Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • CIM
    Summary of twenty-four surface crown pillar case studies

    By D. Lessard, S. Nantel

    "Surface crown pillars are important Canadian,mining structures. Mines operating in the Canadian Shield usually have several, forming a first line of protection from surface elements.Detailed technica

    Jan 1, 1988

  • CIM
    Potential applications of knowledge-based systems in mining

    By A. Galibois, R. Singhal

    "This paper highlights some of the potential application areas of knowledge-based systems in the mining industry. The basic theoretical principles associated with knowledge-based systems are discussed

    Jan 1, 1988

  • CIM
    Dilution and geostatistics

    By Michel David

    "The usual complaint of mines is that grade does not match exploration expectations. Quite often, more tons are mined than expected but at a lower grade. This can be seen as dilution. Geostatistics ca

    Jan 1, 1988

  • CIM
    Process Development for Milling B-Zone Ore at Rabbit Lake

    By S. Dicarlo

    "In late 1985, B-zone ore was first processed through the Eldor Mines mill at Rabbit Lake. Extensive modifications had been completed in order to mill this ore. In-plant process development was initia

    Jan 1, 1988

  • CIM
    The transition of mining methods at Anderson Lake Mine

    By Seppo Haapamaki

    "Since it started production in 1970, Anderson Lake Mine has experienced several radical changes in mining methods as a result of the physical characteristics of the ore zone along with the need for i

    Jan 1, 1988

  • CIM
    Value Based Grinding Circuit Control

    By M. H. Moys, J. A. Finch, A. R. Laplante

    "A detailed review of ball milling circuit control practices in industry has been carried out. Based on fundamental process performance objectives, a standard system for base-level control of most bal

    Jan 1, 1988

  • CIM
    Productivity improvement in mechanized cut-and-fill mining at Trout Lake Mine

    By F. P. Yungwirth

    "IntroductionTrout Lake Mine is located about 5 km north of the Hudson Bay Mining and Smelting Co., Limited complex at Flin Flon, Manitoba. The mine was brought into production in 1982at the onset of

    Jan 1, 1988

  • CIM
    Geopolymer Applications in the Mining Industry

    By J. H. Pateson, D. C. Comrie, D. J. Ritcey

    "Geopolymers are inorganic semi-amorphous three dimensional silico-aluminates of the poly(sialate) type (-Si-O-Al-0-) or of the poly(sialate-siloxo) type (-Si-O-Al-O-Si-0-). Polycondensation occurs at

    Jan 1, 1988

  • CIM
    Geotechnical monitoring of tunnel boring machine drivages at the Donkin-Morien Mine, Nova Scotia

    By T. R. C. Aston, C. M. K. Yuen, J. L. Gilby

    "The access tunnels for the Donkin-Morien Mine in Cape Breton, Nova Scotia, comprise two parallel tunnels driven through a sedimentary sequence of sandstone, siltstone and mudstone to intersect the Ha

    Jan 1, 1988

  • CIM
    Aerosol frother addition in column flotation

    By P. MacPhail, G. S. Dobby, I. M. Flint

    "The objective of the laboratory work described in this paper has been to develop a method f or producing small gas bubbles at moderate to high gas rates in a flotation column. Small bubbles are parti

    Jan 1, 1988

  • CIM
    Fine tuning tax reform

    By Robert B. Parsons

    "The tax reform process marches on. The December 16, 1987 measures tabled by Finance Minister Michael Wilson represent one more step toward the objective of total reform of Canada's income and sa

    Jan 1, 1988

  • CIM
    New Frother and Collector Chemistry for Sulphide Mineral Flotation

    By D. E. M. Plaumann, B. S. Fee, R. D. Hansen, R. R. Klimpel

    "This paper briefly summaries the status of a recent program aimed at identifying new chemistry for use as sulfide mineral frothers and collectors. The background motivation and planning behind this w

    Jan 1, 1988

  • CIM
    The Start-up and Operation of the Gibraltar Mines SX-EW Plant (e864bb9e-42ee-4b0f-8109-3374578f0d92)

    By J. C. O'Rourke

    "Gibraltar Mines Ltd. has been operating its open pit copper mine for fifteen years. In that time over 140 million tons of waste and low grade material has been placed on the mine waste dumps. Laborat

    Jan 1, 1988

  • CIM
    Computerized cost estimating for underground mines

    By J. B. Scott

    "A computerized cost estimating program developed with the use of the Lotus 1-2-3 spreadsheet program has produced dramatic savings in preparing estimates for operating costs, equipment fleet size and

    Jan 1, 1988

  • CIM
    Till geochemistry as a technique for gold exploration in northern New Brunswick

    By A. G. Pronk, D. M. Burton

    "A regional till sampling program in the Upsalquitch Forks-Tetagouche Lakes area, centred some 70km west of the city of Bathurst, has proven an effective method for gold exploration in the heavily gla

    Jan 1, 1988

  • CIM
    Ore reserve estimation at the Enterprise Gold Mine, Pine Creek, Northern Territory, Australia. Part 2: the multigaussian kriging model

    By Neil Schofield

    "The estimation of recoverable ore reserves for feasibility in precious metal deposits such as Pine Creek must account not only f or the extreme variability of the ore grade but also for the complexit

    Jan 1, 1988

  • CIM
    The start-up and operation of the Gibraltar Mines SX-EW Plant

    By J. C. O'Rourke

    "Gibraltar Mines Ltd. has been operating its open pit copper mine for fifteen years. In that time, over 140 million tons of waste and low-grade material has been placed on the mine waste dumps. Labora

    Jan 1, 1988

  • CIM
    Aluminum mine shaft conveyances at Inco Ltd. an overview of problems encountered and solutions

    By Richard Mcivor, Largo Albert

    "Inco Limited has operated aluminum mine shaft conveyances since 1968. Aluminum conveyances are used where the hoisting in system requires lightweight conveyances to maintain the hoist rope safety fac

    Jan 1, 1988

  • CIM
    Failure and repair of a mine hoist drumshaft

    By James E. Rider

    "Fractures in mine hoist drumshafts are rare. We know of no previously reported attempts to repair a fractured drumshaft; any feasible method would involve welding and the associated problems of disto

    Jan 1, 1988

  • CIM
    Improved Seepage Water Quality by Establishing a Marsh on a Pyrrhotite Tailings Pong (1987 Final Report)

    By D. R. Griffiths

    "Oxidation of pyrrhotite prcxiuces sulphuric acid which in turn leaches out heavy metals, resulting in acidic contaminated seepages. The establishment of a marsh on top of the pyrrhotite would result

    Jan 1, 1988