre-stressed Concrete (PPC) piles for the Lake Gaston Water Treatment Plant (LGWTP) using several design methodologies versus the ax

    Jan 1, 2007

  • DFI
    Cape Wind Offshore Wind Farm – Electrical Service Platform – Substructure Jacket Design

    By S. Chilka, I. Maloney, J. Brady

    "The purpose of this project was to design the Electrical Service Platform (ESP) for the Cape Wind Offshore Wind Farm. The ESP structure comprises two primary parts: the topside platform housing the e

    Jan 1, 2017

  • DFI
    Capitol Area East End Complex Blocks 171 Through 174 Sacramento, California: A Case History Involving The Application Of APGD And APG Piling Methods ? Introduction

    By Brian R. Zuckerman

    The Capitol Area East End Complex is currently being constructed under contract with the State of California Department of General Services on two sites adjacent to the grounds of the California State

    Jan 1, 2002

  • DFI
    Capitol Complex Phase 1 Expansion

    By Eric S. Lindquist, Charles A. Luxford

    The State of Texas recently adopted a master plan to expand the existing Capitol Complex in Austin. Phase 1 of this expansion will add two new State office buildings and five levels of underground par

  • DFI
    Carbon Footprint Of Common Quay Structures

    By Dr Karsten Galipp, Kai-Julian I. Hendler, Prof. Manuel G. Pinheiro, Dr Peter J. Bourne-Webb

    With a share of approximately 11% of global greenhouse gas emissions, the construction industry contributes significantly towards climate change. This is why construction projects should not only be a

    May 1, 2022