Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • CIM
    Evaluation of spontaneous fire risk potential of underground coal mine panels

    By T. R. Roy

    "This paper presents an objective model for the estimation of fire risk potential of an underground coal mine panel by the bord-and-pillar method of mining where extraction is carried out by depillari

    Jan 1, 2003

  • CIM
    Future mining opportunities for fuel cell applications

    By A. R. Miller, M. C. Bétournay, D. L. Barnes

    "A number of successful proof-of-concept projects have been carried out to replace conventional power application, such as diesel and rechargeable batteries, in underground mine vehicles. This has led

    Jan 1, 2003

  • CIM
    Development of Barrick Gold’s Bulyanhulu Mine

    By John Frostiak

    "Kahama Mining Corporation Limited, a wholly owned subsidiary of Barrick Gold Corporation, poured the first dore bar and filtered the first concentrate produced at the Bulyanhulu mine on February 28,

    Jan 1, 2003

  • CIM
    Chapter 12. Determination and Payment

    By Karl J. C. Harries

    "12.1. NO DEPRECIATION/GAAPAll calculations and computations relating to the Royalty shall be carried out in accordance with generally accepted accounting principles consistently applied to the extent

    Jan 1, 2003

  • CIM
    Measurements of deformation and stress variations in mine pillars

    By A. P. Bois, K. Saleh, A. Ghorbal, V. Hajiabdolmajid, G. Ballivy

    "The knowledge of the initial stress field is not always sufficient to ensure the stability of mining stopes due to the high-stress variations generated by mining. Monitoring of these openings is then

    Jan 1, 2003

  • CIM
    The St. Lawrence deposit, Seeley’s Bay, SE Ontario — A major wollastonite skarn in the Frontenac Terrane

    By T. A. Grammatikopoulos, B. Vasily, A. H. Clark

    "The St. Lawrence deposit is a large wollastonite skarn (ca. 9 Mt @ 41.3% wollastonite) adjoining the gabbroic-to-syenitic Leo Lake pluton in the granulite facies Frontenac Terrane of the Grenvillian

    Jan 1, 2003

  • CIM
    The use of a geographic information system for open pit mine development (de800c65-f4bd-4609-9036-67a6837b7fd0)

    By U. Dillon, G. Blackwell

    "Geographic information systems (GIS) provide an efficient means for the recording, manipulation, revision, display and analysis of spatially referenced data. GIS are widely used at the exploration st

    Jan 1, 2003

  • CIM
    Small-scale mining using the modular gold processing unit at the Granada mine, Rouyn-Noranda, Quebec (d2911615-1db3-4ddc-ae0e-f3be18f048cf)

    By P. Trudel, É. Cabot, L. Cabot

    "A modular gold processing unit (MGPU) was designed, installed and operated over an eight-month period by RSW-Béroma at the Granada mine located near Rouyn-Noranda, Quebec. A description of the projec

    Jan 1, 2003

  • CIM
    Valuation Introduction

    By Lawrence Devon Smith, Keith Spence, William Roscoe

    "In March 2003 the CIM Council adopted and approved the document “Standards and Guidelines for Valuation of Mineral Properties” as developed by the Special Committee of the Canadian Institute of Minin

    Jan 1, 2003

  • CIM
    The U.S. Mineral Property Valuation Patchwork of Regulations and Standards (b596e322-36dd-40ba-820a-fc3646322652)

    By Trevor R. Ellis

    "The valuation of mineral properties in the U.S. is only partially regulated. The regulations which have jurisdiction or impact appear to have such mainly as a consequence of unintended fallout, since

    Jan 1, 2003

  • CIM
    Canadian Standards for Valuation of Mineral Properties

    By Deborah McCombe

    "and Bill Roscoe, Consulting Geologist and Principal with Scott Wilson Roscoe Postle AssociatesMineral property valuations are carried out for a variety of reasons, such as mergers and acquisitions, n

    Jan 1, 2003

  • CIM
    From Tribulation to Triumph – Flotation Improvements at the New Lac des Iles Concentrator

    By Tom Olsen, Tom Ohrling, Peter Taggart, Chris Martin

    "North American Palladium commissioned the new concentrator at the Lac des Iles mine in the summer of 2001. The 15,000 tonnes per day mill replaced the existing 2,400 tonnes per day facility, as part

    Jan 1, 2003

  • CIM
    Using Dynamic DCF and Real Options methods to value and assess flexible mine project design

    By Graham A. Davis, Michael Samis

    The dramatic fluctuation in metal and energy prices in the last few years is causing mining companies to consider alternative analytical methods for mine design and valuation. The goal is to improve i

    Jan 1, 2003

  • CIM
    Design, Construction, and Start-up of Stillwater Mining’s East Boulder Concentrator

    By P. Lefebvre, J. Sargent, K. Major, B. Darnton

    "Stillwater Mining commenced mining operations at Nye, Montana in 1987 for the recovery of platinum and palladium. Exploration identified that the J-M Reef extended for 43 km. In 1998 Stillwater Minin

    Jan 1, 2003

  • CIM
    The Nui Phao Tungsten-Fluorite-Copper-Gold-Bismuth Deposit, Northern Vietnam: An Opportunity for Sustainable Development

    By S. F. Dudka, T. Dang, M. L. Wong

    Abstract - The Nui Phao W-F-Cu-Au-Bi deposit is located in one of the poorest regions of northern Vietnam. The deposit is currently undergoing a pre-feasibility study by Tiberon Minerals Ltd., with a

    Jan 1, 2003

  • CIM
    The development of an integrated IT system at Albian Sands Energy (d99cbaf1-3943-4b92-a3a4-6b74c106073f)

    By L. H. Michaud

    "Albian Sands Energy (ASE), an oil sands surface mining and extraction operation, is currently undergoing start-up and is scheduled to ramp-up to full production by mid-2003. Startup includes the sele

    Jan 1, 2003

  • CIM
    Chapter 1. Formation of an Agreement

    By Karl J. C. Harries

    "1.1. WHAT ARE AGREEMENTS AND HOW ARE THEY FORMED?In order to have an agreement, at common law, there must be an offer, acceptance of that offer, and consideration passing between the parties. In addi

    Jan 1, 2003

  • CIM
    Factors Influencing the Expert System Profitability

    By Andy Fortin, André Vien, Christophe Bouché, Jeff McKay

    "The technology and equipment design of the Twenty-first Century permit us to exploit low-grade ore bodies with milled tonnages reaching 300,000 tpd. Because of their substantial operational costs (en

    Jan 1, 2003

  • CIM
    Mineralogical Tracing of Metallurgical Results - The Sarcheshmeh Copper Mine Case

    By S. Banisi, H. R. Iran-Manesh, M. R. Shayestefar, H. Shekarchyan

    "Flotation circuit of the Sarcheshmeh copper mine processes 41,000 t/d of ore at 0.9% Cu. Chalcopyrite and chalcocite are the main copper bearing minerals which are concentrated in three stages of rou

    Jan 1, 2003

  • CIM
    The St. Lawrence deposit, Seeley’s Bay, SE Ontario — A major wollastonite skarn in the Frontenac Terrane (ef6c9811-507f-4964-b191-8a798691efa4)

    By T. A. Grammatikopoulos, B. Vasily, A. H. Clark

    "The St. Lawrence deposit is a large wollastonite skarn (ca. 9 Mt @ 41.3% wollastonite) adjoining the gabbroic-to-syenitic Leo Lake pluton in the granulite facies Frontenac Terrane of the Grenvillian

    Jan 1, 2003