Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • CIM
    Institutionalizing Advanced Control on Newmont's Carlin Trend

    By A. I. Collins, D. Danninger

    Newmont has installed advanced control and online optimization on the dry grinding circuit and both roasters on its Carlin Trend refractory ore treatment plant. Subsequently, Newmont has developed a m

    Jan 1, 2005

  • CIM
    Update on Falconbridge's Sudbury Nickel Smelter

    By J. Chenier, M. Boissoneault, D. Ducharme, R. Schonewille

    The operation of Falconbridge's Sudbury nickel smelter has undergone significant change since the production was consolidated to a single electric furnace in 1994. In the late 1990's a capit

    Jan 1, 2005

  • CIM
    Instauration des détonateurs électroniques à la mine Beaufor

    By Steve Simard

    Suite aux excellents résultats, obtenus avec la technologie des détonateurs électroniques dans des chantiers longs trous de grandes dimensions, nous avons décidé d?étendre cette technologie dans les o

    Oct 1, 2004

  • CIM
    System Analysis and Simulation of Narrow Vein Mining Method with Underground Pre-concentration

    By Mario Morin

    The application of underground pre-concentration technology to narrow vein mining has the potential to change the entire economics of bulk mining methods when used in narrow vein situations. The rejec

    Oct 1, 2004

  • CIM
    Sous-niveaux retraités avec Alimak et chargement en vrac

    By Richard Lavallée

    La Mine Louvicourt est une mine hautement mécanisée exploitant un gisement polymétallique avec des chantiers transversaux minés et remblayés selon une séquence primaire-secondaire. Dans certaines part

    Oct 1, 2004

  • CIM
    Innovative Digital Instrumentation for Geotechnical Monitoring Systems

    By A. J. Hyett

    Due to the ongoing revolution in electronics and communications more cost-effective geotechnical instruments can be manufactured using digital technology. This new generation of digital instruments ha

    Oct 1, 2004

  • CIM
    A Two-Phase Backfill Approach to Dilution Control at the Doyon Mine

    By Emilie S. Williams

    The Doyon Mine?s Zone 1 (Altered Zone), found along the southern boundary of the mine, encompasses approximately 20% of the mining reserves. The mineralisation is found in a series of steeply dipping

    Oct 1, 2004

  • CIM
    Reducing Selectivity in Narrow-Vein Mining through the Integration of Underground Pre-concentration

    By Andrew Bamber

    The introduction of pre-concentration technology into the underground narrow-vein mining scenario has the potential to change the entire economics of utilizing bulk-mining methods in these situations.

    Oct 1, 2004

  • CIM
    Narrow vein mine design at the Hoyle Pond mine

    By John G. Henning

    The Hoyle Pond underground mine is located in the Porcupine Gold Camp, 18 km east of downtown Timmins. Since the initiation of production in 1985, the operation has produced in excess of 1.9 million o

    Oct 1, 2004

  • CIM
    ranches montantes remblayées avec plan incliné sur remblai dans la mine de fluorine d?Elhammam

    By Mohammed Rachek

    Résumé : la mine d?Elhammam, opération du groupe minier Marocain Managem, est située au sud de la ville de Meknes à 63 km, elle exploite un gisement de fluorine depuis 1974. La minéralisation se prése

    Oct 1, 2004

  • CIM
    Stope Sequence Optimization for Narrow Vein, Long Term Mine Planning

    By André van Wageningen

    Long term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos

    Oct 1, 2004

  • CIM
    Automation to Change the way we Mine in Narrow-Veins

    By Ben R. Bjorkman

    The future is here ? or at least that?s what Mine Planners predicted some 15 years ago ? that by 2004 we would have man-less mines running themselves using space-aged technology. Truthfully, though, t

    Oct 1, 2004

  • CIM
    Project for 4-A Vein Exploitation, Huantajalla Mine, Using Longhole Drillings as a new Method of Mining at the Uchucchacua Mining District

    By Juan C. Sotomayor Álvarez

    The Huantajalla mine is seated on Uchucchacua 's Mixing District that is the fourth producer of Silver in the world. Huantajalla Mine is a new mine that nowadays is being explored and recently it

    Oct 1, 2004

  • CIM
    The Photonic Probe: An Innovative Tool to Raise Ore Grades by Reducing Dilution

    By Vincent Doyon

    For several years, the GDD SSW EM Probe is being used in nickel?s mines in Canada and Brazil to define ore limits, reduce dilution and predict nickel grades. It is used with success to test most if no

    Oct 1, 2004

  • CIM
    Forecasting copper prices in the short and medium terms using geostatistics

    In this paper, geostatistical techniques are applied to forecast the annual copper price in the short and medium terms (from one to five years ahead). These techniques allow the incorporation of month

    Sep 1, 2004

  • CIM
    The safety imperative?transforming the workplace to protect people

    By G. Winkel

    Safety conditions in industry have greatly improved over time. However, around the world, in Canada, and in each province or territory, people are still the victims of serious industrial accidents. Th

    Sep 1, 2004

  • CIM
    Optimization of shovel-truck systems using the queuing theory - Optimisation des systèmes pelles?camions en utilisant la théorie des files d?attente

    By D. Komljenovic

    This paper presents the use of queuing theory in truck fleet sizing in open pit mining operations. In the first part, a methodology is developed by which an optimal ratio between the size of shovels a

    Sep 1, 2004

  • CIM
    A Review of Long Distance Commuting Mines: Implications for Northern Mining Communities

    By Silvana Costa

    In the last two decades, there have been nearly no new mining towns built in Canada. Governments and mining companies have viewed long distance commuting (LDC), commonly known as fly-in-flyout or fly-

    May 1, 2004

  • CIM
    Settlement of Tailings Slurries by Creep Compression

    By J. Don Scott

    Analytical predictions of the rate and magnitude of settlement of deposited oil sands tailings slurries generally overestimate how fast pore pressures will dissipate. Field deposits of nonsegregating

    May 1, 2004

  • CIM
    Technology: Is it working for you?

    By C. Graham

    Mechanisation has been a predominant theme of the past 50 years in the mining industry, particularly underground mining. As the level of technology employed has increased, the anticipated productivity

    May 1, 2004